traffic control measures will be paid for in accordance with
801.18
Payment will be made under: Pay Item Pay Unit Symbol 190 Cracks in PC CP, Filled .............................................................. LFT Cracks in PCCP, Rout and Seal ................................................. LFT Joints in PC CP, Filled................................................................ LFT Joints in PCCP, Saw and Seal ................................................... LFT Profiling PCCP .......................................................................... SYS Retrofit Load Transfer ............................................................... EACH
The cost of cutting of slots, cleaning, dowel bars, dowel bar supports, dowel bar end caps, foam board, mortar, and curing materials shall be included in the cost of the 200 pay item, retrofit load transfer. The cost of cleaning, sealing materials, and all incidentals shall be included in the cost of the pay item cracks in PCCP, filled or joints in PCCP, filled.
The cost of routing, cleaning, sealing materials, and all incidentals shall be included in the cost of the pay item cracks in PCCP, rout and seal. The cost of sawing, cleaning, sealing materials, and all incidentals shall be included in the cost of the pay item joints in PCCP, saw and seal. 210 The cost of all grinding, diamond cutting heads, and cleaning of the pavement, shall be included in the cost of the pay item for profiling.