St. Louis, Missouri Building Permit Cost Calculator
Estimates permit cost in St. Louis from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
$0 - $1,000.00 estimated construction cost $25.00 application fee plus $19.00 permit fee, $44.00 total | see rule |
$1,001- $2,000.00 estimated construction cost $25.00 application fee plus $23.00 permit fee, $48.00 total | see rule |
$2,001 - $3,000.00 estimated construction cost $25.00 application fee plus $30.00 permit fee, $55.00 total | see rule |
Over $3,000.00 estimated construction cost or fraction thereof $25.00 application fee plus $10.00 per thousand estimated construction cost or fraction thereof | see rule |
How this jurisdiction calculates the fee
Fees are based on total estimated project cost and are calculated from the tiers published by the Building Division.
Source: published fee schedule · Verified 11/10/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee, due at filing Flat fee $25.00 | $25.00 |
○Total fee, estimated project cost $0-$1,000 Flat fee $44.00 | $44.00 |
○Total fee, estimated project cost $1,001-$2,000 Flat fee $48.00 | $48.00 |
○Total fee, estimated project cost $2,001-$3,000 Flat fee $55.00 | $55.00 |
○Permit fee above $3,000 project cost, per $1,000 or fraction thereof Flat fee $10.00 | $10.00 |
How this jurisdiction calculates the fee
City of St. Louis (independent city - not St. Louis County) Building Division building permit fee, published by the Building Division and applied to all building permits including porches and decks, which require a permit. The fee is driven by total estimated project cost: a $25.00 application fee per application plus a permit fee of $19.00 for cost of $0-$1,000, $23.00 for $1,001-$2,000, $30.00 for $2,001-$3,000, and $10.00 per thousand of estimated construction cost or fraction thereof for anything over $3,000. Totals for the first three brackets are $44.00, $48.00 and $55.00. Only the application fee is payable when the application is filed; the permit fee is due when the permit is ready to issue. All building permit fees are non-refundable. The published schedule carries no effective or adopted date.
Source: published fee schedule · Verified 11/4/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application Fee Flat fee $25.00 | $25.00 |
Residential - Repair or Modify $60.00 for the first unit and $60.00 for each additional unit | see rule |
Residential - Service Only $60.00 for the first unit and $60.00 for each additional unit | see rule |
Residential - Repair or Modify with Service $100.00 for the first unit and $100.00 for each additional unit | see rule |
Residential New Construction, including rehab of 50% or more $120.00 for the first unit and $120.00 for each additional unit | see rule |
○Re-inspection, faulty or incomplete work Flat fee $50.00 | $50.00 |
○Re-inspection for Certification Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
Electrical fees are set by Table 80.12.2 of Ordinance 70802 and combine a flat application fee with an inspection fee that depends on the scope of residential work, charged per housing unit. | 2026-09-25 (lane B run 1754) RE-VERIFIED, NOTHING CHANGED, ONE INTERNAL CONTRADICTION IN THE CITY'S OWN SOURCE RECORDED. Ordinance 70802 is still the operative fee ordinance: the city's Electrical Permits page states "Permit fees are established by City Ordinance 70802" and links it by number. All seven stored figures read verbatim off the city's Electrical Permit Fees table today ($25 application; Residential Repair or Modify $60/$60; Service Only $60/$60; Repair or Modify with Service $100/$100; Residential New Construction including rehab of 50% or more $120/$120; Re-inspection faulty or incomplete work $50; Re-inspection for Certification $125). CONFLICT NOT RESOLVED AND NOT PICKED BETWEEN: the table row "Service Only" prints $60, while explanatory note (m) on the same page says "Where a new electrical service(s) only is installed, the fee shall be $100.00 for the first unit and $100.00 for each additional unit in the same building." Both are on the same official city page. The stored value follows the table. A human must decide which governs.
Source: published fee schedule · Verified 11/11/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee, due at filing Flat fee $25.00 | $25.00 |
○Total fee, estimated project cost $0-$1,000 Flat fee $44.00 | $44.00 |
○Total fee, estimated project cost $1,001-$2,000 Flat fee $48.00 | $48.00 |
○Total fee, estimated project cost $2,001-$3,000 Flat fee $55.00 | $55.00 |
○Permit fee above $3,000 project cost, per $1,000 or fraction thereof Flat fee $10.00 | $10.00 |
How this jurisdiction calculates the fee
City of St. Louis (independent city - not St. Louis County) Building Division building permit fee. A building permit is required for all new fences of any type; the only exemption is replacement of existing fencing of the same height, material and location in a rear or side yard. The fee is driven by total estimated project cost: a $25.00 application fee per application plus a permit fee of $19.00 for cost of $0-$1,000, $23.00 for $1,001-$2,000, $30.00 for $2,001-$3,000, and $10.00 per thousand of estimated construction cost or fraction thereof over $3,000 - totals of $44.00, $48.00 and $55.00 for the first three brackets. Only the application fee is payable at filing; the permit fee is due when the permit is ready to issue. All fees are non-refundable. The published schedule carries no effective or adopted date. The separate Zoning Services fee schedule contains no fence fee.
Source: published fee schedule · Verified 11/2/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee, due at filing Flat fee $25.00 | $25.00 |
○Permit fee above $3,000 project cost, per $1,000 or fraction thereof Flat fee $10.00 | $10.00 |
○Total fee, estimated project cost $0-$1,000 Flat fee $44.00 | $44.00 |
○Total fee, estimated project cost $1,001-$2,000 Flat fee $48.00 | $48.00 |
○Total fee, estimated project cost $2,001-$3,000 Flat fee $55.00 | $55.00 |
How this jurisdiction calculates the fee
City of St. Louis (independent city - not St. Louis County) Building Division building permit fee. A building permit is required for an entire new roof when the work is not replacement with like material and/or when more than 25% of the roof sheathing is removed and replaced; roof replacement with like material affecting 25% or less of the sheathing needs no permit. Where a permit is required the fee follows the general building permit schedule based on total estimated project cost: a $25.00 application fee per application plus a permit fee of $19.00 for cost of $0-$1,000, $23.00 for $1,001-$2,000, $30.00 for $2,001-$3,000, and $10.00 per thousand of estimated construction cost or fraction thereof over $3,000. A typical residential reroof exceeds $3,000, so the per-thousand rate usually governs. All fees are non-refundable and the published schedule carries no effective or adopted date.
Source: published fee schedule · Verified 11/2/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee, due at filing Flat fee $25.00 | $25.00 |
○Total fee, estimated project cost $0-$1,000 Flat fee $44.00 | $44.00 |
○Total fee, estimated project cost $1,001-$2,000 Flat fee $48.00 | $48.00 |
○Total fee, estimated project cost $2,001-$3,000 Flat fee $55.00 | $55.00 |
○Permit fee above $3,000 project cost, per $1,000 or fraction thereof Flat fee $10.00 | $10.00 |
How this jurisdiction calculates the fee
City of St. Louis (independent city - not St. Louis County) Building Division building permit fee. Retaining walls require a building permit; walls 18 inches or less in height are exempt. The fee is driven by total estimated project cost: a $25.00 application fee per application plus a permit fee of $19.00 for cost of $0-$1,000, $23.00 for $1,001-$2,000, $30.00 for $2,001-$3,000, and $10.00 per thousand of estimated construction cost or fraction thereof over $3,000 - totals of $44.00, $48.00 and $55.00 for the first three brackets. Only the application fee is payable at filing; the permit fee is due when the permit is ready to issue. All fees are non-refundable and the published schedule carries no effective or adopted date.
Source: published fee schedule · Verified 11/2/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee, due at filing Flat fee $25.00 | $25.00 |
○Total fee, estimated project cost $0-$1,000 Flat fee $44.00 | $44.00 |
○Total fee, estimated project cost $1,001-$2,000 Flat fee $48.00 | $48.00 |
○Total fee, estimated project cost $2,001-$3,000 Flat fee $55.00 | $55.00 |
○Permit fee above $3,000 project cost, per $1,000 or fraction thereof Flat fee $10.00 | $10.00 |
How this jurisdiction calculates the fee
City of St. Louis (independent city - not St. Louis County) Building Division building permit fee. Accessory buildings over 50 square feet require a building permit; accessory buildings of 50 square feet or less are exempt provided they meet Zoning Ordinance setbacks. The fee is driven by total estimated project cost: a $25.00 application fee per application plus a permit fee of $19.00 for cost of $0-$1,000, $23.00 for $1,001-$2,000, $30.00 for $2,001-$3,000, and $10.00 per thousand of estimated construction cost or fraction thereof over $3,000 - totals of $44.00, $48.00 and $55.00 for the first three brackets. Only the application fee is payable at filing; the permit fee is due when the permit is ready to issue. All fees are non-refundable and the published schedule carries no effective or adopted date.
Source: published fee schedule · Verified 11/2/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application Flat fee $30.00 | $30.00 |
○Fixtures, each (floor drain, sump, water heater, reduced pressure backflow device or double gate/double check valve, roof drain or trapped outlet) Flat fee $10.00 | $10.00 |
○Rough inspection, each Flat fee $25.00 | $25.00 |
○Finish inspection, each Flat fee $25.00 | $25.00 |
○Re-inspection, each Flat fee $30.00 | $30.00 |
○Special inspection, each Flat fee $45.00 | $45.00 |
How this jurisdiction calculates the fee
Plumbing fees are set by Table 107.11.3 of Ordinance 71644 and combine a flat application fee with a per-fixture fee and per-inspection fees.
Source: published fee schedule · Verified 11/10/2026
See the full write-up: St. Louis building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.