Albuquerque, New Mexico Building Permit Cost Calculator
Estimates permit cost in Albuquerque from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
Total valuation $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. | see rule |
Total valuation $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. | see rule |
Total valuation $25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | see rule |
Total valuation $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. | see rule |
○Total valuation $100,001.00 and up $993.75 for the first $100,000.00, plus 150 x $5.60 for $150,000.00 over (rounded up per "or fraction thereof") = $1,833.75 | $1,833.75 |
○Re-inspection fee Flat fee $47.00 | $47.00 |
○Demolition permit, wrecking and demolition up to and including 1,500 sq. ft. of floor area including all floors and basements Flat fee $47.00 | $47.00 |
○Certificate of Occupancy Flat fee $50.00 | $50.00 |
○Temporary Certificate of Occupancy Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
The building permit fee is based on the total valuation of the work under Table 112-A of the Uniform Administrative Code, with the Albuquerque regional modifier applied (.50 for one- and two-family dwelling and townhouse construction, .67 for apartments, public and commercial construction) and a minimum fee of $23.50.
Source: published fee schedule · Verified 11/16/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
Total valuation $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. | see rule |
Total valuation $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. | see rule |
How this jurisdiction calculates the fee
A deck is permitted as building work, and the fee is based on the total valuation under Table 112-A of the Uniform Administrative Code with the Albuquerque regional modifier of .50 for one- and two-family dwelling and townhouse construction and a minimum fee of $23.50.
Source: published fee schedule · Verified 11/13/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative charge applicable to all applications and additions to permits Flat fee $47.00 | $47.00 |
○Meter loop Flat fee $40.00 | $40.00 |
○Outlets (communication and signal, fixtures, switches and receptacles), first 20 Flat fee $1.50 | $1.50 |
○Outlets (communication and signal, fixtures, switches and receptacles), all over 20 Flat fee $0.90 | $0.90 |
○Panels Flat fee $8.00 | $8.00 |
○Residential fixed appliances (30 amps or over) Flat fee $8.00 | $8.00 |
○Evaporative coolers (any size) Flat fee $8.00 | $8.00 |
○Transformers Flat fee $8.00 | $8.00 |
○Pre-final Flat fee $40.00 | $40.00 |
○Swimming pool (private) Flat fee $60.00 | $60.00 |
○Re-inspection fee Flat fee $47.00 | $47.00 |
How this jurisdiction calculates the fee
Electrical permit fees are set by Table 112-B of the Uniform Administrative Code as an administrative charge plus itemized charges for the equipment installed. The Albuquerque regional modifier for Table 112-B is 1.0, and electrical plan review is 25 percent of the total permit fee.
Source: published fee schedule · Verified 11/16/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Table 112-F construction cost guide, Cmu garden wall, 6 foot height, per lineal foot Flat fee $41.70 | $41.70 |
○Table 112-F construction cost guide, Cmu garden wall, 8 foot height, per lineal foot Flat fee $55.40 | $55.40 |
○Table 112-F construction cost guide, adobe garden wall, 6 foot height, per lineal foot Flat fee $71.40 | $71.40 |
○Table 112-F construction cost guide, wood stud/stucco wall, 6 foot height, per lineal foot Flat fee $69.30 | $69.30 |
○Table 112-F construction cost guide, wood fence (cedar), 6 foot height, per lineal foot Flat fee $23.30 | $23.30 |
○Table 112-F construction cost guide, wood fence (cedar), 8 foot height, per lineal foot Flat fee $31.00 | $31.00 |
○Table 112-F construction cost guide, chain link fence, 6 foot height, per lineal foot Flat fee $12.00 | $12.00 |
○Table 112-F construction cost guide, chain link fence, 8 foot height, per lineal foot Flat fee $16.00 | $16.00 |
Table 112-F footnote, reinforcement greater than code minimum Add 15% to the construction cost | see rule |
○Table 112-A, total valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
Table 112-A, total valuation $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Table 112-A, total valuation $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Plan review fee for buildings, signs or structures 65 percent of the building permit fee | see rule |
○Re-inspection fee Flat fee $47.00 | $47.00 |
How this jurisdiction calculates the fee
2024 City of Albuquerque Uniform Administrative Code. An exterior fence or freestanding masonry wall over six feet high above grade on the lowest side requires a building permit. Section 112.2 assigns wall and fence permits to Table 112-F, which the code prints as a Fence And Wall Construction Cost Guide per lineal foot by wall height, so the figures in it are construction costs that establish the valuation of the work; the Table 112-A building permit fee schedule is then applied to that valuation. The Albuquerque regional modifier for Table 112-F is 1.0 and the minimum permit fee is $23.50. Plan review for building work is 65 percent of the permit fee and is a separate charge from the permit fee.
Source: published fee schedule · Verified 11/6/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential (R-3 occupancies only), administrative fee Flat fee $30.00 | $30.00 |
○Residential (R-3 occupancies only), inspection fee Flat fee $40.00 | $40.00 |
○Residential (R-3 occupancies only), total Flat fee $70.00 | $70.00 |
○Commercial, valuation $501 - $5,000, total Flat fee $100.00 | $100.00 |
○Commercial, valuation $5,001 - $10,000, total Flat fee $120.00 | $120.00 |
○Commercial, valuation $10,001 - $20,000, total Flat fee $160.00 | $160.00 |
○Commercial, valuation $20,001 - $30,000, total Flat fee $240.00 | $240.00 |
○Commercial, valuation $30,001 - $40,000, total Flat fee $320.00 | $320.00 |
○Commercial, valuation $40,001 - $50,000, total Flat fee $400.00 | $400.00 |
○Commercial, valuation over $50,000, total Flat fee $480.00 | $480.00 |
How this jurisdiction calculates the fee
Re-roof permit fees are set by Table 112-G of the Uniform Administrative Code as a flat administrative fee plus an inspection fee, with residential rates for R-3 occupancies and valuation-based rates for all other occupancies. The Albuquerque regional modifier for Table 112-G is 1.0. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM, SUCCESSOR HUNT NEGATIVE. All ten stored figures read off Table 112-G Re-Roof Permit Fees in the cited 2024 Edition Uniform Administrative Code, which states an effective date of January 1, 2025, and the regional modifier line "The Albuquerque regional modifier for Table 112-G Re-Roof Permit Fees shall be (1.0)" is present. No 2025 or 2026 edition exists: guessed 2025-uac-adopted.pdf and 2026-uac-adopted.pdf both 404 cleanly and the 2024 edition is the newest the City publishes.
Source: published fee schedule · Verified 11/10/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
Total valuation $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. | see rule |
○Construction cost guide, Cmu retaining wall 6 inch, 4 foot height, per lineal foot Flat fee $30.50 | $30.50 |
○Construction cost guide, Cmu retaining wall 8 inch, 4 foot height, per lineal foot Flat fee $33.70 | $33.70 |
○Construction cost guide, concrete retaining wall, 4 foot height, per lineal foot Flat fee $59.40 | $59.40 |
○Construction cost guide, Cmu garden wall, 6 foot height, per lineal foot Flat fee $41.70 | $41.70 |
○Construction cost guide, wood fence (cedar), 6 foot height, per lineal foot Flat fee $23.30 | $23.30 |
○Construction cost guide, chain link fence, 6 foot height, per lineal foot Flat fee $12.00 | $12.00 |
How this jurisdiction calculates the fee
A retaining wall is permitted as building work, and the fee is based on the total valuation under Table 112-A of the Uniform Administrative Code with the Albuquerque regional modifier applied and a minimum fee of $23.50. Table 112-F provides a fence and wall construction cost guide per lineal foot, and the regional modifier for Table 112-F is 1.0.
Source: published fee schedule · Verified 11/13/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Table 112-A, total valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
Table 112-A, total valuation $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00 | see rule |
Table 112-A, total valuation $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 | see rule |
Table 112-A, total valuation $25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 | see rule |
Regional modifier, one- and two-family dwelling and town-house construction .50 (minimum fee $23.50) | see rule |
Plan review fee for buildings, signs or structures 65 percent of the building permit fee | see rule |
○Re-inspection fee Flat fee $47.00 | $47.00 |
○Inspections for which no fee is specifically indicated (minimum charge two hours) Flat fee $47.00 | $47.00 |
○Separate electrical permit where the shed is wired, administrative charge (Table 112-B) Flat fee $47.00 | $47.00 |
How this jurisdiction calculates the fee
2024 City of Albuquerque Uniform Administrative Code, Section 112 and Table 112-A. A building permit is required for a detached one-story accessory building used as a tool or storage shed once the building area exceeds 120 square feet. Albuquerque publishes no shed-specific line item, so the fee is the general building permit fee taken from the total valuation of the work under Table 112-A, with the Albuquerque regional modifier applied and a minimum fee of $23.50. The modifier is .50 for one- and two-family dwelling and town-house construction including renovations, alterations and additions, and .67 for apartments, public and commercial construction. Plan review is 65 percent of the permit fee and is charged separately.
Source: published fee schedule · Verified 11/6/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Table 112-D item 1, administrative charge applicable to all applications and additions to permit Flat fee $47.00 | $47.00 |
○Table 112-D item 27, for each fixture or piece of equipment required by this Code but not classed in other fixture categories, or for which no other fee is listed in this Code Flat fee $10.00 | $10.00 |
○Table 112-D item 6, plumbing fixture includes drain and vent Flat fee $10.00 | $10.00 |
○Table 112-D item 7, water distribution system (also pool filling system, including back-flow prevention) Flat fee $14.00 | $14.00 |
○Table 112-D item 5, gas outlet Flat fee $6.00 | $6.00 |
○Table 112-D item 2, gas line test with no outlets or appliances Flat fee $10.00 | $10.00 |
○Table 112-C item 19, for each appliance or piece of equipment required by this Code but not classed in other appliance categories, or for which no other fee is listed in this Code Flat fee $14.00 | $14.00 |
Plumbing plan review 25 percent of the total permit fee as set forth in Table 112-D | see rule |
○Table 112-D re-inspection fee assessed under Section 113.5.8 Flat fee $47.00 | $47.00 |
○Table 112-D installation for which no fee is prescribed (minimum charge two hours) Flat fee $47.00 | $47.00 |
How this jurisdiction calculates the fee
2024 City of Albuquerque Uniform Administrative Code, Table 112-D Plumbing Permit Fees. Albuquerque prices plumbing work as a flat administrative charge that applies to every application, plus itemised charges for the equipment installed. The regional modifier for Table 112-D is 1.0 and plumbing plan review is 25 percent of the total permit fee. The tables carry no water-heater-specific line item, so a water heater falls to the residual item for a fixture or piece of equipment not classed in another category; where gas piping, venting or a gas appliance connection is part of the work, the gas outlet and appliance charges in Tables 112-D and 112-C apply in addition.
Source: published fee schedule · Verified 11/6/2026
See the full write-up: Albuquerque building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.