B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Newark, New Jersey Building Permit Cost Calculator

Estimates permit cost in Newark from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New construction and additions, Residential (R)
$0.03 per cubic foot
see rule
New construction and additions, Business (B)
$0.03 per cubic foot
see rule
New construction and additions, Educational (E)
$0.03 per cubic foot
see rule
New construction and additions, High Hazard (H)
$0.03 per cubic foot
see rule
New construction and additions, Mercantile (M)
$0.03 per cubic foot
see rule
New construction and additions, Utility and Miscellaneous (U)
$0.03 per cubic foot
see rule
New construction and additions, Assembly (A)
$0.02 per cubic foot
see rule
New construction and additions, Factory and Industrial (F)
$0.02 per cubic foot
see rule
New construction and additions, Institutional (I)
$0.02 per cubic foot
see rule
New construction and additions, Storage (S)
$0.02 per cubic foot
see rule
State Surcharge on new construction and additions (New Jersey DCA fee, not a Newark fee)
$0.016 per cubic foot
see rule
○Renovation and alteration, estimated construction cost $0 to $50,000
$28.00 x 250 = $7,000.00
$7,000.00
○Renovation and alteration, estimated construction cost $50,001 to $100,000
$21.00 x 250 = $5,250.00
$5,250.00
○Renovation and alteration, estimated construction cost over $100,000
$17.00 x 250 = $4,250.00
$4,250.00
○State DCA surcharge on renovation and alteration (not a Newark fee)
$0.80 x 250 = $200.00
$200.00
○Permit review fee, non-refundable, applied to all permits at application and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
○Certificate of occupancy, residential, 1 to 2 units
Flat fee $230.00
$230.00
○Demolition, structure less than 30 feet high and under 5,000 square feet
Flat fee $144.00
$144.00
○Demolition, all other structures
Flat fee $403.00
$403.00
How this jurisdiction calculates the fee

Newark sets its own construction permit fees by local ordinance within the New Jersey Uniform Construction Code framework. Newark Revised General Ordinances Title VII, Chapter 2, Section 3, Subsection 1 charges the building subcode fee by volume for new construction and additions and by estimated construction cost for renovations and alterations, on top of a non-refundable permit review fee charged on every permit at application and credited against the total permit fee, and subject to a minimum building permit fee. Section 7:2-3 was most recently amended 3-20-2024 by Ord. No. 6PSF-A. The surcharge lines below are New Jersey DCA state fees collected with the permit, not Newark fees.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New construction and additions, Residential (R)
$0.03 per cubic foot
see rule
New construction and additions, Utility and Miscellaneous (U)
$0.03 per cubic foot
see rule
○Renovation and alteration, estimated construction cost $0 to $50,000
$28.00 x 250 = $7,000.00
$7,000.00
○Renovation and alteration, estimated construction cost $50,001 to $100,000
$21.00 x 250 = $5,250.00
$5,250.00
○Renovation and alteration, estimated construction cost over $100,000
$17.00 x 250 = $4,250.00
$4,250.00
○State DCA surcharge on renovation and alteration (not a Newark fee)
$0.80 x 250 = $200.00
$200.00
○Permit review fee, non-refundable, applied to all permits at application and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

Newark publishes no deck-specific fee line. A deck requiring a construction permit is priced under the general building subcode schedule at Newark Revised General Ordinances 7:2-3.1: a new deck is charged as new construction or an addition at the per-cubic-foot rate for the use group, and repair or replacement work that is not ordinary maintenance is charged as renovation and alteration on the estimated construction cost. Every permit also carries the non-refundable permit review fee at application, credited against the total permit fee, and is subject to the minimum building permit fee. Section 7:2-3 was most recently amended 3-20-2024 by Ord. No. 6PSF-A. Surcharge lines are New Jersey DCA state fees, not Newark fees.

Source: published fee schedule · Verified 10/2/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Receptacles and fixtures: first 50
Flat fee $58.00
$58.00
○Receptacles and fixtures: each additional 20
Flat fee $12.00
$12.00
○Motors and electrical devices: 1 - 10hp
Flat fee $58.00
$58.00
○Motors and electrical devices: up to 50hp
Flat fee $115.00
$115.00
○Motors and electrical devices: up to 100hp
Flat fee $575.00
$575.00
○Motors and electrical devices: larger than above
Flat fee $863.00
$863.00
○Transformers and generators: up to 10kw
Flat fee $58.00
$58.00
○Transformers and generators: up to 45kw
Flat fee $115.00
$115.00
○Transformers and generators: up to 112.5kw
Flat fee $575.00
$575.00
○Transformers and generators: larger than above
Flat fee $863.00
$863.00
○Service panels, entrances and sub panels: up to 200amps
Flat fee $81.00
$81.00
○Service panels, entrances and sub panels: up to 1000amps
Flat fee $460.00
$460.00
○Service panels, entrances and sub panels: larger than above
Flat fee $1,150.00
$1,150.00
○Minimum fee
Flat fee $58.00
$58.00
○Annual construction permit: annual fee
Flat fee $173.00
$173.00
○Annual construction permit: State Training Registration Fee
Flat fee $161.00
$161.00
○Permit review fee, applied to all permits and credited against the total permit fee
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

Newark Revised General Ordinances Title VII, Chapter 2, Section 3, Subsection 2 charges the electrical subcode fee by the count and rating of the devices installed, with a minimum fee for the permit and an annual permit option for work on premises occupied by a firm or corporation.

Source: published fee schedule · Verified 9/24/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence 6 feet or less in height, other than a swimming pool barrier (no construction permit required)
Flat fee $0.00
$0.00
New construction and additions, Utility and Miscellaneous (U)
$0.03 per cubic foot
see rule
○Renovation and alteration, estimated construction cost $0 to $50,000
$28.00 x 250 = $7,000.00
$7,000.00
○Renovation and alteration, estimated construction cost $50,001 to $100,000
$21.00 x 250 = $5,250.00
$5,250.00
○Renovation and alteration, estimated construction cost over $100,000
$17.00 x 250 = $4,250.00
$4,250.00
○Permit review fee, non-refundable, applied to all permits at application and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

No construction permit and therefore no permit fee for a fence 6 feet or less in height, except barriers surrounding public or private swimming pools. Where a fence does require a permit, Newark publishes no fence-specific fee line, so the work is priced under the general building subcode schedule at Newark Revised General Ordinances 7:2-3.1, as new construction at the per-cubic-foot rate for the use group or as renovation and alteration on the estimated construction cost, plus the non-refundable permit review fee charged on every permit at application and credited against the total permit fee, subject to the minimum building permit fee. Section 7:2-3 was most recently amended 3-20-2024 by Ord. No. 6PSF-A. Surcharge lines are New Jersey DCA state fees, not Newark fees.

Source: published fee schedule · Verified 9/15/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Siding and roofing permits: R-3; R-4 & R-5
Flat fee $58.00
$58.00
○Permit review fee, applied to all permits and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

Newark Revised General Ordinances Title VII, Chapter 2, Section 3, Subsection 1 sets a flat siding and roofing permit fee for use groups R-3, R-4 and R-5, on top of the non-refundable permit review fee that applies to every permit at application and is credited against the total permit fee.

Source: published fee schedule · Verified 9/24/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New construction and additions, Utility and Miscellaneous (U)
$0.03 per cubic foot
see rule
New construction and additions, Residential (R)
$0.03 per cubic foot
see rule
State Surcharge on new construction and additions (New Jersey DCA fee, not a Newark fee)
$0.016 per cubic foot
see rule
○Renovation and alteration, estimated construction cost $0 to $50,000
$28.00 x 250 = $7,000.00
$7,000.00
○Renovation and alteration, estimated construction cost $50,001 to $100,000
$21.00 x 250 = $5,250.00
$5,250.00
○Renovation and alteration, estimated construction cost over $100,000
$17.00 x 250 = $4,250.00
$4,250.00
○Permit review fee, non-refundable, applied to all permits at application and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

Newark publishes no retaining-wall-specific fee line. A retaining wall requiring a construction permit is priced under the general building subcode schedule at Newark Revised General Ordinances 7:2-3.1, as new construction at the per-cubic-foot rate for the use group or as renovation and alteration on the estimated construction cost, plus the non-refundable permit review fee charged on every permit at application and credited against the total permit fee, subject to the minimum building permit fee. Section 7:2-3 was most recently amended 3-20-2024 by Ord. No. 6PSF-A. Surcharge lines are New Jersey DCA state fees, not Newark fees.

Source: published fee schedule · Verified 10/2/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Garden-type utility shed 200 square feet or less, 10 feet or less in height, accessory to R-2 to R-5, no utility connections (no building construction permit required)
Flat fee $0.00
$0.00
○Electrical subcode minimum fee, where electrical work is involved
Flat fee $58.00
$58.00
New construction and additions, Utility and Miscellaneous (U)
$0.03 per cubic foot
see rule
New construction and additions, Storage (S)
$0.02 per cubic foot
see rule
State Surcharge on new construction and additions (New Jersey DCA fee, not a Newark fee)
$0.016 per cubic foot
see rule
○Permit review fee, non-refundable, applied to all permits at application and credited against the total permit fee
Flat fee $58.00
$58.00
○Minimum building permit
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

No construction permit and therefore no building permit fee for a garden-type utility shed of 200 square feet or less and 10 feet or less in height that is accessory to an R-2, R-3, R-4 or R-5 building and has no water, gas, oil or sewer connection; a construction permit for electrical work is still required where electrical work is involved, and carries the electrical subcode minimum fee. A shed outside those limits is priced under the general building subcode schedule at Newark Revised General Ordinances 7:2-3.1, which publishes no shed-specific line, as new construction at the per-cubic-foot rate for the use group, plus the non-refundable permit review fee charged on every permit at application and credited against the total permit fee, subject to the minimum building permit fee. Section 7:2-3 was most recently amended 3-20-2024 by Ord. No. 6PSF-A. Surcharge lines are New Jersey DCA state fees, not Newark fees.

Source: published fee schedule · Verified 10/2/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Each fixture, piece of equipment or appliance connected to the plumbing system, and each appliance connected to the gas piping or oil piping system
Flat fee $14.00
$14.00
○Each special device: grease traps, oil separators, refrigeration units, utility service connections, backflow preventers equipped with test ports, steam boilers, hot water boilers excluding those for domestic water heating, active solar systems, sewer pumps and interceptors
Flat fee $75.00
$75.00
○Minimum plumbing subcode fee
Flat fee $58.00
$58.00
○Permit review fee, applied to all permits and credited against the total permit fee
Flat fee $58.00
$58.00
How this jurisdiction calculates the fee

Newark Revised General Ordinances Title VII, Chapter 2, Section 3, Subsection 4 charges the plumbing subcode fee for each fixture, piece of equipment or appliance connected to the plumbing system and for each appliance connected to the gas or oil piping system, with a higher flat rate for listed special devices and a minimum fee for the permit.

Source: published fee schedule · Verified 9/24/2026

See the full write-up: Newark building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.