6-2Utility Coordination

NC · 2024 Standard SpecificationsBook pages 3536View official source ↗

Utility coordination follows FHWA regulations (23 CFR 645) and NC utility accommodation policy. Utility relocations required when existing facilities conflict with the project design. NCDOT coordinates with utility owners per the Utility Accommodation Policy manual. Longitudinal utility installations within Interstate ROW require specific approval. Utility adjustment costs may be eligible for federal participation per FHWA policy when on public ROW under prior rights.

References: AASHTO current edition, NC Standard Specifications, FHWA Technical Advisories, and applicable federal regulations (23 CFR). Contractors shall maintain current copies of all referenced standards on the project site.

Source: NCDOT Highway Design Manual, 2024 Edition. Pages 3536 of 37.