North Las Vegas, Nevada Building Permit Cost Calculator
Estimates permit cost in North Las Vegas from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
○Additional plan review required by changes, additions or revisions to approved plans (per hour) Flat fee $80.00 | $80.00 |
○Reinspection fee Flat fee $100.00 | $100.00 |
Recording fee charged on each permit · add-on 3% of the permit fee, minimum $2.00 — select the permit fee line above to calculate | see rule |
○Inspections for which no fee is specifically indicated (per hour, two-hour minimum for single family structures) Flat fee $100.00 | $100.00 |
○Investigation fee for work begun without a permit, single family residential (minimum) Flat fee $200.00 | $200.00 |
○Valuation for an addition to a dwelling, with plumbing (per square foot) Flat fee $38.00 | $38.00 |
○Valuation for an addition to a dwelling, no plumbing (per square foot) Flat fee $35.00 | $35.00 |
○Valuation for a garage conversion to living space (per square foot) Flat fee $22.00 | $22.00 |
How this jurisdiction calculates the fee
The building permit fee is taken from the valuation of the work under Table 3-A in Section 15.72.230, plus a $75.00 administrative fee for each permit; the building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent. Table 3-F in Section 15.72.280 publishes the per-square-foot and per-linear-foot valuation figures used to arrive at that valuation.
Source: published fee schedule · Verified 9/30/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation for a balcony or sun deck (per square foot) Flat fee $18.00 | $18.00 |
○Valuation for a wood patio cover (per square foot) Flat fee $12.00 | $12.00 |
○Valuation for a wood patio cover with slab (per square foot) Flat fee $16.00 | $16.00 |
○Valuation for an aluminum patio cover (per square foot) Flat fee $7.00 | $7.00 |
○Valuation for a concrete slab (per square foot) Flat fee $6.00 | $6.00 |
○Valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The building permit fee is taken from the valuation of the work under Table 3-A in Section 15.72.230, plus a $75.00 administrative fee for each permit; the building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent. Table 3-F in Section 15.72.280 publishes the per-square-foot and per-linear-foot valuation figures used to arrive at that valuation.
Source: published fee schedule · Verified 9/30/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
○Receptacles; outlets; switches Flat fee $1.00 | $1.00 |
○Each light fixture Flat fee $0.50 | $0.50 |
○Electric range Flat fee $1.00 | $1.00 |
○Electric water heater Flat fee $1.00 | $1.00 |
○Clothes dryer outlet; automatic clothes washer outlet Flat fee $1.00 | $1.00 |
○Dishwasher outlet; garbage grinder outlet Flat fee $1.00 | $1.00 |
○Each special purpose outlet, such as a ceiling fan or barbecue Flat fee $1.00 | $1.00 |
○Permanently connected air conditioning services (heating/cooling) Flat fee $4.50 | $4.50 |
○Electric service, including first meter socket Flat fee $9.00 | $9.00 |
○Service over 200 up to 600 amperes Flat fee $19.00 | $19.00 |
○Service over 600 up to 1,200 amperes Flat fee $36.00 | $36.00 |
○Subpanels Flat fee $4.50 | $4.50 |
○Temporary power and lights, temporary pole Flat fee $9.00 | $9.00 |
○Swimming pool, residential Flat fee $29.00 | $29.00 |
Electrical sub-permit computed by the percentage method · add-on 18% of the building permit fee — select the permit fee line above to calculate | see rule |
○Inspections for which no fee is specifically indicated (per hour, minimum charge) Flat fee $100.00 | $100.00 |
○Additional plan review required by changes, additions or revisions to approved plans (per hour) Flat fee $80.00 | $80.00 |
How this jurisdiction calculates the fee
Electrical permits carry a $75.00 administrative fee for each permit plus the per-item charges in Table 3-B of Section 15.72.240. For an electrical sub-permit associated with a building permit, contractors may instead use the percentage method, and electrical permit and plan review fees may also be computed the same way as building permit and building plan review fees by using the cost of installation as the valuation amount when the work is not in the Table 3-B schedule.
Source: published fee schedule · Verified 9/30/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation for a masonry fence (per linear foot) Flat fee $16.00 | $16.00 |
○Valuation for a wood fence (per linear foot) Flat fee $13.00 | $13.00 |
○Valuation for a chain link fence (per linear foot) Flat fee $13.00 | $13.00 |
○Valuation for an ornamental iron fence (per linear foot) Flat fee $4.00 | $4.00 |
○Valuation for masonry planters (per linear foot) Flat fee $7.00 | $7.00 |
○Valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The building permit fee is taken from the valuation of the work under Table 3-A in Section 15.72.230, plus a $75.00 administrative fee for each permit; the building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent. Table 3-F in Section 15.72.280 publishes the per-square-foot and per-linear-foot valuation figures used to arrive at that valuation.
Source: published fee schedule · Verified 9/30/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation for a residential re-roof (per square foot, not per square) Flat fee $3.00 | $3.00 |
○Valuation for a commercial re-roof (per square foot, not per square) Flat fee $6.00 | $6.00 |
○Valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The building permit fee is taken from the valuation of the work under Table 3-A in Section 15.72.230, plus a $75.00 administrative fee for each permit; the building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent. Table 3-F in Section 15.72.280 publishes the per-square-foot and per-linear-foot valuation figures used to arrive at that valuation.
Source: published fee schedule · Verified 9/30/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Table 3-F valuation, retaining wall 3 feet, per linear foot Flat fee $11.00 | $11.00 |
○Table 3-F valuation, retaining wall 4 feet, per linear foot Flat fee $14.00 | $14.00 |
○Table 3-F valuation, retaining wall 5 feet, per linear foot Flat fee $17.00 | $17.00 |
○Table 3-F valuation, retaining wall 6 feet, per linear foot Flat fee $20.00 | $20.00 |
○Table 3-F valuation, retaining wall 8 feet, per linear foot Flat fee $27.00 | $27.00 |
○Table 3-A, valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Table 3-A, valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Table 3-A, valuation $2,001 to $3,000 Flat fee $109.00 | $109.00 |
○Table 3-A, valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Table 3-A, valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Table 3-A, valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Table 3-A, valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Table 3-A, valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Table 3-A, valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
Recording fee charged on each permit · add-on 3% of the permit fee, minimum $2.00 — select the permit fee line above to calculate | see rule |
○Additional plan review required by changes, additions or revisions to approved plans, or amendments to an existing permit (per hour) Flat fee $80.00 | $80.00 |
○Reinspection fee under Section 15.72.180H Flat fee $100.00 | $100.00 |
○Inspections for which no fee is specifically indicated (two-hour minimum for single family structures, four-hour minimum for commercial, industrial and multifamily) Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
North Las Vegas Municipal Code Chapter 15.72, Building Administrative Code. A retaining wall permit is a building permit: the fee is read off the valuation of the work in Table 3-A at Section 15.72.230, plus a $75.00 administrative fee for each permit and a recording fee of 3 percent of the permit fee. The building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent of the permit fee, both charged in addition. Table 3-F at Section 15.72.280 publishes the miscellaneous valuation data used to arrive at the valuation, listing retaining walls per linear foot by wall height.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation for a wood shed (per square foot) Flat fee $12.00 | $12.00 |
○Valuation for a metal shed (per square foot) Flat fee $10.00 | $10.00 |
○Valuation $1 to $500 Flat fee $29.00 | $29.00 |
○Valuation $901 to $1,000 Flat fee $50.00 | $50.00 |
○Valuation $4,001 to $5,000 Flat fee $143.00 | $143.00 |
○Valuation $9,001 to $10,000 Flat fee $169.00 | $169.00 |
○Valuation $24,001 to $25,000 Flat fee $290.00 | $290.00 |
○Valuation $49,001 to $50,000 Flat fee $408.00 | $408.00 |
Valuation $50,001 to $100,000 $408.00 for the first $50,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Valuation $100,001 and up $620.00 for the first $100,000.00, plus 150 x $3.30 for $150,000.00 over (rounded up per "or fraction thereof") = $1,115.00 | $1,115.00 |
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
Building plan review fee · add-on 65% of the building permit fee — select the permit fee line above to calculate | see rule |
Zoning plan review fee · add-on 10% of the permit fee — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The building permit fee is taken from the valuation of the work under Table 3-A in Section 15.72.230, plus a $75.00 administrative fee for each permit; the building plan review fee is 65 percent of the permit fee and the zoning plan review fee is 10 percent. Table 3-F in Section 15.72.280 publishes the per-square-foot and per-linear-foot valuation figures used to arrive at that valuation.
Source: published fee schedule · Verified 9/30/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative fee for each permit Flat fee $75.00 | $75.00 |
○Water heaters (gas) (electric) Flat fee $3.00 | $3.00 |
○Each gas appliance (any type) Flat fee $3.00 | $3.00 |
○Fuel piping system, single-family dwelling Flat fee $9.00 | $9.00 |
○Water distribution system, single-family dwelling Flat fee $9.00 | $9.00 |
○Solar energy system collector, including piping Flat fee $8.00 | $8.00 |
○Solar energy system storage tank (each) Flat fee $8.00 | $8.00 |
Plumbing sub-permit computed by the percentage method · add-on 18% of the building permit fee — select the permit fee line above to calculate | see rule |
○Electric water heater under Table 3-B electrical permit fees Flat fee $1.00 | $1.00 |
○Inspections for which no fee is specifically indicated (per hour, two-hour minimum) Flat fee $100.00 | $100.00 |
○Additional plan review required by changes, additions or revisions to approved plans (per hour) Flat fee $80.00 | $80.00 |
How this jurisdiction calculates the fee
Plumbing permits carry a $75.00 administrative fee for each permit plus the per-item charges in Table 3-D of Section 15.72.260. For a plumbing sub-permit associated with a building permit, contractors may instead use the percentage method, and plumbing permit and plan review fees may also be computed the same way as building permit and building plan review fees by using the cost of installation as the valuation amount when the work is not in the Table 3-D schedule.
Source: published fee schedule · Verified 9/30/2026
See the full write-up: North Las Vegas building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.