Providence, Rhode Island Building Permit Cost Calculator
Estimates permit cost in Providence from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Cost of construction $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
○Cost of construction $10,000.01 to $50,000 $230.00 base plus $21.00 x 250 = $5,480.00 | $5,480.00 |
○Cost of construction $50,000.01 and above $1,070.00 base plus $19.00 x 250 = $5,820.00 | $5,820.00 |
○Minimum permit fee, per state regulation 510-RICR-00-00-21 Flat fee $125.00 | $125.00 |
○Minimum permit fee applied by the city's own FY19 calculator (conflicting) Flat fee $50.00 | $50.00 |
Plan review (Providence Code 5-7(c)), capped at $10,000 one third of the permit fee | see rule |
Certificate of occupancy (Providence Code 5-7(h)) $115.00 new buildings or other new structures / $175.00 existing buildings or other existing structures | see rule |
How this jurisdiction calculates the fee
Providence building permit fees are set by state regulation rather than by the city: 510-RICR-00-00-21 section 21.12(A)(28) fixes the tiered rate under the authority of RIGL 23-27.3-119.0, which requires every Rhode Island municipality to use the Building Code Commission formula. CONFLICT: the state regulation has stated a $125.00 minimum in every version since its 2018 adoption, while the city's own permit FAQ and the FY19 fee calculator still linked from the Inspections and Standards site both apply a $50.00 floor. The state regulation controls, but a counter transaction may still be quoted at $50.00; confirm with the department before relying on either figure. Providence Code section 5-7(a) additionally still prints a pre-2018 municipal table that the state formula displaced.
Source: published fee schedule · Verified 11/13/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Project valuation $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
Project valuation $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
Project valuation $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
Providence does not set its own permit rates. R.I. Gen. Laws Section 23-27.3-119.0 requires every Rhode Island municipality to compute permit fees on the schedule the Rhode Island Building Code Commission establishes by regulation, and the Providence schedule is 510-RICR-00-00-21 Section 21.12(A)(28), a tiered rate keyed to the labor-and-materials cost of construction; a deck permit carries no separate flat fee and is priced from that cost. R.I. Gen. Laws Section 23-27.3-108.2(c)(1) additionally requires the city to collect a state levy of 0.1 percent of total construction cost on every permit, capped at $50.00 per permit for one- and two-family dwellings, and Providence Code of Ordinances Section 5-7(c) adds a plan review fee of one third of the permit fee for construction valued at $50,000 or more, capped at $10,000. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/2/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Cost of electrical work $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
Cost of electrical work $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
Cost of electrical work $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
Electrical permits are priced on the same construction-cost schedule as building permits, not on a per-fixture or per-device basis. Providence Code of Ordinances Section 5-7(a) applies its schedule of permit fees to all permits issued for construction, alteration, maintenance and repair, expressly including the installation of electrical work under the purview of the state building code, and R.I. Gen. Laws Sections 23-27.3-118.1 and 23-27.3-119.0 place electrical permit fees inside the statewide permit formula. The rates themselves are state-mandated rather than municipal: the Rhode Island Building Code Commission sets the Providence schedule at 510-RICR-00-00-21 Section 21.12(A)(28), and the fee is computed from the labor-and-materials cost of the electrical work, plus the state levy of 0.1 percent of total construction cost required by R.I. Gen. Laws Section 23-27.3-108.2(c)(1), capped at $50.00 per permit for one- and two-family dwellings. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/16/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fence within the exempt height: no building permit and no permit fee Flat fee $0.00 | $0.00 |
○If a permit is required, project valuation $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
If a permit is required, project valuation $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
If a permit is required, project valuation $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
No building permit is required for a fence within the exempt height the Department of Inspection and Standards lists, so no permit fee is charged for that work. Where a fence is part of work that does require a permit, the rate is state-mandated rather than municipal: R.I. Gen. Laws Section 23-27.3-119.0 requires every Rhode Island municipality to compute permit fees on the schedule the Rhode Island Building Code Commission establishes by regulation, and the Providence schedule is 510-RICR-00-00-21 Section 21.12(A)(28), keyed to the labor-and-materials cost of construction, with the state levy of 0.1 percent of total construction cost required by R.I. Gen. Laws Section 23-27.3-108.2(c)(1) on top. Providence Code of Ordinances Section 5-53 separately allows the city fence viewer $6.00 per day for viewing a fence on complaint; that is a neighbor-dispute fee payable by the complainant, not a permit fee. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/16/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Project valuation $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
Project valuation $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
Project valuation $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
Providence does not set its own permit rates. R.I. Gen. Laws Section 23-27.3-119.0 requires every Rhode Island municipality to compute permit fees on the schedule the Rhode Island Building Code Commission establishes by regulation, and the Providence schedule is 510-RICR-00-00-21 Section 21.12(A)(28), a tiered rate keyed to the labor-and-materials cost of construction; reroofing carries no separate flat fee and is priced from the cost of the roofing work. R.I. Gen. Laws Section 23-27.3-108.2(c)(1) additionally requires the city to collect a state levy of 0.1 percent of total construction cost on every permit, capped at $50.00 per permit for one- and two-family dwellings, and Providence Code of Ordinances Section 5-7(c) adds a plan review fee of one third of the permit fee for construction valued at $50,000 or more, capped at $10,000. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/2/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Project valuation $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
Project valuation $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
Project valuation $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
How this jurisdiction calculates the fee
Providence does not set its own permit rates. R.I. Gen. Laws Section 23-27.3-119.0 requires every Rhode Island municipality to compute permit fees on the schedule the Rhode Island Building Code Commission establishes by regulation, and the Providence schedule is 510-RICR-00-00-21 Section 21.12(A)(28), a tiered rate keyed to the labor-and-materials cost of construction; a retaining wall above the exempt height carries no separate flat fee and is priced from that cost. R.I. Gen. Laws Section 23-27.3-108.2(c)(1) additionally requires the city to collect a state levy of 0.1 percent of total construction cost on every permit, capped at $50.00 per permit for one- and two-family dwellings, and Providence Code of Ordinances Section 5-7(c) adds a plan review fee of one third of the permit fee for construction valued at $50,000 or more, capped at $10,000. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/16/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Project valuation $1 to $10,000 $23.00 x 250 = $5,750.00 | $5,750.00 |
Project valuation $10,001 to $50,000 $230 + $21.00 per $1,000 exceeding $10,000 | see rule |
Project valuation $50,001 and up $1,070 + $19.00 per $1,000 exceeding $50,000 | see rule |
○Minimum fee (state regulation 510-RICR-00-00-21 Section 21.12(A)(28)) Flat fee $125.00 | $125.00 |
○Raze garage or shed permit, demolition of a building two stories or less (Providence Code Section 5-7(f)) Flat fee $85.00 | $85.00 |
How this jurisdiction calculates the fee
Providence does not set its own permit rates. R.I. Gen. Laws Section 23-27.3-119.0 requires every Rhode Island municipality to compute permit fees on the schedule the Rhode Island Building Code Commission establishes by regulation, and the Providence schedule is 510-RICR-00-00-21 Section 21.12(A)(28), a tiered rate keyed to the labor-and-materials cost of construction; a shed over the exempt floor area carries no separate flat fee and is priced from that cost. R.I. Gen. Laws Section 23-27.3-108.2(c)(1) additionally requires the city to collect a state levy of 0.1 percent of total construction cost on every permit, capped at $50.00 per permit for one- and two-family dwellings, and Providence Code of Ordinances Section 5-7(c) adds a plan review fee of one third of the permit fee for construction valued at $50,000 or more, capped at $10,000. The city materials conflict with the state regulation on the floor: the state schedule states a $125.00 minimum fee for Providence, while the permit fee calculator the Department of Inspection and Standards currently posts, and its permit FAQ, both apply a $50.00 minimum.
Source: published fee schedule · Verified 11/13/2026
See the full write-up: Providence building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.