Minneapolis, Minnesota Building Permit Cost Calculator
Estimates permit cost in Minneapolis from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum fee - residential or commercial Flat fee $84.20 | $84.20 |
○Construction value $1.00 - $500.00 Flat fee $36.70 | $36.70 |
Construction value $501.00 - $2,000.00 $36.70 - first $500. Plus $4.50 each add'l $100.00 And fraction thereof including $2,000. | see rule |
Construction value $2,001.00 - $25,000.00 $104.20 - first $2,000.00 Plus $20.60 each add'l $1,000.00 And fraction thereof including $25,000. | see rule |
Construction value $25,001.00 - $50,000.00 $578.00 - first $25,000 Plus $14.90 each add'l $1,000.00 And fraction thereof including $50,000. | see rule |
Construction value $50,001.00 - $100,000.00 $950.50 - first $50,000. Plus $10.60 each add'l $1,000.00 And fraction thereof including $100,000. | see rule |
Construction value $100,001.00 - $500,000.00 $1,480.50 - first $100,000. Plus $8.40 each add'l $1,000.00 And fraction thereof including $500,000. | see rule |
Construction value $500,001.00 - $1,000,000.00 $4,840.50 - first $500,000. Plus $6.90 each add'l $1,000.00 And fraction thereof including $1,000,000. | see rule |
Construction value $1,000,001.00 and up $8,290.50 - first $1,000,000. Plus $5.60 each add'l $1,000.00 And fraction thereof | see rule |
Plan review fee 65% (0.65) x the Building Permit Fee | see rule |
Minnesota state surcharge Value of Work x 0.0005 | see rule |
How this jurisdiction calculates the fee
The building permit fee is determined from the value of the construction using a valuation table, then a plan review fee of 65 percent of the permit fee and a Minnesota state surcharge of 0.0005 times the value of the work are added.
Source: published fee schedule · Verified 11/11/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee, residential or commercial (state surcharge not included) Flat fee $84.20 | $84.20 |
○Table fee for construction value $1.00-$500.00 (the $84.20 minimum still applies) Flat fee $36.70 | $36.70 |
○Base fee for construction value $2,001-$25,000, before the $20.60 per additional $1,000 step Flat fee $104.20 | $104.20 |
How this jurisdiction calculates the fee
Priced as an ordinary Minneapolis building permit. The fee is read off the city's Building Permit Fee Schedule table keyed to construction value (labor plus materials), then a plan review fee of 65% of the permit fee is added, then the Minnesota state surcharge under Minn. Stat. 326B.148 (value of work x 0.0005). The schedule sets a minimum permit fee of $84.20 for residential or commercial work, which does not include the state surcharge; the table's $36.70 entry for values of $1.00-$500.00 is expressly marked as subject to that minimum. Above $500 the fee builds in steps ($36.70 for the first $500 plus $4.50 per additional $100 to $2,000; $104.20 for the first $2,000 plus $20.60 per additional $1,000 to $25,000; and so on). The schedule carries no printed effective date; the city states building permit fees are updated on City Council direction. Fee only; no permit is required for a freestanding deck less than 30 inches high that is not attached to a frost-footed structure and does not serve the main entrance to the dwelling unit.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
Electrical permits are issued by the State of Minnesota and the fees are paid to the state according to the current state fee schedule.
Source: published fee schedule · Verified 8/3/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee, residential or commercial (state surcharge not included) Flat fee $84.20 | $84.20 |
○Table fee for construction value $1.00-$500.00 (the $84.20 minimum still applies) Flat fee $36.70 | $36.70 |
○Base fee for construction value $501-$2,000, before the $4.50 per additional $100 step Flat fee $36.70 | $36.70 |
How this jurisdiction calculates the fee
A fence needs a Minneapolis building permit only when it is over 7 feet high, or when it is a swimming pool barrier fence of any height; fences 7 feet or less need zoning review but no building permit and therefore no building permit fee. When a permit is required it is priced as an ordinary building permit: the fee comes from the city's Building Permit Fee Schedule table keyed to construction value (labor plus materials), plus a plan review fee of 65% of the permit fee (fences over 7 feet and pool barrier fences require plan and site plan submittal), plus the Minnesota state surcharge under Minn. Stat. 326B.148 (value of work x 0.0005). The schedule sets a minimum permit fee of $84.20 for residential or commercial work, exclusive of the state surcharge; the $36.70 entry for values of $1.00-$500.00 is expressly marked as subject to that minimum. The schedule carries no printed effective date; the city states fees are updated on City Council direction.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee, residential or commercial (state surcharge not included) Flat fee $84.20 | $84.20 |
○Table fee for construction value $1.00-$500.00 (the $84.20 minimum still applies) Flat fee $36.70 | $36.70 |
○Base fee for construction value $2,001-$25,000, before the $20.60 per additional $1,000 step Flat fee $104.20 | $104.20 |
How this jurisdiction calculates the fee
A Minneapolis building permit is required for all re-roofing work except repairs involving less than one bundle of shingles (33 1/3 square feet). The permit is priced from the city's Building Permit Fee Schedule table keyed to construction value (labor plus materials), plus the Minnesota state surcharge under Minn. Stat. 326B.148 (value of work x 0.0005). No plan review fee applies: the schedule states there is no plan review fee for simple permits, giving roofing and siding as its examples. The schedule sets a minimum permit fee of $84.20 for residential or commercial work, exclusive of the state surcharge; the $36.70 entry for values of $1.00-$500.00 is expressly marked as subject to that minimum. Above $500 the fee steps up ($36.70 for the first $500 plus $4.50 per additional $100 to $2,000; $104.20 for the first $2,000 plus $20.60 per additional $1,000 to $25,000). The schedule carries no printed effective date; the city states fees are updated on City Council direction.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum building permit fee, residential or commercial (state surcharge not included) Flat fee $84.20 | $84.20 |
○Table fee for construction value $1.00-$500.00 (the $84.20 minimum still applies) Flat fee $36.70 | $36.70 |
○Base fee for construction value $2,001-$25,000, before the $20.60 per additional $1,000 step Flat fee $104.20 | $104.20 |
How this jurisdiction calculates the fee
No building permit and no fee for a one-story tool or storage shed of less than 200 square feet; Minneapolis lists these as exempt from permit (zoning rules still apply). A shed that exceeds the exemption is priced as an ordinary building permit: the fee comes from the city's Building Permit Fee Schedule table keyed to construction value (labor plus materials), plus a plan review fee of 65% of the permit fee, plus the Minnesota state surcharge under Minn. Stat. 326B.148 (value of work x 0.0005). The schedule sets a minimum permit fee of $84.20 for residential or commercial work, exclusive of the state surcharge; the $36.70 entry for values of $1.00-$500.00 is expressly marked as subject to that minimum. The schedule carries no printed effective date; the city states fees are updated on City Council direction. Detached garages are priced from a separate Minneapolis garage fee schedule rather than this table.
Source: published fee schedule · Verified 10/2/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum fee - residential and commercial (includes $1.00 state surcharge) Flat fee $85.20 | $85.20 |
○Full fixture, appliance or appurtenance, including the waste, vent and water piping serving it Flat fee $41.40 | $41.40 |
○Water distribution piping, per 100 lineal feet or fraction thereof Flat fee $41.40 | $41.40 |
○Non-heating gas burner not exceeding 399,999 Btu Flat fee $73.30 | $73.30 |
○Non-heating gas burner 400,000 Btu and over Flat fee $291.00 | $291.00 |
How this jurisdiction calculates the fee
Plumbing permit fees are calculated from the number of plumbing fixtures, appliances or appurtenances covered by the permit, subject to a minimum fee.
Source: published fee schedule · Verified 9/18/2026
See the full write-up: Minneapolis building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.