B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Traffic

5-3Work Zone Traffic Control

VA · 2024 Standard SpecificationsBook pages 3132View official source ↗

Work zone traffic control design follows MUTCD Part 6 and VA standard traffic control plans. All work zone designs require a Transportation Management Plan (TMP) for significant projects per FHWA Rule 23 CFR 630 Subpart J. Temporary pavement markings shall be retroreflective tape or paint. Minimum lane width in work zones: 11 ft (10 ft with engineering study). Speed reduction through work zones limited to 10 mph below normal posted speed.

All work under this section shall comply with VDOT current standards and applicable AASHTO, ASTM, and federal requirements. The Engineer has authority to accept or reject materials and workmanship that do not conform to the specifications.

Source: VDOT Highway Design Manual, 2024 Edition. Pages 3132 of 37.