B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Portland, Maine Building Permit Cost Calculator

Estimates permit cost in Portland from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Cost of work up to $1,000
Flat fee $25.00
$25.00
○Each additional $1,000 of work
Flat fee $15.00
$15.00
○Historic Review fee (any exterior work in a Historic District)
Flat fee $82.00
$82.00
○Certificate of Occupancy inspection
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

Set by the City of Portland Permitting and Inspections Department on the declared cost of work: $25.00 for the first $1,000 of work plus $15.00 for each additional $1,000, per the Building Permits and Inspections Fee Schedule revised 7/2026. The cost of construction submitted with the application must include electrical and plumbing work but may exclude HVAC and fire alarm/sprinkler work reviewed under separate sub-permits, and the City reserves the right to reevaluate an understated cost against RSMeans and assess a larger fee. Additional charges may apply, including an $82.00 Historic Review fee for any exterior work in a Historic District and a $100.00 Certificate of Occupancy inspection. All amounts are municipal charges - Maine municipalities set their own permit fees and no state fee is added - and starting construction before obtaining a permit may double the fee under Sec 6-92(d) of the City Code of Ordinances.

Source: published fee schedule · Verified 10/30/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Cost of work up to $1,000
Flat fee $25.00
$25.00
○Each additional $1,000 of work
Flat fee $15.00
$15.00
○Historic Review fee (any exterior work in a Historic District)
Flat fee $82.00
$82.00
How this jurisdiction calculates the fee

Portland publishes no deck-specific permit fee. A deck is charged under the General Building Permit Fees, which the fee schedule states apply to all construction work: $25.00 for the first $1,000 of cost of work plus $15.00 for each additional $1,000, per the Building Permits and Inspections Fee Schedule revised 7/2026. The declared cost must include any associated electrical and plumbing work, and the City may reevaluate an understated cost against RSMeans. An $82.00 Historic Review fee applies to exterior work in a Historic District; these are City of Portland charges, as Maine municipalities set their own permit fees and no state fee is added.

Source: published fee schedule · Verified 10/30/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Administrative fee / minimum fee (applies to all electrical permits)
Flat fee $75.00
$75.00
○Outlets (receptacles/lights/drops), 1-20
Flat fee $12.00
$12.00
○Single phase service up to 200A
Flat fee $25.00
$25.00
○240V (208V) dedicated circuits up to 50 amps (each)
Flat fee $10.00
$10.00
○Solar array up to 25KW
Flat fee $75.00
$75.00
○Sub panels (remote from the main)
Flat fee $15.00
$15.00
How this jurisdiction calculates the fee

Electrical permits are priced under a separate Electrical Permit Fees section rather than by cost of work. A $75.00 administrative fee, which is also the minimum fee, applies to every electrical permit, and itemized charges are then added for services, sub-panels, dedicated circuits, outlets, devices, motors, transformers, generators, solar arrays, pools and similar equipment, per the Building Permits and Inspections Fee Schedule revised 7/2026. Starting electrical work before obtaining a permit subjects the party to double the permit fee. These are City of Portland charges; Maine municipalities set their own permit fees and no state fee is added.

Source: published fee schedule · Verified 11/2/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Cost of work up to $1,000
Flat fee $25.00
$25.00
○Each additional $1,000 of work
Flat fee $15.00
$15.00
○Historic Review fee (any exterior work in a Historic District)
Flat fee $82.00
$82.00
How this jurisdiction calculates the fee

Fences seven feet or less in height are listed by the City among projects that do not need a building permit, so no permit fee is charged. A taller fence requires a building permit, and Portland publishes no fence-specific fee: the General Building Permit Fees for all construction work apply at $25.00 for the first $1,000 of cost of work plus $15.00 for each additional $1,000, per the Building Permits and Inspections Fee Schedule revised 7/2026. An $82.00 Historic Review fee applies to any exterior work in a Historic District, which can apply to a fence even where no building permit is required. All amounts are municipal charges, as Maine municipalities set their own permit fees and no state fee is added.

Source: published fee schedule · Verified 10/30/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Cost of work up to $1,000
Flat fee $25.00
$25.00
○Each additional $1,000 of work
Flat fee $15.00
$15.00
○Historic Review fee (any exterior work in a Historic District)
Flat fee $82.00
$82.00
How this jurisdiction calculates the fee

Re-shingling a roof with no structural change is listed by the City among projects that do not need a building permit, in which case no permit fee is charged. Where roofing work does involve structural change and a permit is required, Portland publishes no reroof-specific fee: the General Building Permit Fees for all construction work apply at $25.00 for the first $1,000 of cost of work plus $15.00 for each additional $1,000, per the Building Permits and Inspections Fee Schedule revised 7/2026. The City may reevaluate an understated cost of construction against RSMeans. An $82.00 Historic Review fee applies to any exterior work in a Historic District even where the roofing itself is permit-exempt; all amounts are municipal charges, as Maine municipalities set their own permit fees and no state fee is added.

Source: published fee schedule · Verified 11/2/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Cost of work up to $1,000
Flat fee $25.00
$25.00
○Each additional $1,000 of work
Flat fee $15.00
$15.00
○Historic Review fee (any exterior work in a Historic District)
Flat fee $82.00
$82.00
How this jurisdiction calculates the fee

Portland publishes no shed-specific or accessory-structure permit fee. A shed requiring a permit is charged under the General Building Permit Fees, which apply to all construction work: $25.00 for the first $1,000 of cost of work plus $15.00 for each additional $1,000, per the Building Permits and Inspections Fee Schedule revised 7/2026. The City may reevaluate an understated cost of construction against RSMeans and assess a larger fee. An $82.00 Historic Review fee applies to exterior work in a Historic District; all amounts are municipal charges, as Maine municipalities set their own permit fees and no state fee is added.

Source: published fee schedule · Verified 10/29/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Administrative Fee / Minimum Fee (applies to all electrical permits)
Flat fee $75.00
$75.00
○240V (208), Dedicated Circuits up to 50amps (dryer, range, compressors, condensers, water heaters, unit heaters, etc.) (each)
Flat fee $10.00
$10.00
○Plumbing code fixture fees: Minimum fee (up to four fixtures)
Flat fee $40.00
$40.00
○Plumbing code fixture fees: Each additional fixture
Flat fee $10.00
$10.00
○City surcharge for all plumbing permits
Flat fee $10.00
$10.00
How this jurisdiction calculates the fee

Electrical permit fees are charged as an administrative fee that applies to all electrical permits plus a per-item charge for each circuit and device installed, and a 240V (208) dedicated circuit up to 50 amps serving equipment such as a water heater is charged at a per-circuit rate. The same fee schedule separately sets plumbing permit fees on a fixture basis, with a minimum fee covering up to four fixtures, a charge for each additional fixture, and a city surcharge applied to all plumbing permits.

Source: published fee schedule · Verified 11/10/2026

See the full write-up: Portland building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.