Home / Calculators / Building Permit Fee Calculator

Eugene, Oregon Building Permit Cost Calculator

Estimates permit cost in Eugene from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Valuation $1 - $2,000
$114.50 minimum fee
see rule
Valuation $2,001 - $25,000
$114.50 plus $12.30 for each addt'l $1,000 or fraction thereof
see rule
Valuation $25,001 - $50,000
$397.40 plus $9.44 for each addt'l $1,000 or fraction thereof
see rule
Valuation $50,001 - $100,000
$633.40 plus $6.84 for each addt'l $1,000 or fraction thereof
see rule
Valuation $100,001 and up
$975.40 plus $4.45 for each addt'l $1,000 or fraction thereof
see rule
Building plan check fee · add-on
65% of building permit fees — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

The building permit fee is based on project valuation; new residential construction is valued using the ICC Building Valuation Data Table current as of April 1 each year multiplied by the square footage of the dwelling, addition, garage, or accessory structure, while alterations and repairs are valued at the fair market value of all construction work covered by the permit.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

The building permit fee for a deck is based on the value of work, determined by multiplying the square footage of the deck by the current adopted building valuation table for decks in the ICC Square Foot Construction Cost Tables.

Source: published fee schedule · Verified 8/14/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Service or feeder installation, alteration, or relocation, 200 amps or less
Flat fee $137.25
$137.25
○Service or feeder, 201 amps to 400 amps
Flat fee $175.75
$175.75
○Service or feeder, 401 amps to 600 amps
Flat fee $250.25
$250.25
○Reconnect only
Flat fee $90.30
$90.30
○Branch circuits, new, alteration or extension, per panel, with purchase of service or feeder
Flat fee $10.30
$10.30
○First branch circuit, without purchase of service or feeder
Flat fee $81.80
$81.80
○Each additional branch circuit, without purchase of service or feeder
Flat fee $10.30
$10.30
○Residential new construction, single family, duplex, or multifamily per dwelling unit, 1,000 square feet or less, attached garage included, service included
Flat fee $250.50
$250.50
○Residential new construction, each additional 500 square feet or portion thereof
Flat fee $57.50
$57.50
○Each limited energy system installation
Flat fee $57.50
$57.50
○Minimum permit fee
Flat fee $114.50
$114.50
How this jurisdiction calculates the fee

Electrical permit fees are flat rates set by service or feeder amperage, number of branch circuits, and system type, with a $114.50 minimum permit fee, a plan check fee of 35% of electrical permit fees when plan check is performed, and a 12 percent State of Oregon surcharge collected and passed through to the State.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water heater permit, one- and two-family residential only, replacement of a water heater of similar size and location (includes one inspection)
Flat fee $72.00
$72.00
Alterations to existing one- and two-family dwelling plumbing systems, per fixture; listed fixtures include water heater
$29.20/fixture
see rule
How this jurisdiction calculates the fee

A flat permit fee applies to replacement of a water heater of similar size and location in a one- or two-family dwelling, alterations to existing one- and two-family dwelling plumbing systems are charged per fixture, and a 12 percent State of Oregon surcharge is collected on plumbing permit fees and passed through to the State.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Eugene building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.