973 CONCRETE GUTTER AND DUMPED ROCK GUTTER, 519 633.1 -Description, 519 633.2 -Materials, 519 633.3 -General, 519 633.4 -Concrete Gutter, 519 633.5 -Dumped Rock Gutter, 520 633.6 -Method of Measurement, 521 633.7 -Basis of Payment, 521 633.8 -Pay Items, 521 CONCRETE PAVEMENT CROSS STITCHING, 286 513.1 -Description, 286 513.2 -Materials, 286 513.3 -Equipment and Tools, 286 513.4 -Construction Methods, 286 513.5 -Opening to Traffic, 28 8 513.6 -Method of Measurement, 288 513.7 -Basis of Payment, 289 513.8 -Pay Item, 289 CONCRETE PAVEMENT REPAIR, 263 506.1 -Description, 263 506.2 -Materials, 263 506.3 -Proportioning, 263 506.4 -Testing, 264 506.5 -Equipment and Tools, 264 506.6 -Construction Metho ds, 264 506.7 -Ride Acceptance, 269 506.8 -Method of Measurement, 269 506.9 -Basis of Payment, 269
506.10 Pay Items, 270
CONCRETE SLAB STABILIZATION, 283 512.1 -Description, 283 512.2 -Materials, 283 512.3 -Proportioning, 283 512.4 -Equipment, 283 512.5 -Construction Methods, 284 512.6 -Opening to Traffic, 285 512.7 -Method of Measurement, 285 512.8 -Basis of Payment, 285 512.9 -Pay Items, 285 CONSTRUCTION SURVEYING, 547 639.1 -Description, 547 639.2 -Materials, 547 639.3 -Construction Layout Stakes, 547 639.4-As-Built Utility Survey, 548 639.5 -Method of Measurement, 550 639.6 -Basis of Payment, 550 639.7 -Pay Items, 550 CONTROL OF MATERIALS, 39 106.1 -Source of Supply and Quality Requirements, 39 106.2 -Local Material Sources, 41 106.3 -Samples, 42 106.4 -Plant I nspection, 43 106.5 -Storage of Materials, 43 106.6 -Handling Materials, 44 106.7 -Unacceptable Materials, 44 106.8 -Division -Furnished Material, 44 106.9 -Silence of Specifications, 44 CONTROL OF WORK, 27 105.1 -Authority of The Engineer, 27 105.2 -Plans and Wor king Drawings, 27 105.3 -Conformity With Plans and Specifications, 31 105.4 -Coordination of Plans, Specifications, Supplemental Specifications, and Special Provisions, 31 105.5 -Cooperation by Contractor, 31 105.6 -Cooperation With Utilities, 32 105.7 -Cooperation Between Contractors, 33 105.8 -Construction Stakes, Lines and Grades, 33 105.9 -Authority and Duties of The Project Engineer or Project Supervisor, 34
105.10 Authority and Duties Of The Inspector, 34
105.11 Inspection of Work and Materials, 34
105.12 Removal of Unacceptable and Unauthorized
Work, 35
105.13 Load Restrictions, 35
105.14 Maintenance During Construction, 35
105.15 Failure to Maintain Roadway or Structure, 36
105.16 Acceptance, 36
105.17 Claims for Adjustment and Disputes, 37
CON TROLLED LOW -STRENGTH MATERIAL, 144 219.1 -Description, 144 219.2 -Materials, 144 219.3 -Properties, 144 219.4 -Construction Methods, 144 219.5 -Method of Measurement, 146 219.6 -Pay Item, 146 CRACK SEALING IN ASPHALT PAVEMENT, 183 403.1 -Description, 183 403.2 -Materials, 183 403.3 -Weather Restrictions, 183 403.4 -Construction, 183 403.5 -Method of Measurement, 184 403.6 -Basis of Payment, 184 403.7 -Pay Item, 184 CRUSHED AGGREGATE BASE COURSE, 151 307.1 -Description, 151 307.2 -Materials, 151 307.3 -Equipment, 153 307.4 -Placing, 153 307.5 -Compacting, 154 307.6 -Tolerance, 154 307.7 -Maintenance, 154 307.8 -Method of Measurement, 154 307.9 -Basis of Payment, 155
307.10 Pay Items, 156
CURBS, COMBINATION CURBS AND GUTTERS AND MEDIANS, 426 610.1 -Descrip tion, 426 610.2 -Materials, 426 610.3 -Plain Concrete Curbing, Integral Concrete Curbing, and Combination Concrete Curb and Gutter, 428 610.4: Blank, 429 610.5 -Asphalt Curbing, 429 610.6 -Median Barrier, 430 610.7 -Raised Concrete Traffic Island, 430 610.8 -Method of Measurement, 430 610.9 -Basis of Payment, 431
610.10 Pay Items, 431
DEFINITION OF TERMS, 1 101.1 -Abbreviations, 1 101.2 -Definitions, 2 101.3 -Interpretations, 9 974 DIAMOND GRINDING, 272 508.1 -Description, 272 508.2 -Equipment, 272 508.3 -Construction, 272 508.4 -Final Surface Finish, 272 508.5 -Slurry Removal, 273 508.6 -Smoothness Requirements, 273 508.7 -Method of Measurement, 274 508.8 -Basis of Payment, 274 508.9 -Smoothness, 274
508.10 Pay Items, 274
DISMANTLING STRUCTURES, 103 203.1 -Description, 103 203.2 -Materials, 103 203.3 -Construction Methods, 103 203.4 -Method of Measurement, 104 203.5 -Basis of Payment, 104 203.6 -Pay Item, 104 DOWEL BAR RETROFIT, 277 511.1 -Description, 277 511.2 -Materials, 277 511.3 -Construction Methods, 278 511.4 -Opening To Traffic, 281 511.5 -Dowel Bar Alignment Assurance, 281 511.6 -Test Section, 281 511.7 -Method of Measurement, 282 511.8 -Basis of Payment, 282 511.9 -Pay Items, 282 ELECTRICAL WORK, 518 631.1 -Description, 518 631.2 -Materials, 518 631.3 -Construction Methods, 518 631.4 -Method Of Measurement, 518 631.5 -Basis Of Payment, 518 631.6 -Pay Item, 518 EMBANKMENT AND SUBGRADE MATERIAL, 959 716.1 -General, 959 716.2 -Test Methods, 960 716.3 -Moisture and Density Requirements, 960 716.4 -Embankment Organic Content, 961 716.5 -Acceptance of Embankment and Subgrade, 961 EXCAVATION AND EMBANKMENT, 111 207.1 -Description, 111 207.2 -Materials, 111 207.3 -Roadway Excavation, 112 207.4 -Benches, 113 207.5 -Ditches, 113 207.6 -Disposal of Material, 114 207.7 -Formi ng and Compacting Embankment, 117 207.8 -Finishing Earth Roads, 121 207.9 -Subgrade, 121
207.10 Shoulders, 123
207.11 Drainage, 123
207.12 Temporary Surcharge, 123
207.13 Protection of Curtain Walls, 124
207.14 Slides and Slipouts, 124
207.15 Method of Measurement, 124
207.16 Basis of Payment, 125
207.17 Pay Items, 126
FIELD OFFICE AND STORAGE BUILDING, 551 640.1 -Description, 551 640.2 -Materials, 551 640.3 -Location and Time Of Erection, 551 640.4 -Field Office, 551 640.5 -Storage Buildin g, 552 640.6 -Liability for Property in Office/Storage Structures, 553 640.7 -Maintenance, 553 640.8 -Removal, 553 640.9 -Alternate for Office Building, 553
640.10 Equipment, 553
640.11: Blank, 554
640.12 Method of Measurement, 554
640.13 Basis of Payment, 554
640.14 Pay Items, 555
FIELD PAINTING OF METAL STRUCTURES, 762 688.1 -Description, 762 688.2 -General, 762 688.3 -Complete Painting of Existing Structures, 765 688.4 -Zone Painting of Existing Structures, 767 688.5 -Field Painting of Shop Prime -Coat ed Steel, 768 688.6 -Environmental, Worker Protection, and Waste Handling, 768 688.7 -Method of Measurement, 770 688.8 -Basis of Payment, 770 688.9 -Pay Items, 770 FINE AGGREGATE, 776 702.1 -Fine Aggregate for Portland Cement Concrete, 776 702.2 -Mortar Sand, 777 702.3 -Fine Aggregate for Asphalt Mixtures, 777 702.4 -Mineral Filler for Asphalt Mixtures, 777 702.5 -Lightweight Fine Aggregate for Structural Concrete, 777 702.6 -Alternate Grading, 777 FOG SEAL, 191 407.1 -Description, 191 407.2 -Mater ials, 191 407.3 -Weather Restriction, 191 407.4 -Equipment, 191 407.5 -Preparing and Repairing Existing Surfaces, 192 407.6 -Cleaning and Sweeping, 192 407.7 -Application of Asphalt Material, 192 407.8 -Application of Cover Aggregate, 192 407.9 -Protection of The Pavement and Traffic Control, 193
407.10 Quantities of Materials, 193
407.11 Method of Measurement, 193
407.12 Basis of Payment, 193
407.13 Pay Item, 193
FURNISHING AND PLACING TOPSOIL, 573 651.1 -Description, 573 651.2 -Materials, 573 651.3 -Stripping Topso il, 573 651.4 -Transporting, 573 651.5 -Placing and Manipulating, 573 651.6 -Method of Measurement, 574 651.7 -Basis of Payment, 574 651.8 -Pay Items, 574