St. Paul, Minnesota Building Permit Cost Calculator
Estimates permit cost in St. Paul from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation $0 to $500 Flat fee $36.00 | $36.00 |
○Valuation $9,001 to $10,000 Flat fee $274.00 | $274.00 |
○Valuation $49,001 to $50,000 Flat fee $966.00 | $966.00 |
○Valuation $99,001 to $100,000 Flat fee $1,522.00 | $1,522.00 |
○Valuation $100,001 to $500,000 $1,499.00 for the first $100,000.00, plus 150 x $8.00 for $150,000.00 over (rounded up per "or fraction thereof") = $2,699.00 | $2,699.00 |
○Valuation $500,001 to $1,000,000 $250,000.00 is within the first $500,000.00, so the base $4,899.00 applies | $4,899.00 |
○Valuation over $1,000,000 $250,000.00 is within the first $1,000,000.00, so the base $8,463.00 applies | $8,463.00 |
Plan check fee (valuations over $1,000) · add-on 65% of the permit fee — select the permit fee line above to calculate | see rule |
State surcharge, job value up to $1,000,000 0.0005 x job value (minimum $0.50 for $1 to $1,000) | see rule |
○Grading/fill permit, under 100 cubic yards Flat fee $39.00 | $39.00 |
Grading/fill permit, 100 to 1,000 cubic yards $39.00 for the first 100 cubic yards plus $29.00 for each additional 100 cubic yards or fraction thereof | see rule |
Grading/fill permit, 1,001 to 10,000 cubic yards $288.00 for the first 1,000 cubic yards plus $25.00 for each additional 1,000 cubic yards or fraction thereof | see rule |
How this jurisdiction calculates the fee
Building permit fees come from the Saint Paul DSI Building Permit Fee Schedule (Section 33.04 of the Saint Paul Legislative Code, effective 2/25/2023), which carries the full valuation table, the 65% plan check fee and the Minnesota Statute 326B.148 state surcharge. The grading/fill amounts below are NOT in that schedule: they are published separately on the DSI Grading/Fill Permit & Inspections page at https://www.stpaul.gov/departments/safety-inspections/building-and-construction/construction-permits-and-inspections/building-permits-inspections/grading-fill-permit-inspections, where all three were confirmed verbatim on 2026-09-14. Verified 2026-09-14: the 2/25/2023 schedule is newer than the June 2022 copy the city page currently links, so this citation is the better one. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The cited fee schedule re-read in full; still "Effective: 2/25/2023" and issued under Section 33.04 of the Saint Paul Legislative Code, and the whole valuation ladder re-reads verbatim ($36 at 0-500; $274 at 9,001-10,000; $966 at 49,001-50,000; $1,522 at 99,001-100,000; $1,499 for the first $100,000 plus $8; $4,899 for the first $500,000 plus $7; $8,463 for the first $1,000,000 plus $5), as do the 65 percent plan check and the 0.0005 state surcharge. SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE: the City's current Building Information & Applications page links /sites/default/files/2023-02/DSI.BldgPermitFeeSchedule.2023.pdf, which is the same February 2023 schedule as the cited ..._0_3.pdf copy (different md5, byte-for-byte identical content once layout whitespace is normalised, both headed Effective 2/25/2023). No 2024, 2025 or 2026 edition is published. SOURCING GAP REPORTED, NOT GUESSED: the grading/fill permit figures on this row, including $39.00 for under 100 cubic yards, appear in NEITHER cited document. They are presumably set in Legislative Code Chapter 33 or a separate site-permit schedule; a human should locate it or the grading lines should move to their own citation.
Source: published fee schedule · Verified 9/28/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit fee for valuation $0-$500 (lowest band in the Sec. 33.04 table) Flat fee $36.00 | $36.00 |
○Permit fee for valuation $2,001-$3,000 Flat fee $127.00 | $127.00 |
○Permit fee for valuation $4,001-$5,000 Flat fee $169.00 | $169.00 |
○Minnesota state surcharge for job value $1-$1,000 Flat fee $0.50 | $0.50 |
How this jurisdiction calculates the fee
Priced from the Saint Paul DSI Building Permit Fee Schedule adopted under Sec. 33.04 of the Saint Paul Legislative Code, effective 2/25/2023. The permit fee is looked up in a valuation band table that starts at $36 for valuations of $0-$500 and rises in $100 bands to $2,000, then in $1,000 bands (for example $127 at $2,001-$3,000, rising $21 per $1,000 through $25,000). On top of the permit fee the schedule adds a plan check fee of 65% of the table fee for valuations over $1,000 (no plan check fee at $1,000 or less) and the Minnesota state surcharge under Minn. Stat. 326B.148 ($0.50 for job value of $1-$1,000, otherwise 0.0005 x job value up to $1,000,000). The schedule notes the calculation is the building permit fee only and excludes other charges such as SAC, parkland dedication and zoning fees. Decks require a permit except a deck or platform not attached to a frost-footed structure, not acting as a landing outside an exterior door and not more than 30 inches above grade.
Source: published fee schedule · Verified 11/4/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Per Service; New, Altered, or Repaired Flat fee $85.00 | $85.00 |
○Per Circuit; New, Altered, or Repaired Flat fee $15.00 | $15.00 |
○Minimum Fee Flat fee $85.00 | $85.00 |
○State Surcharge (Minimum) Flat fee $1.00 | $1.00 |
How this jurisdiction calculates the fee
Electrical permit fees are charged per service and per circuit, subject to a minimum fee, plus a state surcharge.
Source: published fee schedule · Verified 11/10/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○First 200 lineal feet or fraction thereof Flat fee $45.00 | $45.00 |
○Each additional 100 lineal feet or fraction thereof Flat fee $15.00 | $15.00 |
○Variance application, per variance request (nonrefundable) Flat fee $85.00 | $85.00 |
How this jurisdiction calculates the fee
The fence permit fee is based on the length of fence, and a separate nonrefundable fee applies to each variance request.
Source: published fee schedule · Verified 11/11/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit fee for valuation $0-$500 (lowest band in the Sec. 33.04 table) Flat fee $36.00 | $36.00 |
○Permit fee for valuation $9,001-$10,000 Flat fee $274.00 | $274.00 |
○Permit fee for valuation $14,001-$15,000 Flat fee $379.00 | $379.00 |
○Minnesota state surcharge for job value $1-$1,000 Flat fee $0.50 | $0.50 |
How this jurisdiction calculates the fee
Re-roofing is one of the work types Saint Paul allows on a Contractor Express building permit, but no separate express rate is published: the fee is the ordinary building permit fee from the DSI Building Permit Fee Schedule adopted under Sec. 33.04 of the Saint Paul Legislative Code, effective 2/25/2023. The permit fee is looked up in a valuation band table that starts at $36 for valuations of $0-$500 and rises in $100 bands to $2,000, then in $1,000 bands (for example $127 at $2,001-$3,000 and $274 at $9,001-$10,000). The schedule also states a plan check fee of 65% of the table fee for valuations over $1,000 and none at $1,000 or less, and the Minnesota state surcharge under Minn. Stat. 326B.148 ($0.50 for job value of $1-$1,000, otherwise 0.0005 x job value up to $1,000,000). Owners cannot use the Contractor Express application and must file a general building permit application; structural work is excluded from the express permit.
Source: published fee schedule · Verified 11/4/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit fee for valuation $0-$500 (lowest band in the Sec. 33.04 table) Flat fee $36.00 | $36.00 |
○Permit fee for valuation $2,001-$3,000 Flat fee $127.00 | $127.00 |
○Permit fee for valuation $9,001-$10,000 Flat fee $274.00 | $274.00 |
○Minnesota state surcharge for job value $1-$1,000 Flat fee $0.50 | $0.50 |
How this jurisdiction calculates the fee
Saint Paul requires a building permit for a retaining wall that is taller than 4 feet at any point measured from the base of the footing to the top of the wall, and for a wall of any height supporting a surcharge; walls at or under 4 feet with no surcharge need no permit and so carry no fee. A permitted wall is priced from the DSI Building Permit Fee Schedule adopted under Sec. 33.04 of the Saint Paul Legislative Code, effective 2/25/2023: the permit fee is looked up in a valuation band table starting at $36 for valuations of $0-$500, rising in $100 bands to $2,000 and then in $1,000 bands (for example $127 at $2,001-$3,000 and $274 at $9,001-$10,000). A plan check fee of 65% of the table fee applies to valuations over $1,000 (none at $1,000 or less) and every permitted wall requires plan submittal to Plan Review, so the plan check fee will normally apply. The Minnesota state surcharge under Minn. Stat. 326B.148 is added ($0.50 for job value of $1-$1,000, otherwise 0.0005 x job value up to $1,000,000).
Source: published fee schedule · Verified 11/4/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Permit fee for valuation $0-$500 (lowest band in the Sec. 33.04 table) Flat fee $36.00 | $36.00 |
○Permit fee for valuation $4,001-$5,000 Flat fee $169.00 | $169.00 |
○Permit fee for valuation $9,001-$10,000 Flat fee $274.00 | $274.00 |
○Minnesota state surcharge for job value $1-$1,000 Flat fee $0.50 | $0.50 |
How this jurisdiction calculates the fee
No building permit and no permit fee for a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use where the floor area does not exceed 200 square feet; Saint Paul still applies zoning setback and lot coverage rules to those. A shed larger than 200 square feet requires a building permit priced from the DSI Building Permit Fee Schedule adopted under Sec. 33.04 of the Saint Paul Legislative Code, effective 2/25/2023: the permit fee is looked up in a valuation band table starting at $36 for valuations of $0-$500, rising in $100 bands to $2,000 and then in $1,000 bands (for example $127 at $2,001-$3,000 and $274 at $9,001-$10,000). A plan check fee of 65% of the table fee applies to valuations over $1,000 (none at $1,000 or less), plus the Minnesota state surcharge under Minn. Stat. 326B.148 ($0.50 for job value of $1-$1,000, otherwise 0.0005 x job value up to $1,000,000).
Source: published fee schedule · Verified 11/2/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum permit fee Flat fee $85.00 | $85.00 |
○Per unit - Gas Flat fee $34.00 | $34.00 |
○If unit BTU's greater than 100,000, additional fee for each 100,000 BTU's or fraction thereof Flat fee $15.00 | $15.00 |
○State Surcharge Flat fee $1.00 | $1.00 |
How this jurisdiction calculates the fee
Gas permit fees are charged per unit, subject to a minimum permit fee, with an added charge for high-BTU units and a state surcharge.
Source: published fee schedule · Verified 11/10/2026
See the full write-up: St. Paul building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.