Home / Calculators / Building Permit Fee Calculator

Aurora, Colorado Building Permit Cost Calculator

Estimates permit cost in Aurora from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single family home, Group R-3, per square foot
Flat fee $1.30
$1.30
○Single family home, Group R-3, minimum fee
Flat fee $2,000.00
$2,000.00
○New 2,400 sq ft single family home (2,400 x $1.30)
Flat fee $3,120.00
$3,120.00
○R-3 master plan, flat fee
Flat fee $2,655.00
$2,655.00
○Apartments or dorms, Group R-2, per square foot
Flat fee $0.76
$0.76
○Commercial garages and misc. structures, Group U, per square foot
Flat fee $3.40
$3.40
○Storage uses, Group S, minimum fee
Flat fee $3,500.00
$3,500.00
How this jurisdiction calculates the fee

Aurora prices new building construction on floor area rather than on valuation. The 2026 New Building Construction Fees table, Form A#176 revised January 2026, sets a single fee per square foot by occupancy group together with a minimum fee, and that one fee covers plan reviews, department referrals and permit issuance. Single family homes in Group R-3 are $1.30 per square foot with a $2,000 minimum, apartments and dorms in Group R-2 are 76 cents per square foot with a $5,000 minimum, and commercial garages and miscellaneous structures in Group U are $3.40 per square foot with a $2,000 minimum. Master plans are flat, at $2,655 for R-3 and $5,733 for R-2. Schools in Group E show state fees rather than a city amount. Two quirks are reproduced as printed: storage uses in Group S carry the lowest rate at 28 cents per square foot yet a $3,500 minimum, higher than the minimum for a single family home, and the R-2 and S rates are spelled out in cents while every other row uses dollars. City use tax based on materials cost is collected separately, and some projects carry extra parks or capital impact charges. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The New Building Construction Fees form re-read in full; it is headed "2026 NEW BUILDING CONSTRUCTION FEES" and footed "New Building Construction Fees (Revised 01/2026), Form A#176", and every stored figure re-reads verbatim, including the $2,000 R-3 minimum, the $1.30 per square foot R-3 rate (so $3,120 on 2,400 square feet is arithmetically correct), the $2,655 R-3 master plan flat fee and the $3,500 Group S minimum. METHOD NOTE: this form prints the two sub-dollar rates as words, "76 cents" for R-2 Apartments/Dorms and "28 cents" for Group S Storage, not as $0.76 and $0.28, so a dollar-sign matcher reports a false absence on both. No supersession.

Source: published fee schedule · Verified 11/12/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single family residential deck, flat rate
Flat fee $402.00
$402.00
○Single family residential patio cover, flat rate
Flat fee $402.00
$402.00
Deck 30 inches or less above grade and not attached to the house
No permit required
see rule
How this jurisdiction calculates the fee

A single family residential deck is a flat rate permit at $402. Aurora 2026 flat rate schedule, Form #A175 revised August 2026, charges the same fee for the same project type regardless of size or cost, and it groups the single family residential deck at $402 alongside demolition of a full or partial building, commercial signs and a single family residential patio cover. A permit is always required for a deck that rises over 30 inches above the ground, and is also required for a lower deck when it is attached to the house; a plan submittal is required either way and a framing inspection follows. The flat fee does not change city use tax, so building material costs must still be reported so the city can estimate city use and county taxes. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/13/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential electrical service upgrade
Flat fee $190.00
$190.00
○Residential EV charger
Flat fee $99.00
$99.00
○Energy storage system
Flat fee $191.00
$191.00
○Residential solar PV system
Flat fee $500.00
$500.00
○Commercial solar PV system
Flat fee $1,000.00
$1,000.00
Replacing an existing outlet, switch or light fixture
No permit required
see rule
How this jurisdiction calculates the fee

Aurora charges flat rate electrical permits rather than pricing by circuit or ampere. Under the 2026 flat rate schedule, Form #A175 revised August 2026, a residential electrical service upgrade is $190, a residential electric vehicle charger is $99, an energy storage system is $191 and a residential solar photovoltaic system is $500, with a commercial solar photovoltaic system at $1,000. An electrical service change always requires a permit. For other modifications to the electrical system the city asks that the Building Division be contacted with project information, and a plan submittal is required for those. Replacing light fixtures, switches, outlets, smoke detectors and carbon monoxide detectors does not require a permit unless a new device is being added where none existed before. The flat fee has no effect on city use tax, which is figured separately from materials cost. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/12/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New or replacement residential fence within the height exemption
No permit required
see rule
Dedicated fence permit fee
None published
see rule
How this jurisdiction calculates the fee

Aurora publishes no fence permit fee, because ordinary residential fences need no permit. The city reports that an ordinance change removed the permit requirement for fences seven feet tall or less, for both new and replacement fences, and identifies the fence ordinance as 146-1711. Fences must still meet city code on construction, location and materials, and zoning setbacks still apply, so questions go to Planning and Development Services rather than the Building Division. Two statements inside the city own Do It Right home improvement handbook disagree at exactly seven feet: the narrative exempts fences seven feet tall or less, while the permit table exempts fences less than seven feet in height. Both are reproduced here as published. A fence above the exemption appears on neither the flat rate schedule nor the new building construction table, so the Permit Center quotes it from the project. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/12/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single family residential roof replacement
Flat fee $350.00
$350.00
○Residential roof and siding replacement together
Flat fee $424.00
$424.00
○Residential siding replacement alone
Flat fee $99.00
$99.00
○Commercial roof replacement
Flat fee $650.00
$650.00
How this jurisdiction calculates the fee

A single family residential roof replacement is a flat rate permit at $350 under Aurora 2026 flat rate schedule, Form #A175 revised August 2026. Bundling work changes the price: residential roof and siding replacement together is $424, while residential siding replacement alone is $99. Commercial roof replacement is $650. A permit is always required for a roof replacement and no plan submittal is needed, with a roofing inspection to follow. Roof repairs also require a permit unless the city considers the work minor repair work. The flat fee process does not affect city use tax, so building material costs must still be provided so the city can estimate city use and county taxes. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/13/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Dedicated retaining wall permit fee
None published
see rule
Retaining wall permit and plan submittal
Always required
see rule
How this jurisdiction calculates the fee

Aurora publishes no flat rate retaining wall permit fee. The city home improvement handbook lists retaining walls as always requiring both a permit and a plan submittal, with a framing inspection, and separately notes that landscaping needs no permit unless retaining walls are being installed or the site is being re-graded. Landscape walls run on a different track: they require a permit and a public improvement inspection rather than a building inspection. Because retaining walls appear on neither the flat rate schedule nor the new building construction table, the fee is quoted from the individual project. The city states that permit costs consist of permit fees, plan review fees and applicable city and county taxes, and that the amount varies with the complexity of the plan review, the inspections required and the valuation of the project. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/12/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Unattached storage shed under 120 sq ft
No permit required
see rule
Dedicated shed permit fee
None published
see rule
○Group U comm. garages and misc. structures, per square foot
Flat fee $3.40
$3.40
○Group U minimum fee
Flat fee $2,000.00
$2,000.00
How this jurisdiction calculates the fee

Aurora publishes no flat rate shed permit fee. A building permit is required to build a shed larger than 120 square feet of floor area; a smaller shed needs no building permit but must still satisfy the city zoning rules on where it may sit on the lot. The city permit table repeats that same 120 square foot threshold for unattached storage sheds and for gazebos, and exempts playhouses only while they stay under 120 square feet and one story tall. Sheds are named on neither the flat rate schedule nor the new building construction table, whose Group U row covers commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum fee. With no shed specific figure published, the Permit Center quotes the fee from the project valuation and plan review complexity. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/12/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water heater replacement
Flat fee $99.00
$99.00
○Tankless water heater
Flat fee $287.00
$287.00
○Furnace and water heater replacement
Flat fee $292.00
$292.00
○Furnace, air conditioner and water heater replacement
Flat fee $336.00
$336.00
How this jurisdiction calculates the fee

A water heater replacement is a flat rate permit at $99 under Aurora 2026 flat rate schedule, Form #A175 revised August 2026. A tankless water heater is $287. Combination jobs are priced as their own project types rather than added together: a furnace and water heater replacement is $292, and a furnace, air conditioner and water heater replacement is $336. A permit is always required for a water heater replacement and no plan submittal is needed, with plumbing and electrical inspections following. A homeowner may pull the permit and do the work in their own primary home; hired contractors must hold a city of Aurora license. The flat fee has no effect on the calculation of city use tax, which is based separately on materials cost. Re-verified 2026-09-14 from the cited documents, both of which are current city forms: the flat rate schedule is Form #A175, "2026 FLAT RATE FEE PERMITS", footer "Flat-Rate Fee (Revised 08/2026)", and the new building construction table is Form A#176, "2026 NEW BUILDING CONSTRUCTION FEES", footer "New Building Construction Fees (Revised 01/2026)". Every stored flat rate was confirmed against its own bullet, including $99 water heater replacement, $190 residential electrical service upgrade, $191 energy storage system, $287 tankless water heater, $292 furnace and water heater replacement, $336 rooftop unit and furnace/AC/water heater replacement, $350 single family residential roof replacement, $402 single family residential deck, $424 residential roof and siding replacement, $500 residential solar PV and $1000 commercial solar PV, plus $650 commercial roof replacement; and from the construction table R-3 single family homes at $1.30 per square foot with a $2,000 minimum and U utility, commercial garages and miscellaneous structures at $3.40 per square foot with a $2,000 minimum. METHOD NOTE: both forms print amounts without cents ($99, not $99.00), so a cents-exact search reports them absent. The Do It Right handbook is an image-only 28 page PDF that yields no pdftotext output; OCR at 200 dpi with tesseract --psm 4 read the narrative and confirmed verbatim that "An ordinance change several years ago eliminated the requirement of a fence permit for the installation of fences that are seven feet tall or less. This applies to both new and replacement fences." The handbook permit TABLE is set rotated and did not OCR legibly, so the seven-foot discrepancy this row records between the narrative and that table could not be re-read this pass and is carried forward as previously published; what was independently re-confirmed is that neither fences above the exemption nor retaining walls appear on the flat rate schedule or the new building construction table, which is why those fees are quoted per project.

Source: published fee schedule · Verified 11/13/2026

See the full write-up: Aurora building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.