Home / Calculators / Building Permit Fee Calculator

Billings, Montana Building Permit Cost Calculator

Estimates permit cost in Billings from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Total valuation $25,001 to $50,000
$229.00 for the first $25,000.00, plus 225 x $5.00 for $225,000.00 over (rounded up per "or fraction thereof") = $1,354.00
$1,354.00
○Total valuation $50,001 to $100,000
$354.00 for the first $50,000.00, plus 200 x $3.50 for $200,000.00 over (rounded up per "or fraction thereof") = $1,054.00
$1,054.00
○Total valuation $100,001 to $500,000
$529.00 for the first $100,000.00, plus 150 x $2.50 for $150,000.00 over (rounded up per "or fraction thereof") = $904.00
$904.00
○Total valuation $500,001 to $1,000,000
$250,000.00 is within the first $500,000.00, so the base $1,529.00 applies
$1,529.00
○Total valuation $1,000,001 to $5,000,000
$250,000.00 is within the first $1,000,000.00, so the base $2,529.00 applies
$2,529.00
○Total valuation $5,000,001 and over
$250,000.00 is within the first $5,000,000.00, so the base $9,529.00 applies
$9,529.00
○Other inspections and fees
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Building permit fees are charged on the higher of the total bid price or the most recent valuation table established in the International Code Council Building Safety Journal, and commercial plan review is assessed at 60% of the permit fee.

Source: published fee schedule · Verified 10/29/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Total valuation $25,001 to $50,000
$229.00 for the first $25,000.00, plus 225 x $5.00 for $225,000.00 over (rounded up per "or fraction thereof") = $1,354.00
$1,354.00
○Total valuation $50,001 to $100,000
$354.00 for the first $50,000.00, plus 200 x $3.50 for $200,000.00 over (rounded up per "or fraction thereof") = $1,054.00
$1,054.00
Commercial plan review fee · add-on
60% of the permit fee — select the permit fee line above to calculate
see rule
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

A deck is permitted as a building permit and priced from the building permit fee table in Resolution 26-11315, charged on the higher of the total bid price or the most recent valuation table published in the International Code Council Building Safety Journal. Billings publishes no separate flat fee for decks. Commercial plan review is assessed at 60 percent of the permit fee; the resolution sets no separate residential plan review charge. The resolution was adopted February 23, 2026 and took effect on passage, repealing Resolution 11-19068. === 2026-10-01 RE-VERIFIED, AND A METHOD TRAP WORTH KEEPING: the cited resolution returns HTTP 200 (3,386,385 bytes, 7 pages) but IS A SCAN WITH NO TEXT LAYER - pdftotext -layout returns 7 characters total, so every stored figure reads as absent and a pass that trusts that output would report this jurisdiction as wholly superseded. A 100% miss rate alongside a zero-length text extraction is a SCANNED-DOCUMENT signal, not a supersession signal. Resolved by rasterising at 300 dpi with pdftoppm and running tesseract per page, which recovered the schedule: Resolution 26-11315, "A RESOLUTION SETTING BUILDING, ELECTRICAL, PLUMBING MECHANICAL AND FIRE SYSTEMS PERMIT FEES". Its recitals state the City Council found it "both fiscally responsible and in the public interest to REDUCE fees for building permits", so this resolution is a fee REDUCTION rather than an uplift - the opposite of the usual direction and a reminder that supersession can cut figures as well as raise them. ALL STORED AMOUNTS RE-CONFIRMED EXACTLY against the OCR: $1-$2,000 = $45.00; $2,001-$25,000 = $45.00 for the first $2,000 plus $8.00 per additional $1,000; $25,001-$50,000 = $229.00 for the first $25,000 plus $5.00; $50,001-$100,000 = $354.00 for the first $50,000 plus $3.50; commercial plan review at 60% of the permit fee; and item 6, OTHER INSPECTIONS AND FEES, $75.00 per hour, covering after-hours inspections (two-hour minimum), re-inspection (one-hour minimum) and inspections for which no fee is specifically indicated (one-hour minimum). SECOND OCR LESSON: at page resolution the first valuation cell OCR'd as the garbage string "#500"; re-cropping that region and re-running tesseract resolved it to 45.00. Do not treat a single implausible OCR'd cell as a changed figure - crop and re-read it. BANDS PRESENT IN THE RESOLUTION BUT NOT STORED ON THIS ROW, for whoever extends it: $100,001-$500,000 = $529.00 plus $2.50; $500,001-$1,000,000 = $1,529.00 plus $2.00; $1,000,001-$5,000,000 = $2,529.00 plus $1.75; $5,000,001 and over = $9,529.00 plus $1.50.

Source: published fee schedule · Verified 10/30/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single Family Dwelling (includes garage wired at same time) - 100 to 300 amp service
Flat fee $130.00
$130.00
○Single Family Dwelling - 301 or more amp service
Flat fee $200.00
$200.00
○Interior Rewire Only or New Addition to Home
Flat fee $40.00
$40.00
○Residential Change of Service
Flat fee $25.00
$25.00
○Private Property Accessory Building (Garages, Barns, Sheds, Etc.) - to 200 amp service
Flat fee $40.00
$40.00
○Private Property Accessory Building - 201 to 300 amp service
Flat fee $100.00
$100.00
○Private Property Accessory Building - 301 or more amp service
Flat fee $130.00
$130.00
○Modular Home - No basement and/or garage
Flat fee $40.00
$40.00
○Modular Home - With basement and/or garage
Flat fee $65.00
$65.00
○Mobile Home located in a court
Flat fee $25.00
$25.00
○Mobile Home located outside of a court
Flat fee $40.00
$40.00
○Livestock Wells, Irrigation Wells
Flat fee $40.00
$40.00
○Irrigation Pump or Machines, per unit (one pump or one pivot)
Flat fee $35.00
$35.00
○Temporary Construction Service (additional fee)
Flat fee $25.00
$25.00
○New service only
Flat fee $40.00
$40.00
○Multi-family Dwellings, per building
Flat fee $100.00
$100.00
○Multi-family Dwellings, plus per unit up to and including 12 units
Flat fee $40.00
$40.00
○Mobile Home Courts and/or Recreational Vehicle Parks, up to 3 spaces
Flat fee $45.00
$45.00
○Mobile Home Courts and/or RV Parks, additional spaces at same time, per space
Flat fee $5.00
$5.00
○Commercial - project cost $0 - $500
Flat fee $30.00
$30.00
Commercial - project cost $501 - $1,000
$30.00 for first $500 plus 6% of balance
see rule
Commercial - project cost $1,001 - $10,000
$60.00 for first $1,000 plus 2% of balance
see rule
Commercial - project cost $10,001 - $50,000
$240.00 for first $10,000 plus 0.5% of balance
see rule
Commercial - project cost $50,001 or more
$440.00 for first $50,000 plus 0.3% of balance
see rule
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Electrical permit fees are flat amounts set by the type of dwelling or structure and the size of the electrical service. The single family dwelling fee covers a garage wired at the same time. Commercial electrical permits are priced instead from project cost. The resolution was adopted February 23, 2026 and took effect on passage, repealing Resolution 11-19068.

Source: published fee schedule · Verified 10/29/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Zoning fence permit, City County Planning Division
Not published. The fence permit application prints only "Call 406-657-8247 for current fee" in place of an amount.
see rule
Fence three to six feet tall
No building permit required (zoning permit from the Planning Department still required)
see rule
○Fence taller than seven feet - building permit, total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Fence taller than seven feet - building permit, total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Billings publishes no fee amount for a fence permit. A fence standing three to six feet tall needs no building permit but does require a zoning permit from the City County Planning Division, and the city and county fence permit application states only that the applicant should call Planning at 406-657-8247 for the current fee, printing no amount. A fence taller than seven feet does require a building permit, priced from the building permit fee table in Resolution 26-11315 on the higher of the total bid price or the International Code Council valuation table. The published guidance leaves fences over six and up to seven feet unaddressed. | 2026-09-30 (lane B run 1822) CITATION GAP REPAIRED, NO FIGURE CHANGED. This row had fee_source_url NULL and cited only billingsmt.gov/325/Fences-Retaining-Walls, which was read in full today and carries the permit thresholds but NOT ONE dollar amount - it states only that fences three to six feet need a zoning permit and no building permit, that fences over seven feet need a building permit designed for a 105 MPH wind load, and gives the Planning Department phone number. Every dollar figure on this row verifies verbatim in Billings Resolution 26-11315 (Setting Building, Electrical, Plumbing, Mechanical and Fire System fees), the same document the other five Billings rows cite: "$1 - $2,000 ... 45.00" and "$2,001 - $25,000 ... 45.00 for the first $2,000 Plus 8.00 for each additional $1,000 or fraction of", and the $75.00-per-hour one-hour-minimum other-inspections line. fee_source_url set to that resolution. METHOD NOTE: the resolution is a 7-page image-only PDF (pdftotext returns 7 bytes); it was rendered at 300 dpi with pdftoppm and read with tesseract, and all 91 figures across the six Billings rows re-read from the OCR.

Source: published fee schedule · Verified 11/13/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Total valuation $25,001 to $50,000
$229.00 for the first $25,000.00, plus 225 x $5.00 for $225,000.00 over (rounded up per "or fraction thereof") = $1,354.00
$1,354.00
Commercial plan review fee · add-on
60% of the permit fee — select the permit fee line above to calculate
see rule
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Reroofing is permitted as a building permit and priced from the building permit fee table in Resolution 26-11315, charged on the higher of the total bid price or the most recent valuation table published in the International Code Council Building Safety Journal. Billings publishes no separate flat reroofing fee. The resolution was adopted February 23, 2026 and took effect on passage, repealing Resolution 11-19068.

Source: published fee schedule · Verified 10/29/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Total valuation $25,001 to $50,000
$229.00 for the first $25,000.00, plus 225 x $5.00 for $225,000.00 over (rounded up per "or fraction thereof") = $1,354.00
$1,354.00
Commercial plan review fee · add-on
60% of the permit fee — select the permit fee line above to calculate
see rule
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

A retaining wall requires a building permit, and Billings publishes no separate flat fee for one: the charge comes from the building permit fee table in Resolution 26-11315, on the higher of the total bid price or the International Code Council valuation table. A wall of any height that holds back a surcharge or a slope, and any wall standing four feet or taller, must be designed by a Montana licensed engineer and the drawings must be wet stamped and wet signed. A site plan goes to the Planning Department for review. The resolution was adopted February 23, 2026 and took effect on passage. === 2026-10-01 RE-VERIFIED, AND A METHOD TRAP WORTH KEEPING: the cited resolution returns HTTP 200 (3,386,385 bytes, 7 pages) but IS A SCAN WITH NO TEXT LAYER - pdftotext -layout returns 7 characters total, so every stored figure reads as absent and a pass that trusts that output would report this jurisdiction as wholly superseded. A 100% miss rate alongside a zero-length text extraction is a SCANNED-DOCUMENT signal, not a supersession signal. Resolved by rasterising at 300 dpi with pdftoppm and running tesseract per page, which recovered the schedule: Resolution 26-11315, "A RESOLUTION SETTING BUILDING, ELECTRICAL, PLUMBING MECHANICAL AND FIRE SYSTEMS PERMIT FEES". Its recitals state the City Council found it "both fiscally responsible and in the public interest to REDUCE fees for building permits", so this resolution is a fee REDUCTION rather than an uplift - the opposite of the usual direction and a reminder that supersession can cut figures as well as raise them. ALL STORED AMOUNTS RE-CONFIRMED EXACTLY against the OCR: $1-$2,000 = $45.00; $2,001-$25,000 = $45.00 for the first $2,000 plus $8.00 per additional $1,000; $25,001-$50,000 = $229.00 for the first $25,000 plus $5.00; $50,001-$100,000 = $354.00 for the first $50,000 plus $3.50; commercial plan review at 60% of the permit fee; and item 6, OTHER INSPECTIONS AND FEES, $75.00 per hour, covering after-hours inspections (two-hour minimum), re-inspection (one-hour minimum) and inspections for which no fee is specifically indicated (one-hour minimum). SECOND OCR LESSON: at page resolution the first valuation cell OCR'd as the garbage string "#500"; re-cropping that region and re-running tesseract resolved it to 45.00. Do not treat a single implausible OCR'd cell as a changed figure - crop and re-read it. BANDS PRESENT IN THE RESOLUTION BUT NOT STORED ON THIS ROW, for whoever extends it: $100,001-$500,000 = $529.00 plus $2.50; $500,001-$1,000,000 = $1,529.00 plus $2.00; $1,000,001-$5,000,000 = $2,529.00 plus $1.75; $5,000,001 and over = $9,529.00 plus $1.50.

Source: published fee schedule · Verified 10/30/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Total valuation $1 - $2,000
Flat fee $45.00
$45.00
○Total valuation $2,001 - $25,000
$45.00 for the first $2,000.00, plus 248 x $8.00 for $248,000.00 over (rounded up per "or fraction thereof") = $2,029.00
$2,029.00
○Total valuation $25,001 to $50,000
$229.00 for the first $25,000.00, plus 225 x $5.00 for $225,000.00 over (rounded up per "or fraction thereof") = $1,354.00
$1,354.00
○Electrical permit, Private Property Accessory Building (Garages, Barns, Sheds, Etc.) to 200 amp service
Flat fee $40.00
$40.00
○Other inspections and fees (re-inspection, minimum charge one hour)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

A detached shed is permitted as a building permit and priced from the building permit fee table in Resolution 26-11315, charged on the higher of the total bid price or the most recent valuation table published in the International Code Council Building Safety Journal. Billings publishes no separate flat fee for sheds or detached accessory buildings. The resolution was adopted February 23, 2026 and took effect on passage, repealing Resolution 11-19068.

Source: published fee schedule · Verified 11/13/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○For the issuance of each permit
Flat fee $20.00
$20.00
○For each water heater and/or vent
Flat fee $7.00
$7.00
○For each gas-piping system of one to five outlets
Flat fee $5.00
$5.00
○For each additional gas piping system outlet, per outlet
Flat fee $1.00
$1.00
○Other inspections and fees
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

A plumbing permit issuance fee applies to each permit, plus a unit fee for each water heater and/or vent.

Source: published fee schedule · Verified 10/29/2026

See the full write-up: Billings building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.