Cheyenne, Wyoming Building Permit Cost Calculator
Estimates permit cost in Cheyenne from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation $1.00 to $500.00 Flat fee $23.50 | $23.50 |
○Valuation $5,000 (counter fee sheet, permit fee) Flat fee $111.25 | $111.25 |
○Valuation $5,000, plan review at 65 percent Flat fee $72.31 | $72.31 |
○Valuation $5,000, permit plus plan review Flat fee $183.56 | $183.56 |
○Valuation $100,000 (counter fee sheet, permit fee) Flat fee $993.75 | $993.75 |
○Planning and Development review fee, applied to all building permits Flat fee $50.00 | $50.00 |
○Inspections outside normal business hours, per hour, two hour minimum Flat fee $85.00 | $85.00 |
○Reinspection fee, flat charge Flat fee $250.00 | $250.00 |
○Residential Enhancement Fee, per dwelling unit Flat fee $400.00 | $400.00 |
How this jurisdiction calculates the fee
Cheyenne prices building permits from one valuation table adopted by city code Section 15.08.030. The codified schedule is effective January 30, 2023, adopted by Ord. No. 4485, Sec. 1, 1-9-23, in a code current through Ord. No. 4662 passed March 23, 2026. Valuations of $1.00 to $500.00 pay $23.50. From $501.00 to $2,000.00 the fee is $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof. From $2,001.00 to $25,000.00 it is $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00. From $25,001.00 to $50,000.00 it is $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00. From $50,001.00 to $100,000.00 it is $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00. From $100,001.00 to $500,000.00 it is $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00. From $500,001.00 to $1,000,000.00 it is $3,233.75 plus $4.75 for each additional $1,000.00, and above $1,000,000.00 it is $5,608.75 plus $3.65 for each additional $1,000.00. Where submittal documents are required, a plan review fee of 65 percent of the permit fee is due when the documents are submitted, separate from and in addition to the permit fee. Under the same section: inspections outside normal business hours are $85.00 per hour with a two hour minimum; inspections for which no fee is specifically indicated are $85.00 per hour with a half hour minimum; additional plan review required by changes, additions or revisions to plans is $85.00 per hour with a half hour minimum; and a reinspection fee is a flat $250.00, not an hourly charge. For use of outside consultants for plan checking or inspections the charge is actual costs plus 2 percent of actual costs for administrative and overhead costs. CORRECTED 2026-09-14: this row previously described reinspections and after hours inspections together at $47.00 per hour in the basis, a rate superseded by Ord. No. 4485 effective January 30, 2023, while carrying an $85.00 example labelled as covering reinspection. The codified table separates the two, $85.00 per hour for after hours and unspecified inspections and $250.00 flat for a reinspection, and both are now recorded separately. A $50.00 Planning and Development review fee applies to all building permits: the Residential Development Fee Worksheet revised 1/28/2026 states it for all building permits, so the earlier qualifier limiting it to the commercial application checklist has been removed. That worksheet also carries the Residential Enhancement Fee of $400.00 per dwelling unit and a park Land Acquisition and Infrastructure Fee of $700.00 per acre pro-rated to the nearest tenth of an acre with a $250.00 minimum, and a Public Safety fee of $1,029.82 per residential unit. Two published figures do not reconcile at the bracket seams: the city counter fee sheet prints $391.25 at a $25,000 valuation and $644.25 at $50,000, while the codified brackets open at $391.75 and $643.75 for those same amounts. Both are reproduced as published. The city Permit Fee Schedule page labels as the Current Fee Schedule a 20 page Bluebeam-stapled reissue of the counter sheet created 2026-09-11; its figures are identical to the older july-1-2008 named file except that it corrects a $19,000 to $20,000 typo to $19,001 to $20,000. fee_source_url was repointed to that current URL on 2026-09-14. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Dedicated deck permit fee None published | see rule |
○Deck valued at $8,000 (counter fee sheet, permit fee) Flat fee $153.25 | $153.25 |
○Deck valued at $8,000, plan review at 65 percent Flat fee $99.61 | $99.61 |
○Planning and Development review fee, applied to all building permits Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Cheyenne publishes no flat deck permit fee. A deck permit is applied for through the city OpenGov permitting portal, but the portal does not attach a fixed price; the fee comes from the valuation table in city code Section 15.08.030, so a deck is priced on the declared value of the work exactly like any other building permit. At the low end that is $23.50 for valuations of $1.00 to $500.00, and for the range that covers most residential decks it is $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof through $25,000.00. Where submittal documents are required a plan review fee of 65 percent of the permit fee is added. A $50.00 Planning and Development review fee applies to all building permits. The city building handout library contains no deck handout and no deck specific fee. Verified 2026-09-14 against the city Permit Fee Schedule page, which now labels as the Current Fee Schedule a Bluebeam-stapled reissue of the same counter fee sheet created 2026-09-11; its figures are identical to the older july-1-2008 named file except that it corrects a $19,000 to $20,000 typo to $19,001 to $20,000, and fee_source_url was repointed to it. Section 15.08.030 as codified (effective January 30, 2023 by Ord. No. 4485, code current through Ord. No. 4662 of 3-23-2026) sets after hours and unspecified inspections at $85.00 per hour and a reinspection at a flat $250.00; earlier references in this jurisdiction to $47.00 per hour were superseded in 2023 and have been removed. The $50.00 Planning and Development review fee is stated for all building permits on the Residential Development Fee Worksheet revised 1/28/2026, so the earlier commercial-checklist-only qualifier was dropped. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Dedicated electrical permit fee None published | see rule |
○Electrical work valued at $1.00 to $500.00 Flat fee $23.50 | $23.50 |
○Electrical work valued at $2,000 (counter fee sheet, permit fee) Flat fee $69.25 | $69.25 |
○Planning and Development review fee, applied to all building permits Flat fee $50.00 | $50.00 |
○Inspections for which no fee is specifically indicated, per hour, half hour minimum Flat fee $85.00 | $85.00 |
○Reinspection fee, flat charge Flat fee $250.00 | $250.00 |
How this jurisdiction calculates the fee
Cheyenne publishes no flat electrical permit fee. Electrical permits are applied for through the city OpenGov permitting portal and priced from the same valuation table in city code Section 15.08.030 that governs building permits; the city building code amendments expressly direct the electrical, plumbing, mechanical and fuel gas codes to that one section for fees. Work valued at $1.00 to $500.00 costs $23.50, and from $501.00 to $2,000.00 the fee is $23.50 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof. Where submittal documents are required a plan review fee of 65 percent of the permit fee is due in addition. Under the same codified section, effective January 30, 2023 by Ord. No. 4485, Sec. 1, 1-9-23, in a code current through Ord. No. 4662 passed March 23, 2026: inspections for which no fee is specifically indicated are $85.00 per hour with a half hour minimum charge, inspections outside normal business hours are $85.00 per hour with a two hour minimum, additional plan review required by changes, additions or revisions to plans is $85.00 per hour with a half hour minimum, and a reinspection fee is a flat $250.00 rather than an hourly charge. CORRECTED 2026-09-14: this row previously stated $47.00 per hour for both unspecified inspections and reinspections, a rate superseded by Ord. No. 4485, and carried an $85.00 per hour example labelled Reinspection. The $47.00 prose has been removed and the two charges are now recorded separately at their codified amounts. A $50.00 Planning and Development review fee applies to all building permits per the Residential Development Fee Worksheet revised 1/28/2026, so the earlier qualifier limiting it to the commercial application checklist has been removed. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Fence 6 feet high or less No permit required | see rule |
Dedicated fence permit fee None published | see rule |
○Taller fence valued at $1.00 to $500.00 Flat fee $23.50 | $23.50 |
How this jurisdiction calculates the fee
Cheyenne publishes no fence permit fee. The city amends the building code list of work exempt from permit so that a fence no more than six feet high needs no building permit, which takes most residential fences out of the fee schedule entirely. A taller fence has no line item of its own, so it is priced from the general valuation table in city code Section 15.08.030, starting at $23.50 for valuations of $1.00 to $500.00 and running to $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 through $25,000.00. Zoning setbacks and sight distance rules still apply to an exempt fence. One caution for anyone comparing city documents: the Residential and Commercial Development Fee Worksheets are Planning and Development impact fees for park land acquisition, park enhancement, public safety and, in some subdivisions, transportation, charged per new dwelling unit or per acre. They are not building permit fees and none of them applies to a fence. Verified 2026-09-14 against the city Permit Fee Schedule page, which now labels as the Current Fee Schedule a Bluebeam-stapled reissue of the same counter fee sheet created 2026-09-11; its figures are identical to the older july-1-2008 named file except that it corrects a $19,000 to $20,000 typo to $19,001 to $20,000, and fee_source_url was repointed to it. Section 15.08.030 as codified (effective January 30, 2023 by Ord. No. 4485, code current through Ord. No. 4662 of 3-23-2026) sets after hours and unspecified inspections at $85.00 per hour and a reinspection at a flat $250.00; earlier references in this jurisdiction to $47.00 per hour were superseded in 2023 and have been removed. The $50.00 Planning and Development review fee is stated for all building permits on the Residential Development Fee Worksheet revised 1/28/2026, so the earlier commercial-checklist-only qualifier was dropped. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Dedicated re-roof permit fee None published | see rule |
○Re-roof valued at $12,000 (counter fee sheet, permit fee) Flat fee $209.25 | $209.25 |
○Re-roof valued at $12,000, plan review at 65 percent Flat fee $136.01 | $136.01 |
○Planning and Development review fee, applied to all building permits Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Cheyenne publishes no flat re-roofing permit fee and no square footage based roof fee. A roof permit is applied for through the city OpenGov permitting portal and priced from the valuation table in city code Section 15.08.030 on the declared value of the work, so a typical residential re-roof lands in the band charging $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof through $25,000.00. Where submittal documents are required a plan review fee of 65 percent of the permit fee is added, and a $50.00 Planning and Development review fee applies to all building permits. The city building code amendments treat Cheyenne as an area of moderate hail exposure, which narrows when an existing asphalt shingle roof may be covered over rather than torn off; that changes the scope of the work but not the fee. No re-roofing handout is published. Verified 2026-09-14 against the city Permit Fee Schedule page, which now labels as the Current Fee Schedule a Bluebeam-stapled reissue of the same counter fee sheet created 2026-09-11; its figures are identical to the older july-1-2008 named file except that it corrects a $19,000 to $20,000 typo to $19,001 to $20,000, and fee_source_url was repointed to it. Section 15.08.030 as codified (effective January 30, 2023 by Ord. No. 4485, code current through Ord. No. 4662 of 3-23-2026) sets after hours and unspecified inspections at $85.00 per hour and a reinspection at a flat $250.00; earlier references in this jurisdiction to $47.00 per hour were superseded in 2023 and have been removed. The $50.00 Planning and Development review fee is stated for all building permits on the Residential Development Fee Worksheet revised 1/28/2026, so the earlier commercial-checklist-only qualifier was dropped. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Detached shed or playhouse, 200 sq ft or less, one story No permit required | see rule |
Dedicated shed permit fee None published | see rule |
○Shed valued at $10,000 (counter fee sheet, permit fee) Flat fee $181.25 | $181.25 |
○Planning and Development review fee, applied to all building permits Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Cheyenne publishes no shed permit fee. The city amends the building code exempt work list so that a single story detached accessory structure of no more than 200 square feet, used as a tool or storage shed, a playhouse or something comparable, needs no building permit. A larger detached accessory structure does need a permit, and its fee comes from the general valuation table in city code Section 15.08.030 rather than from any shed specific rate, beginning at $23.50 for valuations of $1.00 to $500.00 and reaching $391.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 in the band above that. The city Residential Detached Structures handout lists only submittal items, namely a footing and foundation plan wet stamped by a Wyoming registered design professional, building plans, plot and drainage plans and an application, and it states that payment of fees is required at the time of submittal without naming any amount. Verified 2026-09-14 against the city Permit Fee Schedule page, which now labels as the Current Fee Schedule a Bluebeam-stapled reissue of the same counter fee sheet created 2026-09-11; its figures are identical to the older july-1-2008 named file except that it corrects a $19,000 to $20,000 typo to $19,001 to $20,000, and fee_source_url was repointed to it. Section 15.08.030 as codified (effective January 30, 2023 by Ord. No. 4485, code current through Ord. No. 4662 of 3-23-2026) sets after hours and unspecified inspections at $85.00 per hour and a reinspection at a flat $250.00; earlier references in this jurisdiction to $47.00 per hour were superseded in 2023 and have been removed. The $50.00 Planning and Development review fee is stated for all building permits on the Residential Development Fee Worksheet revised 1/28/2026, so the earlier commercial-checklist-only qualifier was dropped. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Cheyenne Municipal Code Sec. 15.08.030 was read in the Municode edition labelled "VERSION: JUN 25, 2026 (CURRENT)", which is newer than the "current through Ord. No. 4662 passed March 23, 2026" edition this row was previously verified against. THE FEE SECTION ITSELF IS UNCHANGED: its citation trail still ends "Ord. No. 4485, § 1, 1-9-23" and the schedule is still headed "On the first day of January 30, 2023, the following building permit fee schedule shall become effective." Every valuation band re-reads verbatim ($23.50 for $1.00-$500.00; $69.25 for the first $2,000.00 plus $14.00 per additional $1,000.00; $391.75 for the first $25,000.00 plus $10.10; $643.75 for the first $50,000.00 plus $7.00; $993.75 for the first $100,000.00 plus $5.60; $3,233.75 for the first $500,000.00 plus $4.75; $5,608.75 for the first $1,000,000.00 plus $3.65), as do plan review at 65 percent of the permit fee, inspections outside normal business hours at $85.00 per hour with a two hour minimum, inspections for which no fee is specifically indicated at $85.00 per hour with a half hour minimum, and reinspection fees at $250.00. The permit exemptions also re-read verbatim in the Title 15 code amendments to Section 105.2/R105.2: "Fences not over 6 feet high" and "One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area is not greater than 200 square feet." CITATION REPAIRED: source_url previously pointed at bldg-fee-schedule-july-1-2008.pdf, a counter fee sheet whose own footer reads "X:\Spreadsheets\Amber\Graduated Fee Increase\Fee Schedule for Counter.xls (1997)". That file still returns HTTP 200 and its table is identical to the operative code table line for line, but it is not the operative authority, so source_url now cites Sec. 15.08.030 directly. fee_source_url is unchanged and still resolves; note that the file it serves was re-stapled (PDF CreationDate Fri Sep 11 2026, Bluebeam Stapler, 20 pages) and consists of the same one-page schedule repeated ten times, with no figure altered. SOURCING GAP REPORTED, NOT GUESSED: the $50.00 Planning and Development review fee (carried on five Cheyenne rows) and the $400.00 Residential Enhancement Fee per dwelling unit (carried on the building row) appear in NEITHER cited document NOR anywhere in Title 15 of the code. They were searched for by amount and by name across both PDFs, the whole of Title 15, and a site-restricted web search of cheyennecity.org. A human should locate the resolution or schedule that sets them, or they should be removed.
Source: published fee schedule · Verified 9/28/2026
See the full write-up: Cheyenne building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.