B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Omaha, Nebraska Building Permit Cost Calculator

Estimates permit cost in Omaha from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Valuation $25,001.00 to $50,000.00
$260.19 for the first $25,000.00 plus $6.44 for each additional $1,000.00 or fraction thereof, to and including $50,000.00
see rule
Valuation $50,001.00 to $100,000.00
$421.19 for the first $50,000.00 plus $3.19 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
see rule
○Valuation $100,001.00 to $500,000.00
$580.69 for the first $100,000.00, plus 150 x $2.78 for $150,000.00 over (rounded up per "or fraction thereof") = $997.69
$997.69
○Valuation $500,001.00 to $1,000,000.00
$250,000.00 is within the first $500,000.00, so the base $1,692.69 applies
$1,692.69
○Valuation $1,000,001.00 and up
$250,000.00 is within the first $1,000,000.00, so the base $2,877.69 applies
$2,877.69
Plan review fee
25 percent of the building permit fee
see rule
Work started before the permit is issued
Quadruple the amount of the regular fee
see rule
○Certificate of occupancy
Flat fee $125.00
$125.00
○Second and each additional inspector trip
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

The building permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 9/18/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Plan review fee
25 percent of the building permit fee
see rule
How this jurisdiction calculates the fee

The permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 10/1/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum fee on all electrical work
Flat fee $25.00
$25.00
○New residential, per square foot
Flat fee $0.06
$0.06
○New residential temporary pole, each
Flat fee $25.00
$25.00
○New residential pre-connect, each
Flat fee $25.00
$25.00
○Branch circuits and feeders, each
Flat fee $2.00
$2.00
○Existing electrical service
Flat fee $20.00
$20.00
○New service 1 to 100 ampere
Flat fee $25.00
$25.00
○New service 101 to 200 ampere
Flat fee $25.00
$25.00
○New service 201 to 400 ampere
Flat fee $65.00
$65.00
○New service 401 to 600 ampere
Flat fee $105.00
$105.00
○New service 601 to 800 ampere
Flat fee $145.00
$145.00
○New service 801 to 1,000 ampere
Flat fee $185.00
$185.00
New service larger than 1,000 ampere
$185.00 for the first 1,000 ampere plus $20.00 for each additional 100 ampere
see rule
○Second additional inspector trip and each additional trip thereafter
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

Electrical permit fees are charged per item of work under the schedule in Omaha Municipal Code section 44-130, with a minimum fee on all electrical work of $25.00; new one- and two-family and town home construction is charged on a square foot basis.

Source: published fee schedule · Verified 9/18/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Plan review fee
25 percent of the building permit fee
see rule
How this jurisdiction calculates the fee

The permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 10/1/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Plan review fee
25 percent of the building permit fee
see rule
How this jurisdiction calculates the fee

The permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 10/2/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Plan review fee
25 percent of the building permit fee
see rule
How this jurisdiction calculates the fee

The permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 9/30/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $2,000.00
Flat fee $41.00
$41.00
Valuation $2,000.00 to $25,000.00
$41.00 for the first $2,000.00 plus $9.53 for each additional $1,000.00 or fraction thereof, to and including $25,000.00
see rule
Plan review fee
25 percent of the building permit fee
see rule
How this jurisdiction calculates the fee

The permit fee is calculated from the construction valuation of the work using the graduated table in Omaha Municipal Code section 43-91, and a plan review fee equal to 25 percent of the building permit fee is paid when the application and plans are submitted.

Source: published fee schedule · Verified 10/2/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $22.70
$22.70
○Each residential water heater
Flat fee $7.95
$7.95
○Each residential water heater replacement (maximum fee)
Flat fee $11.35
$11.35
○Each commercial water heater
Flat fee $34.00
$34.00
○Each fixture, roughed-in opening or roof drain
Flat fee $7.95
$7.95
○Residential and commercial water service one inch or less
Flat fee $7.95
$7.95
How this jurisdiction calculates the fee

Plumbing permit fees are charged per fixture or item of work under the schedule in Omaha Municipal Code section 49-304, subject to a minimum permit fee.