B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Lincoln, Nebraska Building Permit Cost Calculator

Estimates permit cost in Lincoln from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum fee, which increases from there
Flat fee $65.00
$65.00
○New home deposit
Flat fee $100.00
$100.00
How this jurisdiction calculates the fee

For some types of building permits the fee is required up front; otherwise the fee is paid after the city has reviewed the application. For new homes the permit fee is calculated based on the square footage.

Source: published fee schedule · Verified 9/25/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, construction value $1-$500
Flat fee $35.00
$35.00
○Base building permit fee, construction value $501-$25,000, before the $4.00 per additional $1,000 step
Flat fee $39.00
$39.00
○Minimum plan review fee for a one- or two-family dwelling
Flat fee $30.00
$30.00
○Each inspection beyond the number included for the value band
Flat fee $30.00
$30.00
How this jurisdiction calculates the fee

A deck requires a City of Lincoln building permit, priced from Table 1 (Residential Permit Fees) in Lincoln Municipal Code 20.12.070, which amends Section R108 of the International Residential Code as adopted by the Lincoln Residential Building Code (last amended by Ord. 21786 sec. 46, September 29, 2025). The permit fee is $35.00 for construction value of $1-$500 (2 inspections included), and $39.00 plus $4.00 for each additional $1,000 or fraction thereof for value of $501-$25,000 (3 inspections). A plan review fee is added: for one- and two-family dwellings it is 30% of the building permit fee or $30.00, whichever is greater. Inspections beyond the number included for the value band are $30.00 each and a reinspection where a deficiency has not been corrected is $50.00. Work started before the permit is issued draws an investigation fee equal to the permit fee. Nebraska levies no state building permit surcharge.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Base fee (appears at the foot of both the Contractors and the Homeowners tables)
Flat fee $30.00
$30.00
○Contractor temporary service, 0-200 amperes
Flat fee $30.00
$30.00
○Contractor service, 0-200 amperes
Flat fee $30.00
$30.00
○Contractor service, 201-400 amperes
Flat fee $45.00
$45.00
○Contractor service, 401-800 amperes
Flat fee $90.00
$90.00
○Contractor service, 801-2000 amperes
Flat fee $200.00
$200.00
○Contractor service, over 2000 amperes
Flat fee $400.00
$400.00
○Contractor branch circuits and feeders, each new, extension or modification
Flat fee $6.00
$6.00
○Homeowner branch circuit
Flat fee $8.00
$8.00
○Homeowner feeder for a sub panel
Flat fee $20.00
$20.00
○Fire alarm control panel
Flat fee $30.00
$30.00
○Fire alarm device, each
Flat fee $1.00
$1.00
○Application for inspection of dormant service(s) and consultation (Contractors table)
Flat fee $30.00
$30.00
○Owner requested inspection (Other Electrical Fees)
Flat fee $35.00
$35.00
○Inspection for dormant services for restoration of power (Other Electrical Fees)
Flat fee $35.00
$35.00
○Re-inspection fee (Other Electrical Fees)
Flat fee $35.00
$35.00
○Work done beyond Lincoln city limits, from 3 miles to 8 miles beyond
Flat fee $15.00
$15.00
○Work done beyond Lincoln city limits, beyond 8 miles
Flat fee $30.00
$30.00
○Minimum permit fee stated on the Homeowner Electrical Projects page
Flat fee $35.00
$35.00
How this jurisdiction calculates the fee

Electrical permit fees come from the City of Lincoln Building and Safety Electrical Fees schedule, which has separate City/County Contractors and City/County Homeowners tables. Each table carries a $30 base fee plus per-item charges, and both tables add a distance surcharge for work done beyond the Lincoln city limits. A third block, Other Electrical Fees, sets owner-requested, dormant-service and re-inspection charges at $35 each. The schedule notes that fees are subject to change with each code cycle. Payment can be made online through Citizen Access by Visa, Mastercard, American Express or Discover.

Source: published fee schedule · Verified 9/15/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, construction value $1-$500 (fences over 7 feet)
Flat fee $35.00
$35.00
○Base building permit fee, construction value $501-$25,000, before the $4.00 per additional $1,000 step
Flat fee $39.00
$39.00
○Minimum plan review fee for a one- or two-family dwelling
Flat fee $30.00
$30.00
How this jurisdiction calculates the fee

No City of Lincoln building permit and no fee for a fence not over 7 feet high: Lincoln Municipal Code 20.12.035, which amends IRC Section R105.2 (work exempt from permit), lists fences not over 7 feet as exempt. A fence over 7 feet high requires a building permit, priced from Table 1 (Residential Permit Fees) in Lincoln Municipal Code 20.12.070 (Section R108 amended; last amended by Ord. 21786 sec. 46, September 29, 2025): $35.00 for construction value of $1-$500, and $39.00 plus $4.00 for each additional $1,000 or fraction thereof for value of $501-$25,000. A plan review fee of 30% of the permit fee or $30.00, whichever is greater, is added for one- and two-family dwellings. Corner-lot and driveway or alley fences under 7 feet still need a sight-distance review by Public Works, for which the city states no permit is required. Nebraska levies no state building permit surcharge.

Source: published fee schedule · Verified 9/15/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, construction value $1-$500
Flat fee $35.00
$35.00
○Base building permit fee, construction value $501-$25,000, before the $4.00 per additional $1,000 step
Flat fee $39.00
$39.00
○Minimum plan review fee for a one- or two-family dwelling
Flat fee $30.00
$30.00
How this jurisdiction calculates the fee

Straight re-shingling over solid sheathing is exempt from permit in Lincoln, so it carries no fee: Lincoln Municipal Code 20.12.035, amending IRC Section R105.2, lists residing and re-shingling as exempt but expressly excludes new roof sheathing. A building permit is required, and a fee charged, when the work involves new sheathing over the existing deck or repair of rotted sheathing or rafters. The permit is then priced from Table 1 (Residential Permit Fees) in Lincoln Municipal Code 20.12.070 (Section R108 amended; last amended by Ord. 21786 sec. 46, September 29, 2025): $35.00 for construction value of $1-$500, and $39.00 plus $4.00 for each additional $1,000 or fraction thereof for value of $501-$25,000, with a plan review fee of 30% of the permit fee or $30.00, whichever is greater, for one- and two-family dwellings. Nebraska levies no state building permit surcharge.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Building permit fee, construction value $1-$500
Flat fee $35.00
$35.00
○Base building permit fee, construction value $501-$25,000, before the $4.00 per additional $1,000 step
Flat fee $39.00
$39.00
○Base building permit fee, construction value $25,001-$100,000, before the $2.00 per additional $1,000 step
Flat fee $139.00
$139.00
○Minimum plan review fee for a one- or two-family dwelling
Flat fee $30.00
$30.00
How this jurisdiction calculates the fee

No City of Lincoln building permit and no fee for a retaining wall not over 4 feet in height measured from the lowest adjacent grade to the top of the wall, unless it supports a surcharge: this exemption is in Lincoln Municipal Code 20.12.035, amending IRC Section R105.2. A wall over 4 feet, or a wall of any height carrying a surcharge, requires a building permit priced from Table 1 (Residential Permit Fees) in Lincoln Municipal Code 20.12.070 (Section R108 amended; last amended by Ord. 21786 sec. 46, September 29, 2025): $35.00 for construction value of $1-$500, and $39.00 plus $4.00 for each additional $1,000 or fraction thereof for value of $501-$25,000, rising to $139.00 plus $2.00 per additional $1,000 for value of $25,001-$100,000. A plan review fee of 30% of the permit fee or $30.00, whichever is greater, is added for one- and two-family dwellings, and each inspection beyond those included in the value band is $30.00. Nebraska levies no state building permit surcharge.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum fee, which increases from there
Flat fee $65.00
$65.00
How this jurisdiction calculates the fee

For some types of building permits the fee is required up front; otherwise the fee is paid after the city has reviewed the application.

Source: published fee schedule · Verified 9/25/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $35.00
$35.00
○Additional inspection trip
Flat fee $35.00
$35.00
How this jurisdiction calculates the fee

Every plumbing permit carries a minimum fee, and each service is an additional fee on top of that minimum. Payment can be made online through Citizen Access by Visa, Mastercard, American Express or Discover.

Source: published fee schedule · Verified 9/25/2026

See the full write-up: Lincoln building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.