Estimates permit cost in Eugene from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Valuation $1 - $2,000 $114.50 minimum fee | see rule |
Valuation $2,001 - $25,000 $114.50 plus $12.30 for each addt'l $1,000 or fraction thereof | see rule |
Valuation $25,001 - $50,000 $397.40 plus $9.44 for each addt'l $1,000 or fraction thereof | see rule |
Valuation $50,001 - $100,000 $633.40 plus $6.84 for each addt'l $1,000 or fraction thereof | see rule |
Valuation $100,001 and up $975.40 plus $4.45 for each addt'l $1,000 or fraction thereof | see rule |
Building plan check fee · add-on 65% of building permit fees — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The building permit fee is based on project valuation; new residential construction is valued using the ICC Building Valuation Data Table current as of April 1 each year multiplied by the square footage of the dwelling, addition, garage, or accessory structure, while alterations and repairs are valued at the fair market value of all construction work covered by the permit.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
How this jurisdiction calculates the fee
The building permit fee for a deck is based on the value of work, determined by multiplying the square footage of the deck by the current adopted building valuation table for decks in the ICC Square Foot Construction Cost Tables.
Source: published fee schedule · Verified 8/14/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Service or feeder installation, alteration, or relocation, 200 amps or less Flat fee $137.25 | $137.25 |
○Service or feeder, 201 amps to 400 amps Flat fee $175.75 | $175.75 |
○Service or feeder, 401 amps to 600 amps Flat fee $250.25 | $250.25 |
○Reconnect only Flat fee $90.30 | $90.30 |
○Branch circuits, new, alteration or extension, per panel, with purchase of service or feeder Flat fee $10.30 | $10.30 |
○First branch circuit, without purchase of service or feeder Flat fee $81.80 | $81.80 |
○Each additional branch circuit, without purchase of service or feeder Flat fee $10.30 | $10.30 |
○Residential new construction, single family, duplex, or multifamily per dwelling unit, 1,000 square feet or less, attached garage included, service included Flat fee $250.50 | $250.50 |
○Residential new construction, each additional 500 square feet or portion thereof Flat fee $57.50 | $57.50 |
○Each limited energy system installation Flat fee $57.50 | $57.50 |
○Minimum permit fee Flat fee $114.50 | $114.50 |
How this jurisdiction calculates the fee
Electrical permit fees are flat rates set by service or feeder amperage, number of branch circuits, and system type, with a $114.50 minimum permit fee, a plan check fee of 35% of electrical permit fees when plan check is performed, and a 12 percent State of Oregon surcharge collected and passed through to the State.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Water heater permit, one- and two-family residential only, replacement of a water heater of similar size and location (includes one inspection) Flat fee $72.00 | $72.00 |
Alterations to existing one- and two-family dwelling plumbing systems, per fixture; listed fixtures include water heater $29.20/fixture | see rule |
How this jurisdiction calculates the fee
A flat permit fee applies to replacement of a water heater of similar size and location in a one- or two-family dwelling, alterations to existing one- and two-family dwelling plumbing systems are charged per fixture, and a 12 percent State of Oregon surcharge is collected on plumbing permit fees and passed through to the State.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Eugene building permit cost