Charleston, South Carolina Building Permit Cost Calculator
Estimates permit cost in Charleston from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit application fee (non-refundable, all building and trade permits) Flat fee $40.00 | $40.00 |
Plan review fee (valuation over $1,000) Equal to 50% of building permit fee | see rule |
Construction valuation $1000 or less Application Fee Only | see rule |
Construction valuation $1,001 to $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof | see rule |
Construction valuation $50,001 to $100,000 $260.00 for the first $50,000 plus $4.00 for each additional thousand or fraction thereof | see rule |
Construction valuation $100,001 to $500,000 $460.00 for the first $100,000 plus $3.00 for each additional thousand or fraction thereof | see rule |
Construction valuation $500,001 and up $1660.00 for the first $500,000 plus $2.00 for each additional thousand or fraction thereof | see rule |
New residential valuation - Building Structures, Finished Areas $116.15/ft2 | see rule |
New residential valuation - Building Structures, Unfinished Areas $45.92/ft2 | see rule |
New residential valuation - Accessory Structures, Heated $116.15/ft2 | see rule |
New residential valuation - Accessory Structures, Unheated $45.92/ft2 | see rule |
New residential valuation - Porches, decks, Patios $45.92/ft2 | see rule |
○Re-inspection fee Flat fee $100.00 | $100.00 |
○Plan revision review, residential, per trade discipline Flat fee $50.00 | $50.00 |
○Plan revision review, commercial, per trade discipline Flat fee $100.00 | $100.00 |
New construction of a single family detached residence used only as certified Affordable Housing 100% waiver of building permit fees | see rule |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Every building and trade permit carries a non-refundable application fee, and the building permit fee itself comes from a construction cost table. For a new residential building the valuation is not declared by the applicant: it is computed from a published cost per square foot for each type of construction area, summed, and then run through the permit fee table. Where valuation exceeds 1,000 dollars and plans must be reviewed, a plan review fee equal to half the building permit fee is added, covering the initial review and one follow-up. Fees are doubled where work starts before the permit is obtained. Building permit fees are waived in full for new construction of single family detached residences used only as Affordable Housing as that term is defined in the zoning ordinance and so certified by the city. The city obtains permits for its own projects but pays no fees other than re-inspection and plan revision review. The schedule took effect October 1, 2019.
Source: published fee schedule · Verified 10/30/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
New residential valuation - Porches, decks, Patios $45.92/ft2 | see rule |
Construction cost $1000 or less Application Fee Only | see rule |
Construction cost $1,001 to $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof | see rule |
Construction cost $50,001 to $100,000 $260.00 for the first $50,000 plus $4.00 for each additional thousand or fraction thereof | see rule |
Plan review fee (valuation over $1,000) Equal to 50% of building permit fee | see rule |
○Plan revision review, residential, per trade discipline Flat fee $50.00 | $50.00 |
○Re-inspection fee Flat fee $100.00 | $100.00 |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Charleston publishes no flat deck fee. A deck built as part of a new residential building is valued at a published cost per square foot for porches, decks and patios and folded into the new construction valuation. A deck added to an existing dwelling is treated as a residential alteration and priced from the construction cost table on the total contract price, which includes all labor and materials at current retail value plus overhead and profit. Where that cost is 1,000 dollars or less only the application fee is charged. A plan review fee equal to half the building permit fee applies once valuation exceeds 1,000 dollars. The schedule took effect October 1, 2019.
Source: published fee schedule · Verified 10/30/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Application fee Flat fee $40.00 | $40.00 |
○New, Replacement or Upgrade Service $0.25 x 200 = $50.00 | $50.00 |
○Electrical Safety Flat fee $30.00 | $30.00 |
○Temporary Power Pole Flat fee $40.00 | $40.00 |
○Residential plan revision review, per trade discipline Flat fee $50.00 | $50.00 |
○Re-inspection Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
Electrical permit fees are charged by the ampere for service work, with flat fees for electrical safety and temporary power pole permits, plus a separate permit application fee.
Source: published fee schedule · Verified 10/30/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
Construction cost $1000 or less (the usual case for a residential fence) Application Fee Only | see rule |
Construction cost $1,001 to $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof | see rule |
Plan review fee (valuation over $1,000) Equal to 50% of building permit fee | see rule |
Encroachment sub permit (fence extending into a drainage easement) Required; no amount published in the Building and Trade Permit Fee Schedule | see rule |
○Re-inspection fee Flat fee $100.00 | $100.00 |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Charleston lists no fence line item and charges no flat fence fee. A residential non-masonry fence does need a permit, and the charge follows the general Building and Trade Permit Fee Schedule, which collects only the non-refundable application fee where construction cost is 1,000 dollars or less and otherwise applies the construction cost table. Zoning review is required. Building Inspections review applies only to fences standing taller than seven feet above grade, and a field inspection is required only for engineered fence designs. A fence pushing into a drainage easement needs an encroachment sub permit, and a fence serving as a swimming pool or spa barrier follows the swimming pool guidance instead. The schedule took effect October 1, 2019; the fence permitting guidance is dated February 2026. | 2026-09-30 (lane B run 1822) AGE WATCH, NOTHING CHANGED. The cited Building & Trade Permit Fee Schedule (charleston-sc.gov/DocumentCenter/View/17002) returns HTTP 200 and every stored figure on this row re-reads verbatim in it, but the document is headed ORDINANCE NOS. 2017-131, 2019-064 & 2019-072, EFFECTIVE OCTOBER 1, 2019 - seven years old. A successor hunt this pass came up empty: the Permits and Building Inspections index pages were rendered and link no newer fee schedule, and the city still serves this one. Because the schedule carries an OCTOBER 1 effective date, Charleston belongs on the October-1 re-check list with Arlington, Austin, Long Beach, Fort Worth, Corpus Christi, Tallahassee, Irving and Lubbock. SCOPE NOTE: this is charleston in SOUTH CAROLINA; the slug also exists in WEST VIRGINIA and every statement here was scoped by (state, slug, permit_type).
Source: published fee schedule · Verified 11/13/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
Construction cost $1000 or less Application Fee Only | see rule |
Construction cost $1,001 to $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof | see rule |
Construction cost $50,001 to $100,000 $260.00 for the first $50,000 plus $4.00 for each additional thousand or fraction thereof | see rule |
Plan review fee (valuation over $1,000) Equal to 50% of building permit fee | see rule |
○Plan revision review, residential, per trade discipline Flat fee $50.00 | $50.00 |
○Re-inspection fee Flat fee $100.00 | $100.00 |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Reroofing is permitted as a residential alteration or repair and Charleston publishes no flat reroofing fee. The permit fee comes from the construction cost table applied to the total contract price, with only the non-refundable application fee collected where that cost is 1,000 dollars or less, plus a plan review fee equal to half the permit fee once valuation exceeds 1,000 dollars. The city roofing guidance sheet, dated August 2022, carries an error: it describes the building permit fee as based on the cost of construction of a pool or spa rather than of the roof. The schedule took effect October 1, 2019.
Source: published fee schedule · Verified 10/30/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
New residential valuation - Accessory Structures, Heated $116.15/ft2 | see rule |
New residential valuation - Accessory Structures, Unheated $45.92/ft2 | see rule |
Construction cost $1000 or less Application Fee Only | see rule |
Construction cost $1,001 to $50,000 $15.00 for the first $1,000 plus $5.00 for each additional thousand or fraction thereof | see rule |
Construction cost $50,001 to $100,000 $260.00 for the first $50,000 plus $4.00 for each additional thousand or fraction thereof | see rule |
Plan review fee (valuation over $1,000) Equal to 50% of building permit fee | see rule |
○Re-inspection fee Flat fee $100.00 | $100.00 |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Charleston publishes no flat fee for a shed or other accessory structure. An accessory structure built with a new residence is valued at a published cost per square foot, one rate for heated space and a lower rate for unheated space, and folded into the new construction valuation. An accessory structure added to an existing property is priced from the construction cost table on the total contract price, with only the non-refundable application fee collected where that cost is 1,000 dollars or less. A plan review fee equal to half the building permit fee applies once valuation exceeds 1,000 dollars. Separate trade sub permits are required where electrical, gas, mechanical or plumbing work is in scope. The schedule took effect October 1, 2019. | 2026-09-30 (lane B run 1822) AGE WATCH, NOTHING CHANGED. The cited Building & Trade Permit Fee Schedule (charleston-sc.gov/DocumentCenter/View/17002) returns HTTP 200 and every stored figure on this row re-reads verbatim in it, but the document is headed ORDINANCE NOS. 2017-131, 2019-064 & 2019-072, EFFECTIVE OCTOBER 1, 2019 - seven years old. A successor hunt this pass came up empty: the Permits and Building Inspections index pages were rendered and link no newer fee schedule, and the city still serves this one. Because the schedule carries an OCTOBER 1 effective date, Charleston belongs on the October-1 re-check list with Arlington, Austin, Long Beach, Fort Worth, Corpus Christi, Tallahassee, Irving and Lubbock. SCOPE NOTE: this is charleston in SOUTH CAROLINA; the slug also exists in WEST VIRGINIA and every statement here was scoped by (state, slug, permit_type).
Source: published fee schedule · Verified 11/13/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plumbing permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
○Each Plumbing Fixture Flat fee $3.50 | $3.50 |
○Building Water Supply - New, Replacement or Repair Flat fee $10.00 | $10.00 |
○Building Sewer - New, Replacement or Repair Flat fee $10.00 | $10.00 |
○Fuel gas permit application fee (non-refundable) Flat fee $40.00 | $40.00 |
○Fuel Gas - One to Four Outlets Flat fee $10.00 | $10.00 |
○Fuel Gas - Each Additional Outlet Flat fee $2.00 | $2.00 |
○Plan revision review, residential, per trade discipline Flat fee $50.00 | $50.00 |
○Re-inspection fee Flat fee $100.00 | $100.00 |
Work started before the permit is obtained Fees are doubled | see rule |
How this jurisdiction calculates the fee
Charleston has no water heater line item in its fee schedule. A water heater is permitted under a plumbing trade permit, which carries the non-refundable application fee plus the plumbing permit fee; the plumbing table prices each plumbing fixture, a building water supply and a building sewer, and a water heater appears as a checkbox under building systems on the plumbing trade permit application. A gas fired unit also draws a fuel gas permit, priced by outlet count with its own application fee. Re-inspection is charged separately and fees are doubled where work starts before the permit is obtained. The schedule took effect October 1, 2019; the plumbing trade permit application is dated May 8, 2026. | 2026-09-30 (lane B run 1822) AGE WATCH, NOTHING CHANGED. The cited Building & Trade Permit Fee Schedule (charleston-sc.gov/DocumentCenter/View/17002) returns HTTP 200 and every stored figure on this row re-reads verbatim in it, but the document is headed ORDINANCE NOS. 2017-131, 2019-064 & 2019-072, EFFECTIVE OCTOBER 1, 2019 - seven years old. A successor hunt this pass came up empty: the Permits and Building Inspections index pages were rendered and link no newer fee schedule, and the city still serves this one. Because the schedule carries an OCTOBER 1 effective date, Charleston belongs on the October-1 re-check list with Arlington, Austin, Long Beach, Fort Worth, Corpus Christi, Tallahassee, Irving and Lubbock. SCOPE NOTE: this is charleston in SOUTH CAROLINA; the slug also exists in WEST VIRGINIA and every statement here was scoped by (state, slug, permit_type).
Source: published fee schedule · Verified 10/29/2026
See the full write-up: Charleston building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.