Baltimore, Maryland Building Permit Cost Calculator
Estimates permit cost in Baltimore from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
New buildings and additions, 1- and 2-family dwellings $10 for each 1,000 cubic feet or fraction of 1,000 cubic feet of gross volume, including all basements and cellars | see rule |
○Minimum, new building, 1- and 2-family dwellings Flat fee $150.00 | $150.00 |
○Minimum, addition, 1- and 2-family dwellings Flat fee $75.00 | $75.00 |
New buildings and additions, all others $20 for each 1,000 cubic feet or fraction of 1,000 cubic feet of adjusted gross volume, including all basements and cellars | see rule |
○Structures accessory to a principal occupancy, 100 square feet or less of gross floor area Flat fee $25.00 | $25.00 |
○Structures accessory to a principal occupancy, over 100 square feet of gross floor area Flat fee $50.00 | $50.00 |
○Alterations and repairs, 1- and 2-family dwellings $0.30 x 2,000 = $600.00 | $600.00 |
○Minimum, alterations and repairs, 1- and 2-family dwellings Flat fee $50.00 | $50.00 |
Alterations limited to the exterior, 1- and 2-family dwellings $10 for each $1,000 or fraction of $1,000 estimated cost, subject to a minimum fee of $50 | see rule |
○Interior only demolition $0.02 x 2,000 = $40.00 | $40.00 |
○Swimming pools, 1- and 2-family dwellings Flat fee $50.00 | $50.00 |
○Application fee, 1- and 2-family dwellings, no plan review Flat fee $25.00 | $25.00 |
○Application fee, 1- and 2-family dwellings, plan review required Flat fee $125.00 | $125.00 |
Reinspection $50 for a 1st reinspection, $100 for a 2nd reinspection, and $125 for a 3rd and every subsequent reinspection | see rule |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Construction permit fees are itemized by work type in the adopted fee schedule: new buildings and additions are charged by gross volume, alterations and repairs are charged by affected gross floor area, and certain categories such as exterior-only alterations are charged per $1,000 of estimated cost.
Source: published fee schedule · Verified 10/30/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
109.6.1(a)(1) New buildings and additions, 1- and 2-family dwellings $10 for each 1,000 cubic feet or fraction of 1,000 cubic feet of gross volume, including all basements and cellars | see rule |
○109.6.1(a)(1) Minimum - Additions Flat fee $75.00 | $75.00 |
109.6.1(c)(1) Alterations and repairs, 1- and 2-family dwellings, exception for alterations limited to the exterior $10 for each $1,000 or fraction of $1,000 estimated cost, subject to a minimum fee of $50 | see rule |
○109.6.1(b) Structures accessory to a principal occupancy, each structure over 100 square feet of gross floor area Flat fee $50.00 | $50.00 |
○109.5.7 Application fee, 1- and 2-family dwellings, applications that do not require construction documents for plan review Flat fee $25.00 | $25.00 |
○109.5.7 Application fee, 1- and 2-family dwellings, applications that require construction documents for plan review Flat fee $125.00 | $125.00 |
109.7 Building Code Permit Tax · add-on 5% of the final cost of that permit, rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
○109.3 Minimum fee or service charge Flat fee $25.00 | $25.00 |
How this jurisdiction calculates the fee
Baltimore City Building Code Section 109 has no deck-specific line. DHCD handles a residential deck under the One and Two Family Combo Permit in the New Construction / Additions category, which Section 109.6.1(a)(1) prices by gross volume at a rate per 1,000 cubic feet subject to a minimum for additions; a deck limited to exterior work can instead fall under the exterior-alteration exception in 109.6.1(c)(1), charged per $1,000 of estimated cost. Every permit also carries a non-refundable application fee, a $25 general minimum, and a 5% Building Code Permit Tax on the final permit cost.
Source: published fee schedule · Verified 11/5/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical service wiring and equipment, 0 to 100 amperes Flat fee $25.00 | $25.00 |
○Electrical service wiring and equipment, over 100 to 200 amperes Flat fee $30.00 | $30.00 |
○Electrical service wiring and equipment, over 200 to 400 amperes Flat fee $40.00 | $40.00 |
New branch circuits, feeders, and extensions to or replacements of branch circuits $6 for each circuit | see rule |
○Installing electrical fixtures or devices only, 1 to 25 fixtures Flat fee $25.00 | $25.00 |
○Fixtures or devices, each additional 25 or fraction of 25 Flat fee $5.00 | $5.00 |
○Photovoltaic system, 1 to 25 photovoltaic panels Flat fee $25.00 | $25.00 |
○Photovoltaic system, each additional 10 panels or fraction of 10 Flat fee $5.00 | $5.00 |
○Low voltage wiring, 1 to 25 devices Flat fee $25.00 | $25.00 |
○Electrical work not otherwise classified Flat fee $25.00 | $25.00 |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Electrical permit fees are itemized in the adopted fee schedule, with service wiring and equipment priced by ampere rating, new branch circuits priced per circuit, and fixtures, devices, and photovoltaic panels priced in blocks.
Source: published fee schedule · Verified 11/16/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Fences $10 for each 100 linear feet or fraction of 100 linear feet | see rule |
○Minimum fee or service charge Flat fee $25.00 | $25.00 |
○Application fee, 1- and 2-family dwellings, no plan review Flat fee $25.00 | $25.00 |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Fence permit fees are charged by the length of fence under the adopted fee schedule, subject to the general minimum fee.
Source: published fee schedule · Verified 11/2/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
No permit fee applies to an ordinary reroof: Baltimore City Building Code Section 105.2 lists Replacing roof shingles (item 17) and Replacing roof tarring (item 18) as work for which permits are not required, so no permit is issued and nothing is charged. Section 109 publishes no roofing line.
Source: published fee schedule · Verified 8/12/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Retaining walls $10 for each 100 square feet or fraction of 100 square feet of area above footing | see rule |
○Minimum fee or service charge Flat fee $25.00 | $25.00 |
○Application fee, 1- and 2-family dwellings, no plan review Flat fee $25.00 | $25.00 |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Retaining wall permit fees are charged by the area of wall above the footing under the adopted fee schedule, subject to the general minimum fee.
Source: published fee schedule · Verified 11/16/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Structures accessory to a principal occupancy, 100 square feet or less of gross floor area Flat fee $25.00 | $25.00 |
○Structures accessory to a principal occupancy, over 100 square feet of gross floor area Flat fee $50.00 | $50.00 |
○Application fee, 1- and 2-family dwellings, no plan review Flat fee $25.00 | $25.00 |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Structures accessory to a principal occupancy are charged a flat fee by gross floor area under Section 109 of the Building, Fire, and Related Codes of Baltimore City, and the nonrefundable application fee and the Building Code Permit Tax also apply.
Source: published fee schedule · Verified 11/2/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Electrical water heaters, new construction or replacement Flat fee $20.00 | $20.00 |
○Fuel-burning equipment and appliances, 0 to 200,000 BTU per hour input per unit Flat fee $30.00 | $30.00 |
○Install, replace, or reconstruct plumbing fixtures Flat fee $5.00 | $5.00 |
○Fuel oil or natural gas piping, new or replacement, 1- and 2-family dwellings Flat fee $25.00 | $25.00 |
○Minimum fee or service charge Flat fee $25.00 | $25.00 |
Building Code Permit Tax · add-on 5% of the final cost of that permit rounded up to the nearest whole dollar — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Water heater work is priced under the plumbing and mechanical items of the adopted fee schedule, with a flat charge per unit for electrical water heaters and a charge based on BTU-per-hour input for fuel-burning appliances, subject to the general minimum fee.
Source: published fee schedule · Verified 11/16/2026
See the full write-up: Baltimore building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.