401.01Description
This work shall consist of one or more courses of QC/QA HMA base, intermediate, or surface mixtures constructed on prepared foundations in accordance with 105.03.
401.02Quality Control
The HMA shall be produced from a certified HMA plant in accordance with ITM 583, Certified Hot Mix Asphalt Producer Program. 10
The HMA shall be transported and pl aced according to a QCP prepared and submitted by the Contractor in accordance with ITM 803, Contractor Quality Control Plans for Hot Mix Asphalt Pavements. The QCP shall be submitted to the Engineer at least 15 days prior to commencing HMA paving operations.
When a safety edge is required for a project, the QCP shall identify the devices in accordance with 409.03(c) to be used for constructing the safety edge.
MATERIALS
401.03Materials
Materials shall be in acco rdance with the following:
Asphalt Materials PG Binder ............................................................. 902.01(a) Coarse Aggregates ....................................................... 904.03 Base Mixtures – Class D or Higher Intermediate Mixtures – Class C or Higher 30 Surface Mixtures* – Class B or Higher Fine Aggregates ........................................................... 904.02 Stabilizing Additives ................................................... AASHTO M 325 * Surface aggregate requirements are listed in 904.03(d).
401.04Design Mix Formula
A DMF shall be prepared in accordance with 401.05 an d submitted in a format acceptable to the Engineer one week prior to use. The DMF shall be based on the ESAL category identified in the pay item and shall state the mixture designation and maximum particle size in the mixture. No mixture shall be used until the DMF has 40 been assigned a mixture number by the DTE.
401.04
The DMF shall state the binder content, the ǻ3Eas determined in accordance with ITM 591, and the MAF. The DMF shall state the source, type, and dosage rate of any stabilizing additives.
The ESAL category identified in the pay item correlates to the following ESAL ranges.
ESAL Category ESAL 2* < 3,000,000 3 3,000,000 to < 10,000,000 4* > 10,000,000 * A category 2 mixture shall replace a category 1 mixture and a category 4 mixture shall replace a category 5 mixture.
The plant discharge temperature for any mixture shall not be more than 315°F whenever PG 64-22 or PG 70-22 binders are used or not more than 325°F whenever PG 76-22 binder is used. QC/QA HMA may be produced using a water-injection foaming device. The DMF shall list the minimum and maximum plant discharge temperatures as applicable to the mixture.
401.05Volumetric Mix Design
The DMF shall be determined for each mi xture from a volumetric mix design by a design laboratory selected from the Department’s list of Qualified Mix Design 60 Laboratories. A volumetric mixture shall be designed in accordance with AASHTO R 35 and the respective AASHTO reference as listed below.
All loose mixtures shall be conditione d for 4 h in accordance with AASHTO R 30 prior to testing. Steel furnace slag coarse aggregate, when used in an intermediate or base mixture application, shall have a deleterious content less than 4.0% as determined in accordance with ITM 219.
Bulk Specific Grav ity and Density of Compacted Asphalt Mixtures using 70 Automatic Vacuum Sealing ...................................... AASHTO T 331
The single percentage of aggregate passi ng each required sieve shall be within the limits of the following gradation tables:
401.05
Sieve Size Dense Graded, Mixture Designation – Control Point (Percent Passing) 25.0 mm 19.0 mm 12.5 mm 9.5 mm 4.75 mm** 2 in. (50.0 mm) 1 1/2 in. (37.5 mm) 100.0 1 in. (25.0 mm) 90.0 - 100.0 100.0 3/4 in. (19.0 mm) < 90.0 90.0 - 100.0 100.0 1/2 in. (12.5 mm) < 90.0 90.0 - 100.0 100.0 100.0 3/8 in. (9.5 mm) < 90.0 90.0 - 100.0 95.0 - 100.0 No. 4 (4.75 mm) < 90.0 90.0 - 100.0 No. 8 (2.36 mm) 19.0 - 45.0 23.0 - 49.0 28.0 - 58.0 32.0 - 67.0* No. 16 (1.18 mm) 30.0 - 55.0 No. 30 (600 μm) No. 50 (300 μm) No. 200 (75 μm) 1.0 - 7.0 2.0 - 8.0 2.0 - 10.0 2.0 - 10.0 3.0 - 8.0 * The mix design gradation shall be less than or equal to 58.0% passing the No. 8 (2.36 mm) sieve for all 9.5 mm surface mixtures. The mix design gradation can be greater than 58.0% passing the No. 8 (2.36 mm) sieve when used on non-Department maintained facilities.
** The total blended aggregate gradation for the 4.75 mm mixture shall have a fineness modulus greater than or equal to 3.30 as determined in accordance with AASHTO T 27.
Primary Control Sieve, PCS, Control Point for Mixture Designation (Percent Passing) Mixture Designation 25.0 mm 19.0 mm 12.5 mm 9.5 mm 4.75 mm PCS 4.75 mm 4.75 mm 2.36 mm 2.36 mm n/a PCS Control Point 40 47 39 47 n/a
401.05
Sieve Size Open Graded, Mixture Designation – Control Point (Percent Passing) OG9.5 mm OG19.0 mm OG25.0 mm 1 1/2 in. (37.5 mm) 100.0 1 in. (25.0 mm) 100.0 70.0 – 98.0 3/4 in. (19.0 mm) 70.0 – 98.0 50.0 – 85.0 1/2 in. (12.5 mm) 100.0 40.0 – 68.0 28.0 – 62.0 3/8 in. (9.5 mm) 75.0 – 100.0 20.0 – 52.0 15.0 – 50.0 No. 4 (4.75 mm) 10.0 – 35.0 10.0 – 30.0 6.0 – 30.0 No. 8 (2.36 mm) 0.0 – 20.0 7.0 – 23.0 7.0 – 23.0 No. 16 (1.18 mm) 2.0 – 18.0 2.0 – 18.0 No. 30 (600 μm) 1.0 – 13.0 1.0 – 13.0 No. 50 (300 μm) 0.0 – 10.0 0.0 – 10.0 No. 100 (150 μm) 0.0 – 9.0 0.0 – 9.0 No. 200 (75 μm) 0 – 6.0 0.0 – 8.0 0.0 – 8.0 % Binder > 3.0 > 3.0 > 3.0
Dust/Calculated Effective Binder Ratio shall be 0.6 to 1.4. The Dust/Calculated Effective Binder Ratio for 4.75 mm mixtures shall be 1.0 to 2.0.
The optimum binder content shall produce Dǻ3EDVGHWHUPLQHGLQ accordance with ITM 591 and the following air voids at N des:
AIR VOIDS AT OPTIMUM BINDER CONTENT Dense Graded Open Graded Mixture Designation 25.0 mm 19.0 mm 12.5 mm 9.5 mm 4.75 mm 25.0 mm 19.0 mm 9.5 mm Air Voids 5.0% 5.0% 5.0% 5.0% 5.0% 15.0% - 20.0% 12.0% - 17.0%
The design for dense graded mixtures shal l have at least four points, including a 90 minimum of two points above and one point below the optimum. A one point design may be used for open graded mixtures. The MSG shall be mass determined in water in accordance with AASHTO T 209. The BSG of the gyratory specimens shall be determined in accordance with AASHTO T 166, Method A or AASHTO T 331, if required, for dense graded and open graded mixtures.
The percent draindown of open graded mixtures shall not exceed 0.30% in accordance with AASHTO T 305. Open graded mixtures ma y incorporate recycled materials and fibers. The recycled materials shall be in accordance with 401.06. The fiber type and mini mum dosage rate shall be in accordance with AASHTO M 325. 100 The binder for open graded mixtures may have the upper temperature classification 401.05
reduced by 6°C from the specified binder grade if fibers are incorporated into the mixture or if 3.0% reclaimed asphalt shingles by weight of the total mixture is used.
The percent draindown of dense graded mixtures shall not exceed 0.30% in accordance with AASHTO T 305. Dense graded mixture shall be tested for moisture susceptibility in accordance with AASHTO T 283, except that the loose mixture curing shall be replaced by mixture conditioning for 4 h in accordance with AASHTO R 30. The minimum TSR shall be 80%. The 6 in. mixture specimens shall be compacted in accordance with AASHTO T 312. If anti-stri pping additives are added to the mixture 110 to be in accordance with th e minimum TSR requi rements, the dosage rate shall be submitted with the DMF.
A PG binder grade or source change will not require a new mix design. If the upper temperature classification of the PG binder is lower than the original PG grade, a new TSR value is required.
The MAF equals the Gmm from the mixture design divided by the following:
,IWKH0$)FDOFXODWLRQUHVXOWVLQDYDOXHZKHUH0$) WKHQWKH MAF shall be considered to be 1.000. If the MAF is greater than 1.020, the calculated MAF value shall have 0.020 subtracted from the value. If the MAF is less than 0.980, the calculated MAF value shall have 0.020 added to the value. The MAF does not apply to OG mixtures.
Changes in the source or types of aggregates shall require a new DMF. 130
The mixture design compaction temperature for the specimens shall be 300 ±9°F for dense graded mixtures and 260°F for open graded mixtures.
Design criteria for each mixture shall be based on the ESAL shown in the contract documents and shall be as follows:
401.05
GYRATORY COMPACTION EFFORT ESAL N ini* N des* N max* Max. %Gmm @ Nini Max. %Gmm @ Nmax Dense Graded 4.75 mm < 3,000,000 7 75 115 90.5 98.0 3,000,000 to < 10,000,000 8 100 160 89.0 98.0 > 10,000,000 8 100 160 89.0 98.0 Dense Graded 9.5 mm, 12.5 mm, 19.0 mm, and 25.0 mm < 3,000,000 5 30 40 91.5 97.0 3,000,000 to < 10,000,000 6 50 75 91.5 97.0 > 10,000,000 6 50 75 91.5 97.0 Open Graded All ESAL n/a 20 n/a n/a n/a * Nini, Ndes, Nmax - definitions are included in AASHTO R 35.
Voids in Mineral Aggregate, VMA, Criteria @ Ndes Mixture Designation Minimum VMA, % 4.75 mm 17.0 9.5 mm 16.0 12.5 mm 15.0 19.0 mm 14.0 25.0 mm 13.0 OG n/a
Volume of Effective Binder, Vbe, Criteria @ Ndes Mixture Designation Minimum Vbe, % 4.75 mm 12.0 9.5 mm 11.0 12.5 mm 10.0 19.0 mm 9.0 25.0 mm 8.0 OG n/a
401.05
Voids Filled with Asphalt, VFA, Criteria @ Ndes ESAL VFA, % < 3,000,000 60 – 73 3,000,000 to < 10,000,000 60 – 70 10,000,000 60 – 70 Notes:
GHVLJQWUDIILFOHYHOV,000,000 ESALs.
for design traffic levels < 300,000 ESALs.
401.06Recycled Materials
Recycled materials may consist of RAP or RAS or a blend of both. RAP shall be the product resulting from the cold milling or crushing of an existing HMA pavement. Before entering the plant, RAP shall be processed so that 100% will pass the 2 in. (50 mm) sieve. Before entering the plant, RAS shall be processed so that 100% will pass 150 the 3/8 in. (9.5 mm) sieve. The RAP coarse aggregate shall pass the maximum size sieve for the mixture being produced.
RAP for the ESAL category 3 and 4 surface mixtures shall be a fine RAP with 100% passing the 3/8 in. (9.5 mm) sieve and 95 to 100% passing the No. 4 (4.75 mm) sieve. The Contractor may request the use of coarse RAP in a category 4 surface mixture up to a maximum 20.0% by volume of material retained on the No. 4 (4.75 mm) sieve. The election to use coarse RAP in a category 4 surface mixture will void the allowed use of crushed stone and gravel coarse aggregate materials in accordance with 904.03(d). SMA RAP as defined in 410.06 shall not be used in any HMA mixture. 160
Recycled materials may be used as a s ubstitute for a portion of the new materials required to produce HMA mixtures. The amount of total binder replaced by binder in the recycled material shall be computed as follows:
Binder Replacement, % = (A x B)+(C x D) E
where: A = RAP, % Binder Content by Mass of RAP B = RAP, % by Total Mass of Mixture C = RAS, % Binder Content by Mass of RAS 170 D = RAS, % by Total Mass of Mixture E = Total, % Binder Content by Total Mass of Mixture.
RAS may be obtained from either pre-consumer or post-consumer asphalt shingles. The two RAS types shall not be blended together for use in HMA mixtures.
401.06
Post-consumer asphalt shingles shall be in accordance with the following:
180
(4.75 mm) sieve shall not exceed 0.5% by mass,
paper, wood, and plastic retained on or above the No. 4 (4.75 mm)
sieve shall not exceed 1.5% by mass, and
with an IDEM Legitimate Use Approval letter. The approval letter
shall be submitted with the DMF to the Engineer.190
The recycled material percentages shall be as specified on the DMF. HMA
mixtures utilizing recycled materials shall be limited to the binder replacement
percentages in the following table:
HMA mixtures utilizing RAP or RAS or a blend of RAP and RAS
MAXIMUM BINDER REPLACEMENT, %
Mixture
Category
Base and Intermediate Surface
Dense Graded Open Graded Dense Graded
25.0
mm
19.0
mm
12.5
mm
9.5
mm
25.0
mm
19.0
mm
9.5
mm
12.5
mm
9.5
mm
4.75
mm
2 25.0* 25.0* 25.0*
3 25.0* 25.0* 25.0*
4 25.0* 25.0* 25.0*
* 7KHFRQWULEXWLRQRI5$6WRDQ\+0$PL[WXUHVKDOOEH 3.0% by total mass of mixture
DQGELQGHUUHSODFHPHQW
The combined aggregate properties shall be in accordance with 904. The
combined aggregate bulk specific gravity shall be determined in accordance with ITM
584 and the combined aggregate gradation shall be in accordance with 401.05 for the200
HMA mixture specified.
401.07Lots and Sublots
Lots will be defined as 5,000 t of base or intermediate mixtures or 3,000 t of
surface mixture. Lots will be further sub-divided into sublots not to exceed 1,000 t of
base or intermediate mixtures or 600 t of surface mixture. Partial sublots of 100 t or
less will be added to the previous sublot. Partial sublots greater than 100 t constitute a
full sublot. Partial lots of four sublots or less will be added to the previous lot to create
an extended lot.
210
401.07
309
401.08Blank
401.09Acceptance of Mixtures
Acceptance of mixtures for Vbe at Ndes , and air voids at Ndes for each lot will be
based on tests performed by the Engineer for dense graded 9.5 mm, 12.5 mm, 19.0
mm and 25.0 mm mixtures with original contract pay item quantities greater than or
equal to 300 t.
Acceptance of mixtures for binder content and air voids at Ndes will be based on a
Type D certification in accordance with 402.09 for dense graded mixtures with220
original contract pay item quantities less than 300 t. Acceptance of mixtures for binder
content and air voids at N des for each lot will be based on a Type D certification in
accordance with 402.09 for dense graded 4.75 mm mixtures.
Acceptance of mixtures for binder content and air voids at Ndes for each lot will
be based on tests performed by the Engineer for open graded mixtures with original
contract pay item quantities greater than or equal to 300 t. Acceptance of mixtures for
binder content and air voids at N des will be based on a Type D certification in
accordance with 402.09 for open graded mixtures with original pay item quantities
less than 300 t, except the air voids tolerance shall be ±3.5% from the DMF.230
The Engineer will randomly select the location within each sublot for sampling in
accordance with ITM 802. The first 300 t of the first sublot of the first lot for each
mixture pay item will not be sampled. An acceptance sample will consist of plate
samples obtained in accordance with ITM 802 and ITM 580. The Engineer will take
immediate possession of the samples.
Acceptance samples will be reduced to the appropriate size for testing in
accordance with ITM 587. The binder content and gradation will be determined in
accordance with ITM 571. The maximum specific gravity will be mass determined in240
water in accordance with AASHTO T 209.
The effective specific gravity, Gse, of the mixture will be determined in each
sublot and reported from the acceptance sample testing.
The total aggregate bulk specific gravity, Gsb, value will be determined in
accordance with ITM 597.
The air voids will be determined in accordance with AASHTO R 35 based on the
average bulk specific gravity from two gyratory specimens and the MSG for the sublot.250
The VMA will be determined in accordance with AASHTO R 35 based on the average
bulk specific gravity from two gyratory specimens, the percent aggregate in the
mixture from the sublot, and the BSG of the aggregate blend from the DMF as
applicable. The gyratory specimens will be prepared in accordance with AASHTO T
312.
401.09
310
The dust/calculated effective binder ratio and the volume of effective binder in
the mixture will be determined and reported from the acceptance sample testing
conducted in each sublot. The volume of effective binder will be the difference
between VMA and air voids. The Contractor shall take action in accordance with ITM260
583 to address a dust/calculated effective binder ratio not in accordance with 401.05,
a volume of effective binder in the mixture below design minimums, or a volume of
effective binder in the mixture greater than 2.0% above design minimums.
The bulk specific gravity of gyratory specimens for dense graded mixtures will
be determined in accordance with AASHTO T 166, Method A or AASHTO T 331, if
required, except samples are not required to be dried overnight. The bulk specific
gravity of gyratory specimens for open graded mixtures will be determined in
accordance with AASHTO T 331.
270
A binder draindown test in accordance with AASHTO T 305 for open graded
mixtures shall be completed once per lot in accordance with 401.07 and shall not
exceed 0.50%.
The Contractor shall make available the sublot quality control results within seven
calendar days from the date the acceptance sample was taken.
The Engineer will make available the sublot acceptance test results after receiving
the sublot quality control results from the Contractor.
280
Air voids, binder content and Vbe values will be reported to the nearest 0.01%.
Draindown test results will be rounded to the nearest 0.01%. Rounding will be in
accordance with 109.01(a).
Pay factors for dense graded mixtures with original contract pay item quantities
greater than or equal to one lot will be determined in accordance with 401.19(a). Partial
lots of four sublots or less will have pay factors determined in accordance with
401.19(b) if the previous lot is not available
Pay factors for dense graded mixtures with original contract pay item quantities290
greater than or equal to 300 t and less than one lot and open graded mixtures will be
determined in accordance with 401.19(b).
The Contractor may request an appeal of the Engineer’s test results in accordance
with 401.20.
A Type C certification in accordance with 916 shall be provided for the stabilizing
additives for each shipment. Stabilizing additives from different manufacturers and
different types of stabilizing additives shall not be intermixed.
300
401.09
311
In the event that an acceptance sample is not available to represent a sublot, all
test results of the previous sublot will be used for acceptance. If the previous sublot is
not available, the subsequent sublot will be used for acceptance.
Samples shall not be obtained from the following areas:
is not placed simultaneously with the mainline.
placed simultaneously with the mainline.
409.03(c)2 or 409.03(c)3
If a random location falls within this area, the Engineer will randomly select
another location within the sublot for sampling. If an entire sublot falls within this
area, test results from the previous sublot will be used for acceptance. If the previous320
sublot is not available, the subsequent sublot will be used for acceptance. If previous
or subsequent sublot results for a mixture accepted by 401.19(a) will be replicated for
an entire lot, each sublot in that lot will be accepted by 401.19(b).
CONSTRUCTION REQUIREMENTS
401.10General
Equipment for HMA operations shall be in accordance with 409. The Contractor
shall submit to the Engineer written documentation that includes the manufacturer’s
make, model, serial number, manufactured year, and the manufacturer’s literature with330
pictures. The documentation shall be submitted prior to use and shall certify that the
paving equipment proposed for the project is new and includes the modifications or
has been modified in accordance with the following.
The paver shall be equipped with means of preventing the segregation of the
coarse aggregate particles when moving the mixture from the paver hopper to the
paver augers. The means and methods used shall be in accordance with the paver
manufacturer’s instructions and may consist of chain curtains, deflector plates, or other
such devices, or any combination of these.
340
The following specific requirements shall also apply to identified HMA pavers:
Knox Materials Management Kit, MMK.
in 1989 or later.
401.10
312
deflector plates as identified in the December 2000 Service350
Magazine entitled “New Asphalt Deflector Kit {6630-DFL,
6631-DFL, or 6640-DFL}”.
The Contractor shall demonstrate to the Engineer, prior to use, that the
modifications to the paving equipment have been implemented on all pavers to be used
on the project.
Fuel oil, kerosene, or solvents shall not be transported in open containers on
equipment. Cleaning of equipment and small tools shall not be performed on the
pavement or shoulder areas.360
HMA mixtures shall not exhibit segregation, flushing, or bleeding. Corrective
action shall immediately be taken to prevent continuation of these conditions.
Segregated, flushed, or bleeding HMA mixtures will be referred to the Department’s
Division of Materials and Tests for adjudication as a failed material in accordance with
105.03
All mixtures that become loose and broken, mixed with dirt, or are defective in
any way shall be removed and replaced in accordance with 105.03.
370
401.11Preparation of Surfaces to be Overlaid
The subgrade, or subbase shall be shaped to the required grade and sections, free
from all ruts, corrugations, or other irregularities, and uniformly compacted and
approved in accordance with 207 and 302. Milling of an existing pavement surface
shall be in accordance with 306. Surfaces on which a mixture is placed shall be free
from objectionable or foreign materials at the time of placement.
Rubblized concrete pavements shall be primed in accordance with 405. PCCP,
milled asphalt surfaces, and new and existing asphalt surfaces shall be tacked in
accordance with 406. Contact surfaces of curbing, gutters, manholes, and other380
structures shall be tacked in accordance with 406.
All partially completed sections of roadway that are 8 in. or less in thickness shall
be proofrolled prior to the placement of additional materials unless otherwise directed
by the Engineer. Proofrolling shall be accomplished in accordance with 203.26. The
contact pressure shall be 70 to 80 psi. Soft yielding areas shall be removed and
replaced.
401.12Process Control
The Engineer and Contractor will jointly review the operations to ensure390
compliance with the QCP. Continuous violations of compliance with the QCP will
result in suspension of paving operations.
401.11
313
401.13Weather Limitations
HMA courses of less than 138 lb/sq yd shall be placed when the ambient
temperature and the temperature of the surface on which it is to be placed is 45°F or
above. No mixture shall be placed on a frozen subgrade.
401.14Spreading and Finishing
The mixture shall be placed upon an approved surface by means of laydown400
equipment in accordance with 409.03(c). Prior to paving, both the planned quantity
and lay rate shall be adjusted by multiplying by the MAF. When mixture is produced
from more than one DMF for a given pay item, the MAF will be applied to the
applicable portion of the mixture for each. The temperature of each mixture at the time
of spreading shall be less than 315°F whenever PG 64-22 or PG 70-22 binders are used
or not more than 325°F whenever PG 76-22 binder is used. No mixture shall be placed
on a previously paved course that has not cooled to below 175°F. For mixtures
compacted in accordance with 402.15, the temperature of each mixture at the time of
spreading shall not be less than 245°F.
410
Planned HMA courses greater than 220 lb/sq yd placed under traffic, shall be
brought up even with each adjacent lane at the end of each work day. Planned HMA
courses less than or equal to 220 lb/sq yd shall be brought forward concurrently, within
practical limits, limiting the work in one lane to not more than one work day of
production before moving back to bring forward the adjacent lane. Traffic shall not be
allowed on open graded mixtures.
Hydraulic extensions on the paver will not be allowed for continuous paving
operations. Fixed extensions or extendable screeds shall be used on courses greater
than the nominal width of the paver except in areas where the paving width varies.420
Hydraulic extensions may be used in tapers and added lanes less than 250 ft in length.
Automatic slope and grade controls shall be used as outlined in the QCP.
HMA mainline and HMA shoulders which are 8 ft or more in width shall be
placed with paving equipment in accordance with 409.03(c)1.
When laying mixtures with density not controlled by cores, the speed of the paver
shall not exceed 50 ft per minute. Rollers shall be operated to avoid shoving of the
HMA and at speeds not to exceed 3 mph. However, vibratory rollers will be limited to430
2.5 mph.
The finished thickness of any course shall be at least two times but not more than
five times the maximum particle size as shown on the DMF, except 4.75 mm mixtures
shall be at least 1.5 times but not more than 3 times the maximum particle size shown
on the DMF.
A safety edge shall be constructed at locations where a dense graded intermediate
mixture or a surface mixture is constructed adjacent to an aggregate or earth shoulder.
401.14
314
440
Vibratory rollers in accordance with 409.03(d)4 shall not be operated in the
vibratory mode at locations indicated on the plans. Oscillatory rollers in accordance
with 409.03(d)5 will be allowed for use but the vertical impact force capability shall
not be used. Density acceptance shall be in accordance with 401.16.
401.15Joints
Longitudinal joints in the surface shall be at the lane lines of the pavement.
Longitudinal joints below the surface shall be offset from previously constructed joints
by approximately 6 in. and be located within 12 in. of the lane line.
450
Hot poured joint adhesive in accordance with 906 shall be applied to longitudinal
joints constructed between two adjacent HMA courses in the top course of dense
graded intermediate mixtures and all 4.75 mm, 9.5 mm, and 12.5 mm surface mixture
courses. This includes joints within the traveled way as well as between any of the
following:
460
The material shall be heated in a jacketed, double boiler melting kettle. The kettle
shall have an attached pressure feed wand system with applicator shoe.
The joint adhesive shall be applied to the face of the previously constructed edge
at the joint using a wand applicator. Prior to application of the joint adhesive, the joint
face shall be dry and free of loose material and foreign objects. The adhesive shall be
applied on the joint face 1/8 in. thick at the temperature recommended by the
manufacturer. Excess joint adhesive shall not be allowed to pool on the top of the
previously constructed pavement course or the pavement to be overlaid. The
application of the adhesive shall be made within the same day, but at least 30 minutes470
prior to construction of the longitudinal joint.
All 9.5 mm and 12.5 mm surface mixture longitudinal joints that have the joint
adhesive applied shall be sealed using SS-1h, RPE, or AE-NT asphalt emulsion in
accordance with 902.01(b). The sealing operation shall not begin until all density cores
in accordance with 401.16 and 401.20 have been obtained and the installation of
pavement corrugations, when specified in accordance with 606, has been completed.
The liquid asphalt sealant shall be a minimum width of 24 in., centered on the
joint line, and shall be extended, when necessary, to provide coverage beyond the edge480
of the pavement corrugation. The sealant shall be applied onto a dry surface, free of
any foreign or loose material, using a distributor in accordance with 409.03(a). The
sealant temperature at the time of application shall be at least 135°F and shall not
exceed 180°F. The ambient air and pavement temperatures at the time of application
shall be greater than 32°F.
401.15
315
The application rate of the sealant shall be as follows:
Asphalt Emulsion Application Rate* (gal./sq yd)
SS-1h or AE-NT 0.03 ±0.01**
RPE 0.15 ±0.01***
* The asphalt material shall not be diluted.
** Areas receiving greater than 0.04 gal./sq yd shall be lightly broomed to
reduce the effects of excess sealant on the pavement surface.
*** The application rate shall be reduced when sealing milled corrugations in
accordance with 606. The application rate shall be 0.11 ±0.01 gal./sq yd.
490
Temporary pavement markings in accordance with 801.12 shall be offset a
sufficient distance from the longitudinal joint so as not to obstruct the installation of
the pavement corrugations or the application of the liquid asphalt sealant.
The SS-1h or AE-NT sealant shall be cured a minimum of five days prior to
applying the permanent pavement traffic markings in accordance with 808. The RPE
sealant shall be cured a minimum of 48 h prior to applying the permanent pavement
traffic markings in accordance with 808. Where pavement markings are to be grooved
in accordance with 808.07(b)1, the minimum cure for the sealant shall not apply.
500
Transverse joints shall be constructed by exposing a near vertical full depth face
of the previous course. For areas inaccessible to rollers, other mechanical devices shall
be used to achieve the required density.
If constructed under traffic, temporary transverse joints shall be feathered to
provide a smooth transition to the driving surface.
401.16Density
Acceptance will be based on lots and sublots in accordance with 401.07.
510
Density of the compacted dense graded mixture will be determined from cores
except where:
to the contract award is less than 385 lb/sq yd, or
shoulder existing prior to the contract award.
Density of any random core location in these areas will be assigned a value of520
94.0% MSG and compaction shall be in accordance with 402.15.
401.16
316
Open graded mixtures shall be compacted with six passes of a static tandem roller
and will be assigned a value of 84.0% MSG. Vibratory rollers shall not be used on
open graded mixtures.
Compaction of 4.75 mm mixtures shall be in accordance with 402.15, except
vibratory rollers shall be operated in static mode and the vertical impact force
capability of oscillatory rollers shall not be used.
530
Compaction of mixtures with original contract pay item quantities less than 300 t
shall be in accordance with 402.15.
Density acceptance by cores will be based on samples obtained from two random
locations selected by the Engineer within each sublot in accordance with ITM 802.
One core shall be cut at each random location in accordance with ITM 580. The
transverse core location will be located so that the edge of the core will be no closer
than 3 in. from a confined edge or 6 in. from a non-confined edge of the course being
placed. The maximum specific gravity will be determined from the samples obtained
in 401.09.540
The Contractor shall obtain cores in the presence of the Engineer with a device
that shall produce a uniform 6.00 ±0.25 in. diameter pavement sample. Coring shall
be completed prior to the random location being covered by the next course.
All core locations will be marked and shall be cored within two work days of
placement. A damaged core shall be discarded and replaced with a core from a location
selected by adding 1 ft to the longitudinal location of the damaged core using the same
transverse offset.
550
The Contractor and the Engineer shall mark the core to define the course to be
tested. If the core indicates a course thickness of less than two times the maximum
particle size, the core will be discarded and a core from a new random location will be
selected for testing.
Cores shall not be obtained from the following areas:
not placed simultaneously with the mainline.
560
simultaneously with the mainline.
401.16
317
or 409.03(c)3.570
If a random location falls within this area, the Engineer will randomly select
another location within the sublot for coring. If an entire sublot falls within this area,
test results from the previous sublot will be used for acceptance. If the previous sublot
is not available, the subsequent sublot will be used for acceptance.
The Engineer will take immediate possession of the cores. If the Engineer’s cores
are subsequently damaged, additional coring will be the responsibility of the
Department. Subsequent core locations will be determined by subtracting 1 ft from the
random location using the same transverse offset.580
The density for the mixture will be expressed as:
Density, % = BSG
MSG x 100
where:
BSG = average bulk specific gravity
MSG = maximum specific gravity
Samples for the bulk specific gravity and maximum specific gravity will be dried
in accordance with ITM 572. The Engineer will determine the bulk specific gravity of590
the cores in accordance with AASHTO T 166, Method A or AASHTO T 331, if
required. The maximum specific gravity will be mass determined in water in
accordance with AASHTO T 209.
Within one work day of coring operations, the Contractor shall clean, dry, and
refill the core holes with either HMA of similar or smaller size particles or bridge deck
repair material from the QPL of Rapid Setting Patch Materials. The rapid setting patch
material shall be mixed in a separate container and placed in the hole in accordance
with the manufacturer’s recommendations, consolidated by rodding, and struck-off
flush with the adjacent pavement.600
The Engineer’s acceptance test results for each sublot will be available when the
sublot testing is complete. Acceptance of the pavement for density, %MSG, will be
reported to the nearest 0.01%. Rounding will be in accordance with 109.01(a).
401.17Pavement Corrugations
Pavement corrugations shall be in accordance with 606.
401.18Pavement Smoothness
Pavement smoothness will be accepted by means of an inertial profiler, a 16 ft610
straightedge, or a 10 ft straightedge as described below.
When a pay item for Inertial Profiler, HMA is included in the contract, the
401.18
318
Contractor shall furnish, calibrate, and operate an approved inertial profiler in
accordance with ITM 917 for the acceptance of longitudinal smoothness on the
mainline traveled way, including adjacent acceleration or deceleration lanes, where all
of the following conditions are met:
0.5 mi in length.
for a single lift is 165 lb/sq yd or greater, or the total combined
planned lay rate of surface, intermediate, and base courses is
385 lb/sq yd or greater.
The profiles and International Roughness Index, IRI, results including areas of630
localized roughness shall become the property of the Department. The inertial profiler
shall remain the property of the Contractor.
The project area will be divided into individual smoothness sections measuring
0.1 mi in length for each lane. The paving exceptions and areas exempt from inertial
profiler operation will be in accordance with ITM 917.
If the posted speed limit for an entire smoothness section is less than or equal to
45 mph, the section will be exempt from Inertial Profiler operation and the smoothness
within the section will be accepted in accordance with 401.18(b).640
If the posted speed limit is greater than 45 mph for a portion of a smoothness
section and is less than or equal to 45 mph for the remainder, the section smoothness
acceptance will be as follows:
speed limit greater than 45 mph.
a posted speed limit less than or equal to 45 mph.650
At locations where the inertial profiler is required, it shall be used on the surface
course and on any dense graded intermediate course immediately below the surface
course.
The Contractor shall furnish and operate a 16 ft straightedge in accordance with
306.03(d) and as described below. The 16 ft straightedge shall be used to measure
smoothness along the direction of mainline traffic.
660
401.18
319
Locations on the pavement surface scraped by the straightedge shall be marked.
The pavement shall be corrected in accordance with 401.18(e) to meet the required
tolerance. For existing utility and manhole castings that required no grade adjustment,
the tolerance may be adjusted after being reviewed and approved by the Engineer.
For contracts which include the Inertial Profiler, HMA pay item, the 16 ft
straightedge or the Inertial Profiler simulating the 16 ft straightedge shall be used to
measure longitudinal smoothness on surface courses at the following locations:
inertial profiler operation in accordance with ITM 917.
with posted speed limits less than or equal to 45 mph throughout
the entire section length.
680
than 0.5 mi.
with posted speeds of 45 mph or less.
690
For contracts where the inertial profiler is not used for smoothness acceptance,
the 16 ft straightedge shall be used to measure longitudinal smoothness on all surface
courses, and on any dense graded intermediate course immediately below the surface
course. Measurement with the 16 ft straightedge shall include the above locations, all
mainline traveled way lanes and ramps with posted speeds greater than 45 mph, and
on ramp acceleration or deceleration lanes.
The 10 ft straightedge will be in accordance with 306.03(d). The 10 ft straightedge
will be used to check transverse slopes, across travel lanes and shoulders, approaches,
and crossovers. When the 10 ft straightedge is used, the pavement variations shall be
corrected to 1/8 in. or less.
At locations where the inertial profiler is being used on an intermediate course,
401.18
320
all areas having a localized roughness in excess of 160 in./mi utilizing continuous IRI
with a 25 ft window shall be corrected subject to approval by the Engineer.
710
At locations where the inertial profiler is being used on a surface course, all areas
under category Type A, as defined in 401.19(c), having a localized roughness in excess
of 160 in./mi or category Type B in excess of 170 in./mi utilizing continuous IRI with
a 25 ft window shall be corrected subject to approval by the Engineer. After ALR's
have been identified, a grinding simulation shall be performed to estimate whether the
ALR can be corrected to an IRI value of less than 160 in./mi with no more than a 1/4
in. max grind depth at any spot. If such correction is not possible, then an ALR with
an IRI value of less than 190 in./mi can remain uncorrected if approved by the
Engineer, and an ALR with an IRI value greater than 190 in./mi shall require full depth
removal and replacement of the surface course of sufficient area to meet specifications.720
In addition, if there is only one ALR in any two lane mile section, then no
smoothness correction will be required if the ALR does not exceed 190 in./mi and the
overall smoothness in accordance with 401.18(d) of the two lane mile section does not
require any corrective action. A two lane mile section will start one mile before the
ALR and end one mile after the ALR in order that all two lane mile sections will have,
at most, one ALR each.
The width of the corrected area may be partial or full lane width, depending on730
the respective wheel path profiles. Underlying courses that are exposed by corrective
action shall be milled to a depth of 1 1/2 in. and replaced with surface course. After
the corrective action is taken on a surface course, the inertial profiler shall be operated
throughout the entire affected smoothness section to verify the adequacy of the
corrective action.
At locations where the 16 ft straightedge is used, the pavement variations shall be
corrected to 1/4 in. or less.
If grinding of an intermediate course is used for pavement smoothness740
corrections, the grinding shall not precede the surface placement by more than 30
calendar days if open to traffic.
Pay Factors
Pay factors, PF, are calculated for the air voids at N des , Vbe at N des and in-place
density, %Gmm. The Percent Within Limits, PWL, for each lot will be determined in
accordance with ITM 588.
750
The appropriate pay factor for each property is calculated as follows:
Estimated PWL greater than 90:
401.19
321
PF = ((0.50 x PWL) + 55.00)/100
Estimated PWL greater than 70 and equal to or less than 90:
PF = ((0.40 x PWL) + 64.00)/100
760
Estimated PWL greater than or equal to 50 and equal to or less than 70:
PF = ((0.85 x PWL) + 32.5)/100
If the Lot PWL for any one of the properties is less than 50, a sublot has an air
void content less than 1.0% or greater than 8.0%, or a sublot has a volume of effective
binder greater than 3.0% above design minimums, the lot will be referred to the
Department’s Division of Materials and Tests for adjudication as a failed material in
accordance with normal Department practice as listed in 105.03.
770
Air voids, Vbe, and in-place density, %Gmm, PF values will be reported to the
nearest 0.01. Rounding will be in accordance with 109.01(a).
A composite pay factor for each lot based on test results for mixture properties
and density is determined by a weighted formula as follows:
Lot PF = 0.30(PF VOIDS ) + 0.35(PFVbe ) + 0.35(PF DENSITY )
where:
Lot PF = Lot Composite Pay Factor for Mixture and Density
PFVOIDS = Lot Pay Factor for Air Voids at N des
PFVbe = Lot Pay Factor for Vbe at Ndes
PFDENSITY = Lot Pay Factor for In-Place Density, % Gmm
780
The lot quality assurance adjustment for mixture properties and density is
calculated as follows:
q = L x U x (Lot PF – 1.00)/MAF
where:
q = quality assurance adjustment for mixture
properties and density of the lot
L = Lot quantity
U = Unit price for the material, $/ton
Lot PF = Lot Pay Factor
Lot test results for the air voids at N des , Vbe at N des , and density will be used to
determine the Lot Pay Factors.
790
401.19
322
The specification limits for the air voids at N des , Vbe at N des , and density will be
as follows:
SPECIFICATION LIMITS
Mixture
LSL* USL**
Air Voids at Ndes , % 3.60 6.40
Volume of Effective Binder at N des , % Spec Spec +2.50
Density
LSL* USL**
Roadway Core Density (%Gmm), % 93.00 n/a
* LSL, Lower Specification Limit
** USL, Upper Specification Limit
A composite pay factor for each sublot based on test results for mixture properties
and density is determined in a weighted formula as follows:
Dense Graded Mixture:800
SCPF = 0.30(PF VOIDS ) + 0.35(PFVbe ) + 0.35(PF DENSITY )
Open Graded Mixture:
SCPF = 0.20(PF BINDER ) + 0.35(PFVOIDS ) + 0.45
where:
SCPF = Sublot Composite Pay Factor for Mixture and Density
PFBINDER = Sublot Pay Factor for Binder Content
PFVOIDS = Sublot Pay Factor for Air Voids at N des
PFVbe = Sublot Pay Factor for Vbe at N des
PFDENSITY = Sublot Pay Factor for Density
810
If the SCPF for an open graded sublot is less than 0.85 or the volume of effective
binder is greater than 3.0% above design minimums, the sublot will be referred to the
Division of Materials and Tests for adjudication as a failed material in accordance with
The sublot quality assurance adjustment for mixture properties and density is
calculated as follows:
q = L x U x (SCPF – 1.00)/MAF
where:820
401.19
323
q = quality assurance adjustment for the sublot
L = sublot quantity
U = unit price for the material $/ton
SCPF = sublot composite pay factor
Sublot test results for mixture properties will be assigned pay factors in
accordance with the following:
BINDER CONTENT
Open Graded
Deviation from DMF (±%) Pay Factor
1.05
0.3 1.04
0.4 1.02
0.5 1.00
0.6 0.90
0.7 0.80
0.8 0.60
0.9 0.30
1.0 0.00
>1.0 Submitted to the Division
of Materials and Tests*
* Test results will be considered and adjudicated as a failed material
in accordance with normal Department practice as listed in 105.03.
VOLUME OF EFFECTIVE BINDER, Vbe
Dense Graded
Pay FactorsDeviation from
Spec Minimum
> +3.0 Submitted to the Division of Materials and Tests*
DQG 1.00 - 0.05 for each 0.1% above +2.5%
> +2.0 and < +2.5 1.05 - 0.01 for each 0.1% above +2.0%
> +0.5 and < +2.0 1.05
DQG 1.05 - 0.01 for each 0.1% below +0.5%
-0.5 and < 0.0 1.00 - 0.02 for each 0.1% below 0.0%
-2.0 and < -0.5 0.90 - 0.06 for each 0.1% below -0.5%
< -2.0 Submitted to the Division of Materials and Tests*
* Test results will be considered and adjudicated as a failed material in accordance
with normal Department practice as listed in 105.03.
401.19
324
AIR VOIDS
Dense Graded Open Graded Pay Factor
Deviation from Spec (±%) Deviation** (±%)
3.0 1.05
!DQG7 > 3DQG4.0 1.00
4.1 0.98
1.8 4.2 0.96
4.3 0.94
4.4 0.92
1.9 4.5 0.90
2.0 4.6 0.84
4.7 0.78
4.8 0.72
4.9 0.66
5.0 0.60
> 2.0 > 5.0 Submitted to the Division
of Materials and Tests*
* Test results will be considered and adjudicated as a failed material in
accordance with normal Department practice as listed in 105.03.
** Deviation shall be from 17.5% for OG25.0 mm and OG19.0 mm mixtures and
shall be from 14.5% for OG9.5 mm mixtures.
830
For mixtures produced during a plant’s adjustment period, pay factors based on
the DMF with the above tolerances will be used to compute quality assurance
adjustments.
Sublot test results for density will be assigned pay factors in accordance with the
following:
DENSITY
Percentages are based
on %MSG Pay Factors, %
Dense Graded
8.0 Submitted to the Division of Materials and Tests*
97.0 - 97.9 1.00
96.6 - 96.9 1.05 - 0.01 for each 0.1% above 96.5
95.0 - 96.5 1.05
94.1 - 94.9 1.00 + 0.005 for each 0.1% above 94.0
93.0 - 94.0 1.00
92.0 - 92.9 1.00 - 0.005 for each 0.1% below 93.0
91.0 - 91.9 0.95 - 0.010 for each 0.1% below 92.0
90.0 - 90.9 0.85 - 0.030 for each 0.1% below 91.0
9.9 Submitted to the Division of Materials and Tests*
* Test results will be considered and adjudicated as a failed material in
accordance with normal Department practice as listed in 105.03.
401.19
325
The pay factors will be rounded to the nearest 0.01.
Smoothness pay adjustments will only be applied when the smoothness is
measured by an inertial profiler in accordance with 401.18(a).
The Mean Roughness Index, MRI, will be determined utilizing a fixed interval
for each lane for each 0.1 mile section of paving. The MRI for a 0.1 mile section will
be the average of the IRI of the two wheel paths. Categorized segments shall be as
follows:
opportunity to achieve a smooth ride or asphalt pavement on an850
interstate with a single opportunity or more. The following
operations, if performed on the contract, will be considered
opportunities.
layer is an opportunity. Wedge and level will not be
considered an opportunity.
opportunity prior to placing base, intermediate, or860
surface HMA.
under Type A.
At locations where an inertial profiler is used to accept smoothness, a quality
assurance adjustment will be determined for each lane. This adjustment will be applied
to all QC/QA HMA pay items within the pavement section. The adjustment will be
calculated using the following formula:
870
where:
q s = quality assurance adjustment for smoothness for one section
PFs = pay factor for smoothness
n = number of layers
A = area of the section, sq yd
S = planned spread rate for material, lb/sq yd
T = conversion factor: 2,000 lb/ton
U = unit price for the material, $/ton.
401.19
326
The quality assurance adjustment for smoothness, Qs, for the contract will be the
total of the quality assurance adjustments for smoothness, qs, on each section by the
following formula:
Q s Ts
When smoothness is measured by an inertial profiler, payment adjustments will880
be made for any 0.1 mile section based on initial MRI generated on the surface course
only and in accordance with the following table. Smoothness correction, if required,
shall be in accordance with 401.18(e). The MRI pay factors for smoothness will be
determined prior to any required smoothness correction.
PAY FACTORS FOR SMOOTHNESS
Posted Speed greater than 45 mph
MRI, in./mi. Pay Factor, PF
over 0 to 35 1.06
over 35 to 40 1.05
over 40 to 45 1.04
over 45 to 50 1.03
over 50 to 55 1.02
over 55 to 60 1.01
over 60 to 70 1.00
over 70 to 75 0.99
over 75 to 80 0.98
over 80 to 85 0.96
over 85 to 90 0.95
over 90
For Type A, PFs will be 0.95
and the section shall be
corrected to 70 or less.
over 90 to 110
For Type B, PFs will be 0.95
and the section does not
require correction.
over 110
For Type B, PFs will be 0.95
and the section shall be
corrected to 90 or less.
401.20Appeals
If the QC test results do not agree with the acceptance test results in a sublot, a
request, along with a comparison of the QC and acceptance test results, may be made
in writing for additional testing of that sublot. The appeal sample will be analyzed in
401.20
327
a lab different than the lab that analyzed the original sample at the discretion of the
Engineer.
The Contractor may appeal an individual sublot for the binder content, the MSG,
the BSG of the gyratory specimens, or the BSG of the density cores when the QC
results are greater than one standard deviation from the acceptance test results as
follows: 0.25 for binder content, 0.010 for the MSG and BSG of the gyratory900
specimens, and 0.020 for the BSG of the density cores.
Upon request from the Contractor, the BSG of the density core may be exempted
from the individual sublot appeal if both the QC and QA results show a %MSG for
the density greater than or equal to 93.0%.
A $500.00 credit adjustment will be included in a quality adjustment pay item in
accordance with 109.05.1(d) for each appealed sublot that did not result in an
improvement to the SCPF or Lot PF.
910
A written request for an appeal shall be submitted within seven calendar days of
receipt of the Department’s written results for the lot accepted under 401.19(a) or the
sublot accepted under 401.19(b). The conditions for an extended lot appeal are as
follows:
Contractor informs the Department of the anticipated extended
lot condition within seven calendar days of receipt of the lot
results, or
920
Contractor did not inform the Department of the anticipated
extended lot condition within seven calendar days of receipt of
the lot results.
The backup sample will be tested in accordance with the applicable test method
for the sublot requested for all tests exceeding the sublot standard deviation criteria.
The backup MSG will be dried in accordance with ITM 572 and mass determined930
in water in accordance with AASHTO T 209.
New gyratory specimens will be prepared and tested in accordance with AASHTO
T 312 from the backup sample.
The backup binder content sample will be prepared and tested in accordance with
ITM 571.
940
401.20
328
Additional cores shall be taken within seven calendar days unless otherwise
directed. Additional core locations will be determined by adding 1 ft longitudinally of
the cores tested using the same transverse offset. The appeal density cores will be dried
in accordance with ITM 572 and tested in accordance with AASHTO T 166, Method
A or AASHTO T 331, if required.
The appeal results will replace all previous test result for acceptance of mixture
in accordance with 401.09 and density in accordance with 401.16. The results will be
furnished to the Contractor.950
The Department will perform annual Quality Assurance reviews of a portion of
each Contractor’s MRI results in accordance with ITM 917. The Contractor’s results
will be compared to the Department’s. The Department will notify the Contractor of
unacceptable results in a timely manner. The Department will allow an appeal period
of 14 days during which time the Contractor shall submit a written request and appeal
results for Department review. If the Contractor’s appeal results do not agree with the
Department’s results, the Contractor shall be required to perform a side-by-side
evaluation. The Department’s results will be utilized for smoothness payment in place960
of the Contractor’s results unless the Contractor’s appeal results are determined to be
acceptable for payment. Sections where corrective action has taken place prior to the
Department’s data collection will utilize the Contractor’s initial results prior to
corrective action for payment.
401.21Method of Measurement
HMA mixtures will be measured by the ton of the type specified, in accordance
with 109.01(b). The measured quantity will be divided by the MAF to determine the
pay quantity.
970
Milled shoulder corrugations will be measured in accordance with 606.02.
Joint adhesive will be measured by the linear foot in accordance with 109.01(a).
Liquid asphalt sealant will be measured by the linear foot.
401.22Basis of Payment
The accepted quantities for this work will be paid for at the contract unit price per
ton for QC/QA-HMA, of the type specified, complete in place.
Payment for furnishing, calibrating, operating the inertial profiler, and furnishing980
IRI profile information will be made at the contract lump sum price for Inertial
Profiler, HMA.
Furnishing and operating the 16 ft straightedge shall be included in the cost of
other pay items within this section.
401.21
329
Adjustments to the contract payment with respect to mixture, density, and
smoothness for the mixture produced will be included in a quality adjustment pay item
in accordance with 109.05.1.
990
Milled shoulder corrugations will be paid for in accordance with 606.03.
Joint adhesive will be paid for at the contract unit price per linear foot, complete
in place. Liquid asphalt sealant will be paid for at the contract unit price per linear foot.
Payment will be made under:
Pay Item Pay Unit Symbol
Inertial Profiler, HMA ............................................................... LS1000
Joint Adhesive, __________ ..................................................... LFT
course type
Liquid Asphalt Sealant .............................................................. LFT
QC/QA-HMA, ______, ______, ______, ______mm .............. TON
(ESAL (1) ) (PG (2) ) (Course (3) ) (Mix (4) )
(1) ESAL Category as defined in 401.04
(2) Number represents the high temperature binder grade. Low
temperature grades are - 22
(3) Surface, Intermediate, or Base
(4) Mixture Designation1010
Preparation of surfaces to be overlaid shall be included in the cost of other pay
items.
Coring and refilling of the core holes shall be included in the cost of other pay
items within this section.
No payment will be made for additional anti-stripping additives, appeal coring, or
traffic control expenditures related to coring operations.
1020
The cost of removing and replacing soft and yielding areas shall be included in
the cost of other pay items in this section.
Corrections for pavement smoothness shall be included in the cost of other pay
items within this section.
The price for Inertial Profiler, HMA will be full compensation regardless of how
often the inertial profiler is used or how often the IRI is determined.
If QC/QA-HMA 19.0 mm over QC/QA-HMA 25.0 mm mixtures are specified,1030
QC/QA-HMA 19.0 mm mixture may be considered as a substitute for the QC/QA-
HMA 19.0 mm and QC/QA-HMA 25.0 mm mixtures upon a written request by the
Contractor. The request for the substitution shall be prepared in advance of the work.
401.22
330
A computation will be made in order to obtain a unit price for the QC/QA-HMA 19.0
mm mixture. The quantity and amount for QC/QA-HMA 19.0 mm mixture shall equal
the sum of the contract quantities and amounts shown for QC/QA-HMA 19.0 mm and
QC/QA-HMA 25.0 mm mixtures. The unit price for QC/QA-HMA 19.0 mm mixture
shall be equal to the sum of contract amounts divided by the sum of contract quantities.
Payment for the QC/QA-HMA 19.0 mm mixture will be made at the unit price per ton
for QC/QA-HMA 19.0 mm mixture. No payment will be made for additional work or1040
costs which may result due to this change.