B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Boise, Idaho Building Permit Cost Calculator

Estimates permit cost in Boise from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Total valuation $25,001.00 to $50,000.00
$362.80 for the first $25,000.00 plus $9.30 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
see rule
Total valuation $50,001.00 to $100,000.00
$595.30 for the first $50,000.00 plus $6.35 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
see rule
○Total valuation $100,001.00 and up
$913.09 for the first $100,000.00, plus 150 x $5.17 for $150,000.00 over (rounded up per "or fraction thereof") = $1,688.59
$1,688.59
○Reinspection fee
Flat fee $55.00
$55.00
○Energy code inspection fee
Flat fee $55.00
$55.00
○After hours inspection (two hour minimum)
Flat fee $83.00
$83.00
Residential plan review · add-on
20% of the building permit fee — select the permit fee line above to calculate
see rule
○Certificate of occupancy only plan review and inspection
Flat fee $175.00
$175.00
○Residential solar photovoltaic permit
Flat fee $165.00
$165.00
○Appeal fee
Flat fee $150.00
$150.00
How this jurisdiction calculates the fee

Building permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023, with residential plan review for one- and two-family dwellings, townhouses and their accessory structures added at 20% of the building permit fee. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page.

Source: published fee schedule · Verified 9/17/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Residential plan review · add-on
20% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Deck permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023, with residential plan review added at 20% of the building permit fee. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url pointed at cityofboise.org/departments/planning-and-development-services/fees/, which is an Angular index that prints no dollar amounts at all (curl returns "{{doc.Title}}" placeholders). Rendered with headless Chromium, that index links the department's actual schedules, and they were downloaded and read in full today. Boise City Building Code Fee Schedule (10-1-23) prints the valuation ladder verbatim: "$1.00 to $2,000.00 - $26.37 for the first $500.00 plus $2.95 for each additional $100.00", "$2,001.00 to $25,000.00 - $70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00", and "Reinspection fee: $55". Boise City Plumbing Code Fee Schedule (10-1-21) Table B(3) prints "Water or waste re-piping $80", "Re-plumbing entire house or unit: $110", "Installation of single fixtures or appliances including bidets, bathtubs, showers, hot water heaters... $55", the $32 residential base permit fee and "Water heaters $12 Each". fee_source_url now points at the schedule that carries each row's figures. No figure changed; these remain the current schedules the city links.

Source: published fee schedule · Verified 11/9/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single branch circuit, including electric hot water heaters, wall heaters, electric vehicle outlets, fans, single outlets, and air conditioner or heat pump condensers
Flat fee $55.00
$55.00
○More than one branch circuit installed or altered for an addition, alteration, repair or fixture replacement
Flat fee $110.00
$110.00
○Photovoltaic system
Flat fee $110.00
$110.00
○Radiant floor
Flat fee $110.00
$110.00
○Swimming pools
Flat fee $165.00
$165.00
○Hot tub or spa
Flat fee $110.00
$110.00
○Miscellaneous residential
Flat fee $110.00
$110.00
New dwelling up to 2,500 square feet
$135 per dwelling unit
see rule
○New dwelling 2,501 to 3,500 square feet
Flat fee $155.00
$155.00
○New dwelling 3,501 to 4,500 square feet
Flat fee $175.00
$175.00
New dwelling 4,501 square feet and above
$210 per dwelling unit plus $65 for each additional 1,000 sq. ft. or portion thereof over 4,501 sq. ft.
see rule
How this jurisdiction calculates the fee

Electrical permit fees are set by flat amounts in the Electrical Code Fee Schedule, which charges by scope of work for existing dwellings and by conditioned square footage for new dwellings.

Source: published fee schedule · Verified 9/18/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
How this jurisdiction calculates the fee

Fence permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url pointed at cityofboise.org/departments/planning-and-development-services/fees/, which is an Angular index that prints no dollar amounts at all (curl returns "{{doc.Title}}" placeholders). Rendered with headless Chromium, that index links the department's actual schedules, and they were downloaded and read in full today. Boise City Building Code Fee Schedule (10-1-23) prints the valuation ladder verbatim: "$1.00 to $2,000.00 - $26.37 for the first $500.00 plus $2.95 for each additional $100.00", "$2,001.00 to $25,000.00 - $70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00", and "Reinspection fee: $55". Boise City Plumbing Code Fee Schedule (10-1-21) Table B(3) prints "Water or waste re-piping $80", "Re-plumbing entire house or unit: $110", "Installation of single fixtures or appliances including bidets, bathtubs, showers, hot water heaters... $55", the $32 residential base permit fee and "Water heaters $12 Each". fee_source_url now points at the schedule that carries each row's figures. No figure changed; these remain the current schedules the city links.

Source: published fee schedule · Verified 11/9/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
○Reinspection fee
Flat fee $55.00
$55.00
How this jurisdiction calculates the fee

Re-roofing permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url pointed at cityofboise.org/departments/planning-and-development-services/fees/, which is an Angular index that prints no dollar amounts at all (curl returns "{{doc.Title}}" placeholders). Rendered with headless Chromium, that index links the department's actual schedules, and they were downloaded and read in full today. Boise City Building Code Fee Schedule (10-1-23) prints the valuation ladder verbatim: "$1.00 to $2,000.00 - $26.37 for the first $500.00 plus $2.95 for each additional $100.00", "$2,001.00 to $25,000.00 - $70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00", and "Reinspection fee: $55". Boise City Plumbing Code Fee Schedule (10-1-21) Table B(3) prints "Water or waste re-piping $80", "Re-plumbing entire house or unit: $110", "Installation of single fixtures or appliances including bidets, bathtubs, showers, hot water heaters... $55", the $32 residential base permit fee and "Water heaters $12 Each". fee_source_url now points at the schedule that carries each row's figures. No figure changed; these remain the current schedules the city links.

Source: published fee schedule · Verified 11/9/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Total valuation $25,001.00 to $50,000.00
$362.80 for the first $25,000.00 plus $9.30 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
see rule
How this jurisdiction calculates the fee

Retaining wall permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023.

Source: published fee schedule · Verified 9/18/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $1.00 to $2,000.00
$26.37 for the first $500.00 plus $2.95 for each additional $100.00 or fraction thereof, to and including $2,000.00
see rule
Total valuation $2,001.00 to $25,000.00
$70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Residential plan review · add-on
20% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Accessory structure permit fees are calculated from total project valuation using Table No. 1-A of the Boise City Building Code Fee Schedule dated October 2023, with residential plan review for accessory structures added at 20% of the building permit fee. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page. | 2026-10-20 (lane B run 2153): the cited PDF (media/17652, 10-1-23 file) now carries "Oct. 2023" footers, so a 2023 edition exists at this URL, contradicting the 2026-09-14 note that none exists. Stored Table 1-A figures ($26.37/$2.95, $70.76/$12.71, 20% plan review) all re-confirmed in it; no figure changed.

Source: published fee schedule · Verified 11/10/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Installation of single fixtures or appliances including hot water heaters
Flat fee $55.00
$55.00
○Base permit fee under the per-fixture table
Flat fee $32.00
$32.00
○Water heaters, per-fixture charge
Flat fee $12.00
$12.00
○Water or waste re-piping
Flat fee $80.00
$80.00
○Re-plumbing entire house or unit
Flat fee $110.00
$110.00
How this jurisdiction calculates the fee

Water heater work is permitted under the Plumbing Code Fee Schedule dated October 2021, which charges either a flat single-fixture fee or a base permit fee plus a per-fixture charge depending on the table applied. | 2026-09-14 (lane B run 1068): DOCUMENT DATE CORRECTED. The basis said "Fee Schedule dated October 2023"; the schedule actually in force is captioned Oct. 2021 on every page footer (cityofboise.org/media/8321/final-boise-city-building-code-fee-schedule-10-1-21.pdf, plumbing at media/8324/final-plumbing-code-fee-schedule-10-1-21.pdf). No 2023 revision exists. Both PDFs were downloaded and read in full this pass and every stored figure is confirmed verbatim. NOTE FOR FUTURE PASSES: cityofboise.org/departments/planning-and-development-services/fees/ is an Angular page whose fee list never renders to a non-browser client (the HTML contains only {{item.Title}} placeholders), so the schedule PDFs must be fetched by their media/ paths, not scraped from the fees page. 2026-09-17 (lane B run 1390, pipeline run 94): SOURCING GAP CLOSED. fee_source_url pointed at cityofboise.org/departments/planning-and-development-services/fees/, which is an Angular index that prints no dollar amounts at all (curl returns "{{doc.Title}}" placeholders). Rendered with headless Chromium, that index links the department's actual schedules, and they were downloaded and read in full today. Boise City Building Code Fee Schedule (10-1-23) prints the valuation ladder verbatim: "$1.00 to $2,000.00 - $26.37 for the first $500.00 plus $2.95 for each additional $100.00", "$2,001.00 to $25,000.00 - $70.76 for the first $2,000.00 plus $12.71 for each additional $1,000.00", and "Reinspection fee: $55". Boise City Plumbing Code Fee Schedule (10-1-21) Table B(3) prints "Water or waste re-piping $80", "Re-plumbing entire house or unit: $110", "Installation of single fixtures or appliances including bidets, bathtubs, showers, hot water heaters... $55", the $32 residential base permit fee and "Water heaters $12 Each". fee_source_url now points at the schedule that carries each row's figures. No figure changed; these remain the current schedules the city links.

Source: published fee schedule · Verified 11/9/2026

See the full write-up: Boise building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.