Louisville, Kentucky Building Permit Cost Calculator
Estimates permit cost in Louisville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Residential - 1 & 2 Family, per square foot $.105 | see rule |
Residential - other, per square foot $.15 | see rule |
Utility; miscellaneous, per square foot $.13 | see rule |
Storage, per square foot $.14 | see rule |
Business, per square foot $.15 | see rule |
Mercantile, per square foot $.15 | see rule |
Assembly, per square foot $.16 | see rule |
○Minimum building permit fee Flat fee $75.00 | $75.00 |
○Partial alterations, structures other than buildings, or work where square footage cannot be calculated $50.00 base plus $2.50 x 250 = $675.00 | $675.00 |
○“Foundation only” permit, single family dwellings and their accessory structures Flat fee $75.00 | $75.00 |
○“Foundation only” permit, all other uses Flat fee $125.00 | $125.00 |
Plan review where no building permit is issued, or a refund is requested $30 minimum, or one third (1/3) the normal permit fee, whichever is higher | see rule |
○Certificate of Use and Occupancy with no associated building permit Flat fee $75.00 | $75.00 |
○Reactivating an expired permit within 180 days of expiration Flat fee $35.00 | $35.00 |
How this jurisdiction calculates the fee
Fees for new construction, additions, complete alterations of an entire building, tents and other temporary structures, and changes to the Kentucky Building Code use group are calculated from the square footage of every floor, including finished portions of basements, measured to the outside of the exterior walls, at a rate set by occupancy type. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM. All fourteen stored figures read off the cited promulgated fee schedule, footed "Revised 2/6/2024" on every page, including the full occupancy-rate table ($.16 Assembly, $.15 Business, $.15 Mercantile, $.105 Residential 1 & 2 Family, $.15 Residential other, $.14 Storage, $.13 Utility), the $75 minimum, the $50 plus $2.50 per $1,000 partial-alteration rule, the $75/$125 foundation-only pair, the "$30 or one third (1/3) the normal permit fee, whichever is higher" plan review floor, the $75 Certificate of Use and Occupancy and the $35 permit extension. louisvilleky.gov's department pages 403 every client, so no successor hunt could be run against the index; the document itself shows no newer revision.
Source: published fee schedule · Verified 10/23/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee (governs typical residential decks) Flat fee $75.00 | $75.00 |
○Estimated-cost method base fee for structures other than buildings Flat fee $50.00 | $50.00 |
○Estimated-cost method, added per $1,000 of estimated cost Flat fee $2.50 | $2.50 |
○Residential 1 & 2 Family square-foot rate, per sq ft Flat fee $0.11 | $0.11 |
○Plan review fee minimum (greater of this or 1/3 of permit fee) Flat fee $30.00 | $30.00 |
How this jurisdiction calculates the fee
Louisville/Jefferson County Metro building permit fees are promulgated by the Director of Codes & Regulations under Louisville Metro Code of Ordinances Sec. 150.096 (schedule revised 2/6/2024). There is no deck-specific line item. New construction, additions and complete alterations of an entire building are priced per square foot by Kentucky Building Code occupancy ($0.105/sq ft for Residential 1 & 2 Family). Partial alterations, structures other than buildings, and work whose square footage cannot be calculated are priced at $50 plus $2.50 per $1,000 of applicant-submitted estimated cost verified by the Department. No building permit fee may be less than $75, which is what a typical residential deck lands on. A plan review fee of the greater of $30 or one-third the normal permit fee applies to applications reviewed without issuance of a permit and to refund requests. A permit is required for attached decks and porches, and for freestanding decks over 200 sq ft, more than 30 inches above grade, or connecting to the house near the front door.
Source: published fee schedule · Verified 11/2/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Initial installation of electrical wiring in a one- or two-family residence, including three inspections Flat fee $200.00 | $200.00 |
Initial installation of electrical wiring in a condominium or patio home residence or unit, including three inspections $150 for the base permit, plus $.25 for each ampere at the service entrance up to and including 600 amperes and $.50 for each ampere over 600 amperes | see rule |
○Service upgrade, new service, repairs or additional wiring in a one- or two-family, condominium or patio home residence, work costing $750 or less, including one inspection Flat fee $75.00 | $75.00 |
○Service upgrade, new service, repairs or additional wiring in a one- or two-family, condominium or patio home residence, work costing over $750, including one inspection Flat fee $100.00 | $100.00 |
○Burnout repair on a service, work costing $750 or less, including one inspection Flat fee $75.00 | $75.00 |
○Burnout repair on a service, work costing over $750, including one inspection Flat fee $100.00 | $100.00 |
○Temporary pole, including one inspection Flat fee $85.00 | $85.00 |
○Each additional inspection not covered by the initial permit fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Electrical permit fees are set by the type of work and the class of building, and each permit covers a stated number of inspections at no additional cost.
Source: published fee schedule · Verified 11/10/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee (effective fence permit price) Flat fee $75.00 | $75.00 |
○Estimated-cost method base fee for structures other than buildings Flat fee $50.00 | $50.00 |
○Estimated-cost method, added per $1,000 of estimated cost Flat fee $2.50 | $2.50 |
○Plan review fee minimum (greater of this or 1/3 of permit fee) Flat fee $30.00 | $30.00 |
How this jurisdiction calculates the fee
Louisville/Jefferson County Metro building permit fees are promulgated by the Director of Codes & Regulations under Louisville Metro Code of Ordinances Sec. 150.096 (schedule revised 2/6/2024). A building permit is required for fences over 7 feet tall. The schedule has no fence line item; a fence is a structure other than a building, so its fee is calculated at $50 plus $2.50 per $1,000 of applicant-submitted estimated cost verified by the Department, subject to the rule that no building permit fee may be less than $75 - which is the effective price for essentially any residential fence. A plan review fee of the greater of $30 or one-third the normal permit fee applies to applications reviewed without issuance of a permit and to refund requests.
Source: published fee schedule · Verified 11/2/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee (applies when structural roof work triggers a permit) Flat fee $75.00 | $75.00 |
○Partial-alteration method base fee Flat fee $50.00 | $50.00 |
○Partial-alteration method, added per $1,000 of estimated cost Flat fee $2.50 | $2.50 |
○Plan review fee minimum (greater of this or 1/3 of permit fee) Flat fee $30.00 | $30.00 |
How this jurisdiction calculates the fee
Louisville/Jefferson County Metro building permit fees are promulgated by the Director of Codes & Regulations under Louisville Metro Code of Ordinances Sec. 150.096 (schedule revised 2/6/2024). Reroofing generally does not require a building permit in Louisville Metro; a permit is required only when structural roof components such as the roof deck or rafters are being replaced. The schedule has no roofing line item - such work is a partial alteration, priced at $50 plus $2.50 per $1,000 of applicant-submitted estimated cost verified by the Department, and no building permit fee may be less than $75. A plan review fee of the greater of $30 or one-third the normal permit fee applies to applications reviewed without issuance of a permit and to refund requests.
Source: published fee schedule · Verified 11/2/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee Flat fee $75.00 | $75.00 |
○Estimated-cost method base fee for structures other than buildings Flat fee $50.00 | $50.00 |
○Estimated-cost method, added per $1,000 of estimated cost Flat fee $2.50 | $2.50 |
○Plan review fee minimum (greater of this or 1/3 of permit fee) Flat fee $30.00 | $30.00 |
How this jurisdiction calculates the fee
Louisville/Jefferson County Metro building permit fees are promulgated by the Director of Codes & Regulations under Louisville Metro Code of Ordinances Sec. 150.096 (schedule revised 2/6/2024). A building permit is required for retaining walls over 4 feet tall. The schedule has no retaining-wall line item; a retaining wall is a structure other than a building, so its fee is $50 plus $2.50 per $1,000 of applicant-submitted estimated cost verified by the Department, subject to the rule that no building permit fee may be less than $75. On that formula the $75 minimum governs until estimated cost exceeds roughly $10,000. A plan review fee of the greater of $30 or one-third the normal permit fee applies to applications reviewed without issuance of a permit and to refund requests.
Source: published fee schedule · Verified 11/2/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee (effective shed permit price) Flat fee $75.00 | $75.00 |
○Utility/miscellaneous occupancy rate, per sq ft Flat fee $0.13 | $0.13 |
○Residential 1 & 2 Family occupancy rate, per sq ft Flat fee $0.11 | $0.11 |
○Foundation-only permit, single-family dwelling and its accessory structures Flat fee $75.00 | $75.00 |
○Plan review fee minimum (greater of this or 1/3 of permit fee) Flat fee $30.00 | $30.00 |
How this jurisdiction calculates the fee
Louisville/Jefferson County Metro building permit fees are promulgated by the Director of Codes & Regulations under Louisville Metro Code of Ordinances Sec. 150.096 (schedule revised 2/6/2024). One-story detached accessory storage sheds of 200 square feet or less are exempt from a building permit; a larger shed needs one. The schedule has no shed line item - the fee is the per-square-foot rate for the Kentucky Building Code occupancy the Department assigns, with the Utility/miscellaneous rate at $0.13/sq ft and Residential 1 & 2 Family at $0.105/sq ft. Either rate leaves a typical shed below the rule that no building permit fee may be less than $75, so $75 is the effective price. A foundation-only permit for a single-family dwelling accessory structure is $75. A plan review fee of the greater of $30 or one-third the normal permit fee applies to applications reviewed without issuance of a permit and to refund requests.
Source: published fee schedule · Verified 11/2/2026
See the full write-up: Louisville building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.