Henderson, Nevada Building Permit Cost Calculator
Estimates permit cost in Henderson from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-Family - Custom, size basis 2,000 square feet: Plan Check Flat fee $4,040.00 | $4,040.00 |
○Single-Family - Custom, size basis 2,000 square feet: Plan Check Cost Each add'l 100 s.f Flat fee $43.00 | $43.00 |
○Single-Family - Custom, size basis 2,000 square feet: Inspection Flat fee $2,877.00 | $2,877.00 |
○Single-Family - Custom, size basis 2,000 square feet: Inspection Cost Each add'l 100 s.f Flat fee $42.00 | $42.00 |
○Single-Family - Custom, size basis 4,000 square feet: Plan Check Flat fee $4,890.00 | $4,890.00 |
○Single-Family - Custom, size basis 4,000 square feet: Inspection Flat fee $3,725.00 | $3,725.00 |
○Single-Family - Standard Plan, size basis 2,000 square feet: Plan Check Flat fee $2,409.00 | $2,409.00 |
Single-Family - Standard Plan, size basis 2,000 square feet: Inspection $- | see rule |
○Single-Family - Model, size basis 2,000 square feet: Plan Check Flat fee $60.00 | $60.00 |
○Single-Family - Model, size basis 2,000 square feet: Inspection Flat fee $1,028.00 | $1,028.00 |
○Single-Family - Production, size basis 2,000 square feet: Inspection Flat fee $1,190.00 | $1,190.00 |
○Single-Family - Production, size basis 2,000 square feet: Inspection Cost Each add'l 100 s.f Flat fee $15.00 | $15.00 |
○Single-Family Residential - Addition, size basis 1,000 square feet: Plan Check Flat fee $1,601.00 | $1,601.00 |
○Single-Family Residential - Addition, size basis 1,000 square feet: Inspection Flat fee $1,555.00 | $1,555.00 |
○Duplex - Production, size basis 2,000 square feet: Plan Check Flat fee $61.00 | $61.00 |
○Duplex - Production, size basis 2,000 square feet: Inspection Flat fee $586.00 | $586.00 |
○Temporary Certificate of Occupancy (each) Flat fee $862.00 | $862.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table A of the Schedule of Fees charges a plan check fee and an inspection fee for new construction at each size basis in square feet, plus a stated cost for each additional 100 square feet, and the residential categories are split between standard plan, model, production and custom work. All Table A fees include MPE plan checks and inspections. Fire plan check and inspection fees in Table D are charged separately, and a utilities surcharge is added on top of the building plan check fees. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region.
Source: published fee schedule · Verified 9/30/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential Deck / Patio Enclosure from a Standard Plan - First 200 SF Flat fee $326.00 | $326.00 |
○Residential Deck / Patio Enclosure from a Standard Plan - Each Additional 100 SF Flat fee $14.00 | $14.00 |
○Residential Deck / Patio Enclosure - Custom - First 200 SF Flat fee $707.00 | $707.00 |
○Residential Deck / Patio Enclosure - Custom - Each Additional 100 SF Flat fee $149.00 | $149.00 |
○Residential Patio from a Standard Plan - First 200 SF Flat fee $298.00 | $298.00 |
○Residential Patio from a Standard Plan - Each Additional 100 SF Flat fee $14.00 | $14.00 |
○Residential Patio - Custom - First 200 SF Flat fee $686.00 | $686.00 |
○Residential Patio - Custom - Each Additional 100 SF Flat fee $149.00 | $149.00 |
○Residential Patio Roof Cover from a Standard Plan - First 200 SF Flat fee $326.00 | $326.00 |
○Residential Patio Roof Cover - Custom - First 200 SF Flat fee $686.00 | $686.00 |
○Carport or Patio Cover Standard Plan (Plan Check Only) Flat fee $853.00 | $853.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table B of the Schedule of Fees charges a residential deck or patio enclosure at a flat fee for the first 200 square feet plus a stated cost for each additional 100 square feet, with separate amounts for work built from an approved standard plan and for custom work. Patios, patio roof covers and carports are priced as separate categories in the same table. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.
Source: published fee schedule · Verified 9/14/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Stand Alone Electrical Plan Check (hourly) Flat fee $429.00 | $429.00 |
○Each General Lighting Outlet, Receptacle Outlet, and Switch (Multi-Outlet Assemblies, Each 5' or Portion Thereof) Flat fee $152.00 | $152.00 |
○Area Lighting - per Pole Flat fee $194.00 | $194.00 |
○Each Appliance no limit to Horsepower (HP), Kilowatt (KW), or Kilovolt-Ampere (KV) in Rating Flat fee $155.00 | $155.00 |
○Each Temporary Power Pole or Service Flat fee $206.00 | $206.00 |
○Each Service regardless of Ampere in Rating, Including First Meter Socket Flat fee $190.00 | $190.00 |
○Each Individual Meter Socket/Sub-Panel/Distribution Board Flat fee $175.00 | $175.00 |
○Each Recreational Mobile Home or Vehicle Space Flat fee $265.00 | $265.00 |
○Each Signal, Alarm, or Television Outlet, Control Panel, Antenna, or Telephone Switchboard (more than 50 Volts) Flat fee $178.00 | $178.00 |
○Underwater Light - Each Flat fee $190.00 | $190.00 |
○Other Electrical Inspections (per hour) Flat fee $286.00 | $286.00 |
○Lighting pole Flat fee $249.00 | $249.00 |
○Lighting pole, each add'l pole Flat fee $9.00 | $9.00 |
○Photovoltaic, Residential, Up to 10 kW System Flat fee $700.00 | $700.00 |
○Photovoltaic, Residential, Each Additional 10 kW in the Same System Flat fee $176.00 | $176.00 |
○EV Receptacle (not part of a PV system) - each Flat fee $223.00 | $223.00 |
○Generator (not part of a PV system) - each Flat fee $394.00 | $394.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table C of the Schedule of Fees charges electrical work as separate flat fees per outlet, appliance, service, meter socket and lighting pole, with a stand alone electrical plan check billed hourly and other electrical inspections billed per hour. Photovoltaic systems, battery storage, electric vehicle receptacles and generators are priced separately as miscellaneous building items in Table B. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.
Source: published fee schedule · Verified 9/14/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fence or Freestanding Wall (Non-Masonry) - Any height - First 100 lf Flat fee $294.00 | $294.00 |
○Fence or Freestanding Wall (Non-Masonry) - Any height - Each additional 100 lf Flat fee $18.00 | $18.00 |
○Fence or Freestanding Wall (Masonry): Standard Plan - Each Design Package Flat fee $878.00 | $878.00 |
○Fence or Freestanding Wall (Masonry): Masonry, Standard (0-6 feet high) - Up to 100 lf Flat fee $174.00 | $174.00 |
○Fence or Freestanding Wall (Masonry): Masonry, Standard (0-6 feet high) - Each additional 100 lf Flat fee $87.00 | $87.00 |
○Fence or Freestanding Wall (Masonry): Masonry, Special Design - Up to 100 lf Flat fee $628.00 | $628.00 |
○Fence or Freestanding Wall (Masonry): Masonry, Special Design - Each additional 100 lf Flat fee $135.00 | $135.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table B of the Schedule of Fees charges fences and freestanding walls by linear foot band, with a base fee for the first 100 linear feet and a lower fee for each additional 100 linear feet. Non-masonry fences and freestanding walls of any height carry a single rate, masonry fences and walls are split between a standard band covering zero to six feet and a special design rate, and a masonry fence built from an approved standard plan is charged separately for each design package. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.
Source: published fee schedule · Verified 9/14/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Reroofing or roof covering replacement on an existing building No fee published in the Schedule of Fees | see rule |
○Nearest published roof related item, Photovoltaic, Residential, PV Panel Changeout (not a roof covering replacement) Flat fee $127.00 | $127.00 |
○Nearest published roof related item, Photovoltaic, Commercial - Rooftop, Up to 10 kW System (not a roof covering replacement) Flat fee $827.00 | $827.00 |
○Nearest published roof related item, Residential Patio Roof Cover from a Standard Plan - First 200 SF (not a roof covering replacement) Flat fee $326.00 | $326.00 |
○Dwelling Remodel - Single or Multifamily - First 200 SF (published remodel category, not a roofing category) Flat fee $817.00 | $817.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
The City of Henderson Development Services Center Schedule of Fees publishes no reroofing or roof covering permit fee. Table A prices new construction by occupancy and floor area, Table B lists miscellaneous building items and other miscellaneous residential structures and remodels, and Table C lists mechanical, plumbing and electrical items; none of the three contains a roofing, reroofing or roof covering category. The only roof related entries anywhere in the schedule are rooftop photovoltaic systems, residential patio roof covers and rooftop heliports, and none of those is a roof covering replacement. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region, under Henderson Municipal Code Chapter 15.02 and Nevada Revised Statutes Chapter 354. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.
Source: published fee schedule · Verified 9/14/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Retaining Wall (concrete or masonry): Standard Plan - Each Design Package Flat fee $875.00 | $875.00 |
○Retaining Wall (concrete or masonry): Standard - Up to 50 lf Flat fee $417.00 | $417.00 |
○Retaining Wall (concrete or masonry): Standard - Each additional 50 lf Flat fee $18.00 | $18.00 |
○Retaining Wall (concrete or masonry): Special Design, any height - Up to 50 lf Flat fee $632.00 | $632.00 |
○Retaining Wall (concrete or masonry): Special Design, any height - Each additional 50 lf Flat fee $18.00 | $18.00 |
○Retaining Wall (concrete or masonry): Gravity / Crib Wall, any height - Up to 50 lf Flat fee $661.00 | $661.00 |
○Retaining Wall (concrete or masonry): Gravity / Crib Wall, any height - Each additional 50 lf Flat fee $18.00 | $18.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table B of the Schedule of Fees charges retaining walls of concrete or masonry by linear foot band, with a base fee for the first 50 linear feet and a lower fee for each additional 50 linear feet. Three wall types are priced separately: a standard wall, a special design wall of any height, and a gravity or crib wall of any height. A wall built from an approved standard plan is charged separately for each design package, and that design package charge is a distinct item from the per linear foot standard tier. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region. === 2026-10-01 DELIBERATELY HELD UNSTAMPED, DOCUMENT BLOCKED AT THE EDGE. The cited URL was probed twice today, first with curl and then from a real headless-Chromium browser context with a current desktop user agent, and BOTH returned HTTP 403 from Akamai with an errors.edgesuite.net reference, not a 404. Per the lane rule, trust a 404 and never a 403: this is the edge refusing our CLIENT, and it proves nothing whatever about whether the path, the document or the figures still exist. No CAPTCHA or proof-of-work challenge was solved and none will be. This row was therefore left untouched and unstamped rather than guessed at, so it sorts to the front of the next rotation. ESCALATION FOR A HUMAN: this jurisdiction has now been unreadable to automated verification across passes, so its figures cannot be confirmed or refuted by this lane at all while the edge block holds. It needs either a one-off manual read of the schedule, or an agreed residential-IP or allow-listed fetch path, before its public "verified" date can honestly advance. Candidate next step for an automated pass: look for the same schedule mirrored on a non-Akamai host (an agenda packet, a council resolution PDF, or a state-level aggregator on a .gov domain), which would give a citable official source without fighting the edge.
Source: published fee schedule · Verified 9/14/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Accessory Building - Residential, size basis 200 square feet: Plan Check Flat fee $1,079.00 | $1,079.00 |
○Accessory Building - Residential, size basis 200 square feet: Plan Check Cost Each add'l 100 s.f Flat fee $21.00 | $21.00 |
○Accessory Building - Residential, size basis 200 square feet: Inspection Flat fee $317.00 | $317.00 |
○Accessory Building - Residential, size basis 200 square feet: Inspection Cost Each add'l 100 s.f Flat fee $79.00 | $79.00 |
○Accessory Building - Residential, size basis 600 square feet: Plan Check Flat fee $1,164.00 | $1,164.00 |
○Accessory Building - Residential, size basis 600 square feet: Inspection Flat fee $633.00 | $633.00 |
○Accessory Building - Residential, size basis 1,000 square feet: Plan Check Flat fee $1,303.00 | $1,303.00 |
○Accessory Building - Residential, size basis 1,000 square feet: Inspection Flat fee $1,266.00 | $1,266.00 |
○Accessory Building - Residential, size basis 2,000 square feet: Plan Check Flat fee $1,479.00 | $1,479.00 |
○Accessory Building - Residential, size basis 2,000 square feet: Inspection Flat fee $1,583.00 | $1,583.00 |
○Accessory Building - Residential, size basis 4,000 square feet: Plan Check Flat fee $1,809.00 | $1,809.00 |
○Accessory Building - Residential, size basis 4,000 square feet: Inspection Flat fee $2,532.00 | $2,532.00 |
How this jurisdiction calculates the fee
Table A of the Schedule of Fees charges a plan check fee and an inspection fee for a residential accessory building at each size basis in square feet, plus a stated cost for each additional 100 square feet. All fees include MPE plan checks and inspections. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Henderson fee schedule (31 pages) was downloaded and read in full with pdftotext -layout; all twelve Accessory Building - Residential plan check and inspection figures re-read verbatim across all five size bases. SCHEDULED SUPERSESSION RECORDED: the schedule carries a self-executing annual escalator, adjusting fees "effective January 1 of each year, up to the percentage increase in" the stated index, so the whole Henderson schedule turns over on 2027-01-01 without any further council action.
Source: published fee schedule · Verified 9/28/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Water Heater Flat fee $81.00 | $81.00 |
○Solar Water Heaters (separate item, not the storage water heater fee) Flat fee $261.00 | $261.00 |
○Gas Piping - 1-4 outlets Flat fee $267.00 | $267.00 |
○Gas Piping - each additional 4 outlets Flat fee $120.00 | $120.00 |
○Gas Line, Per Appliance, Single-Family and Commercial Flat fee $392.00 | $392.00 |
○Gas line repair or tag Flat fee $245.00 | $245.00 |
○Water Piping Replacement (each 2,500 sf) (Kitec & repipes) Flat fee $240.00 | $240.00 |
○Plumbing fixtures, including piping (each 10 fixtures) Flat fee $189.00 | $189.00 |
○Miscellaneous repair, including repair or alteration of drainage or vent piping, each fixture Flat fee $211.00 | $211.00 |
○Stand Alone Plumbing Plan Check (hourly) Flat fee $429.00 | $429.00 |
○Other Plumbing and Gas Inspections (per hour @ staff hourly rates) Flat fee $299.00 | $299.00 |
Building Permit Plan Check Surcharge, percent of total building plan check fees assessed (Utilities charge on top of Building fees) 9.00% | see rule |
How this jurisdiction calculates the fee
Table C of the Schedule of Fees charges a single flat fee for a water heater permit, listed under plumbing and gas permit fees and not varying with size or fuel. A separate and higher flat fee is published for solar water heaters, which is a different item from the storage water heater fee and does not apply to an ordinary water heater replacement. Associated gas piping, water piping and fixture work is charged separately in the same table. The fees may be adjusted by the City Council effective January 1 of each year up to the percentage increase in the Consumer Price Index for All Urban Consumers in the West Region.
Source: published fee schedule · Verified 9/30/2026
See the full write-up: Henderson building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.