B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Atlanta, Georgia Building Permit Cost Calculator

Estimates permit cost in Atlanta from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building Permit ($7 per $1,000 of Cost of Construction)
$7.00 x 250 = $1,750.00
$1,750.00
○Building Permit minimum fee
Flat fee $150.00
$150.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
○Permit Extension (each)
Flat fee $110.00
$110.00
○Change of Contractor/Record Change (each)
Flat fee $50.00
$50.00
○Certificate of Occupancy: One (1) & Two (2) Family Residence - New Construction
Flat fee $100.00
$100.00
○Certificate of Occupancy: One (1) & Two (2) Family Residence - Additions
Flat fee $50.00
$50.00
○Demolition: One (1) & Two (2) Family Residence
Flat fee $650.00
$650.00
How this jurisdiction calculates the fee

Building permit fees are charged on the cost of construction, with a flat technology fee added to every permit. 2026-09-17 (lane B run 1390, pipeline run 94): the cited ZD&P page was re-read in full today (atlantaga.gov 403s a plain client and returned 200 to a cookie-jar + same-origin-Referer retry) and every stored figure verifies verbatim. ONE LIVE CHANGE NOTED THAT IS NOT A FEE CHANGE: the page now carries a Customer Notice reading "Effective Monday, September 14, 2026, credit card processing fees will no longer be absorbed by the City of Atlanta. Instead, these fees will be charged directly to the customer at the time of payment", with check, eCheck and ACH named as fee-free alternatives. The city publishes no rate for that surcharge, so nothing is stored for it; it is recorded here because an applicant paying by card now pays more than the published permit fee.

Source: published fee schedule · Verified 9/17/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○One (1) & Two (2) Family Residence - Deck / Balcony / Porch / Screened Porch, building valuation rate
$35.00 x 2,000 = $70,000.00
$70,000.00
○Building Permit ($7 per $1,000 of Cost of Construction)
$7.00 x 250 = $1,750.00
$1,750.00
○Building Permit minimum fee
Flat fee $150.00
$150.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

A deck, balcony, porch, or screened porch at a one- or two-family residence is valued using the published per-square-foot rate in the addendum to Table 100, and the building permit fee is then calculated on that cost of construction, plus the technology fee. 2026-09-17 (lane B run 1390, pipeline run 94): the cited ZD&P page was re-read in full today (atlantaga.gov 403s a plain client and returned 200 to a cookie-jar + same-origin-Referer retry) and every stored figure verifies verbatim. ONE LIVE CHANGE NOTED THAT IS NOT A FEE CHANGE: the page now carries a Customer Notice reading "Effective Monday, September 14, 2026, credit card processing fees will no longer be absorbed by the City of Atlanta. Instead, these fees will be charged directly to the customer at the time of payment", with check, eCheck and ACH named as fee-free alternatives. The city publishes no rate for that surcharge, so nothing is stored for it; it is recorded here because an applicant paying by card now pays more than the published permit fee.

Source: published fee schedule · Verified 9/17/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical Permit, base fee
Flat fee $150.00
$150.00
○Electrical Permit, minimum fee amount
Flat fee $75.00
$75.00
○Temporary Power Permit, base fee
Flat fee $150.00
$150.00
○Temporary Power Permit, minimum fee amount
Flat fee $175.00
$175.00
○Public Utility Permit, base fee
Flat fee $50.00
$50.00
○Public Utility Permit, minimum fee amount
Flat fee $75.00
$75.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Electrical permits carry a published base fee with a separate minimum fee amount, plus the technology fee applied to each permit. Additional fees for trade permits apply based on project scope. 2026-09-17 (lane B run 1390, pipeline run 94): the cited ZD&P page was re-read in full today (atlantaga.gov 403s a plain client and returned 200 to a cookie-jar + same-origin-Referer retry) and every stored figure verifies verbatim. ONE LIVE CHANGE NOTED THAT IS NOT A FEE CHANGE: the page now carries a Customer Notice reading "Effective Monday, September 14, 2026, credit card processing fees will no longer be absorbed by the City of Atlanta. Instead, these fees will be charged directly to the customer at the time of payment", with check, eCheck and ACH named as fee-free alternatives. The city publishes no rate for that surcharge, so nothing is stored for it; it is recorded here because an applicant paying by card now pays more than the published permit fee.

Source: published fee schedule · Verified 9/17/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fences: 6 feet or less
Flat fee $75.00
$75.00
○Fences: Over 6 feet
Flat fee $120.00
$120.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Fence permits are charged as a flat fee set by fence height, plus the technology fee applied to each permit.

Source: published fee schedule · Verified 9/17/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○One (1) & Two (2) Family Residence-Roofing or Re-roofing
Flat fee $360.00
$360.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Roofing or re-roofing at a one- or two-family residence is charged as a flat permit fee, plus the technology fee applied to each permit. 2026-09-17 (lane B run 1390, pipeline run 94): the cited ZD&P page was re-read in full today (atlantaga.gov 403s a plain client and returned 200 to a cookie-jar + same-origin-Referer retry) and every stored figure verifies verbatim. ONE LIVE CHANGE NOTED THAT IS NOT A FEE CHANGE: the page now carries a Customer Notice reading "Effective Monday, September 14, 2026, credit card processing fees will no longer be absorbed by the City of Atlanta. Instead, these fees will be charged directly to the customer at the time of payment", with check, eCheck and ACH named as fee-free alternatives. The city publishes no rate for that surcharge, so nothing is stored for it; it is recorded here because an applicant paying by card now pays more than the published permit fee.

Source: published fee schedule · Verified 9/17/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Retaining Wall
Flat fee $220.00
$220.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Retaining walls are charged as a flat permit fee, plus the technology fee applied to each permit.

Source: published fee schedule · Verified 9/18/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○One (1) & Two (2) Family Online Permit: Remove & Replace Hot Water Tank
Flat fee $50.00
$50.00
○Hot Water Tank - Remove and Replace (ONLY) for One- & Two-Family Residence, base fee
Flat fee $50.00
$50.00
○Hot Water Tank - Remove and Replace (ONLY) for One- & Two-Family Residence, minimum fee amount
Flat fee $175.00
$175.00
○Plumbing Permit, base fee
Flat fee $150.00
$150.00
○Plumbing Permit, minimum fee amount
Flat fee $175.00
$175.00
○Technology Fee (per permit)
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Removing and replacing a hot water tank at a one- or two-family residence is charged under a dedicated line in the fee schedule, plus the technology fee applied to each permit. The published schedule lists this work in two places, as a flat charge in the general fees table and as a base fee with a separate minimum fee amount in the trade permit table. 2026-09-17 (lane B run 1390, pipeline run 94): the cited ZD&P page was re-read in full today (atlantaga.gov 403s a plain client and returned 200 to a cookie-jar + same-origin-Referer retry) and every stored figure verifies verbatim. ONE LIVE CHANGE NOTED THAT IS NOT A FEE CHANGE: the page now carries a Customer Notice reading "Effective Monday, September 14, 2026, credit card processing fees will no longer be absorbed by the City of Atlanta. Instead, these fees will be charged directly to the customer at the time of payment", with check, eCheck and ACH named as fee-free alternatives. The city publishes no rate for that surcharge, so nothing is stored for it; it is recorded here because an applicant paying by card now pays more than the published permit fee.

Source: published fee schedule · Verified 9/17/2026