Philadelphia, Pennsylvania Building Permit Cost Calculator
Estimates permit cost in Philadelphia from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○New construction, residential one-or-two family Flat fee $1,328.00 | $1,328.00 |
New construction, other occupancies $253 for the first 500 sq. ft.; plus $73 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
New accessory structures or additions, residential one-or-two family $75 for the first 500 sq. ft.; plus $56 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
Alterations, residential one-or-two family $76 for the first 500 sq. ft.; plus $56 for each additional 100 sq. ft. over 500 | see rule |
Alterations, other occupancies $253 for the first 500 sq. ft.; plus $60 for each additional 100 sq. ft. over 500 | see rule |
Foundation only $253 (area up to 500 sq. ft.); $442 (area between 501 to 2,500 sq. ft.); $759 (area exceeding 2,500 sq. ft.) | see rule |
○General demolition $0.25 x 2,000 = $506.00 | $506.00 |
Site preparation (earth movement) $126 for areas up to 15,000 sq. ft.; $6.30 for each additional 1,000 sq. ft. over 15,000 sq. ft. (maximum $6,325) | see rule |
Certificate of occupancy No Additional Fee (as part of the Building Permit Process) | see rule |
Preliminary review $442 (three stories or less); $94 (each additional story above three) | see rule |
Items not listed · add-on 2% of construction value, (minimum $158) — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Building permit fees are charged by project category, with one set of rates for one-or-two-family residential work and another for all other occupancies, and area-based categories are priced on a base amount for an initial area plus an increment for each additional increment of area.
Source: published fee schedule · Verified 9/18/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Porch or deck flooring (maximum 200 sq. ft.), residential one-or-two family Flat fee $63.00 | $63.00 |
○Porch or deck flooring (maximum 200 sq. ft.), other occupancies Flat fee $69.00 | $69.00 |
New accessory structures or additions, residential one-or-two family $75 for the first 500 sq. ft.; plus $56 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
New accessory structures or additions, other occupancies $253 for the first 500 sq. ft.; plus $73 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
How this jurisdiction calculates the fee
Replacing porch or deck flooring up to 200 square feet is charged as a minor alteration at a flat rate, and building a new deck is charged under the new accessory structures or additions category based on floor area.
Source: published fee schedule · Verified 9/18/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Filing fee Flat fee $100.00 | $100.00 |
Permit fee $25 for each $1000 or fraction thereof of estimated electrical construction cost | see rule |
○Minimum permit fee Flat fee $63.00 | $63.00 |
○Maximum permit fee Flat fee $18,975.00 | $18,975.00 |
○City surcharge Flat fee $3.00 | $3.00 |
○State surcharge Flat fee $4.50 | $4.50 |
○Rough-in permit (optional) Flat fee $150.00 | $150.00 |
○Accelerated plan review (optional) Flat fee $1,050.00 | $1,050.00 |
○Record retention fee, per plan Flat fee $4.00 | $4.00 |
How this jurisdiction calculates the fee
A nonrefundable filing fee is due with the application and is counted toward the final permit fee, and the permit fee is charged per increment of estimated electrical construction cost, subject to a minimum and a maximum.
Source: published fee schedule · Verified 10/22/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Filing fee, lots containing one-or-two-family dwellings Flat fee $25.00 | $25.00 |
○Filing fee, fencing on all other sites Flat fee $100.00 | $100.00 |
○Zoning permit fee, lots containing one-or-two-family dwellings Flat fee $50.00 | $50.00 |
○Zoning permit fee, all other lots 30,000 sq. ft. or less Flat fee $253.00 | $253.00 |
○Zoning permit fee, all other lots over 30,000 sq. ft. Flat fee $632.00 | $632.00 |
○Building permit fee, each fence Flat fee $139.00 | $139.00 |
○Building permit fee, flat fee for one-or-two-family dwellings Flat fee $69.00 | $69.00 |
○City surcharge Flat fee $3.00 | $3.00 |
○State surcharge Flat fee $4.50 | $4.50 |
○Accelerated plan review (optional) Flat fee $2,000.00 | $2,000.00 |
○Record retention fee Flat fee $4.00 | $4.00 |
How this jurisdiction calculates the fee
A nonrefundable filing fee is due with the application, and separate zoning and building permit fees apply based on the site and the number of fences. LABEL IMPRECISION NOTED 2026-09-18 (lane B run 1482), no amount affected: every figure on this row re-verified verbatim on the cited phila.gov permit page today, but the line stored as "Record retention fee = $4.00" is printed by the City as a per-document charge, worded "Per page larger than 8.5 in. x 14 in.: $4" on the retaining-wall and fence permit pages and "Per plan: $4" on the plumbing permit page. The $4.00 is correct; the label drops the qualifier.
Source: published fee schedule · Verified 11/10/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Roof covering (replacement only), residential one-or-two family Flat fee $69.00 | $69.00 |
Roof covering (replacement only), other occupancies $76 for the first 4,000 sq. ft.; $3.80 for each additional 100 sq. ft. above 4,000 | see rule |
How this jurisdiction calculates the fee
Replacing a roof covering is charged as a minor alteration, at a flat rate for one-or-two-family residential buildings and by roof area for all other occupancies.
Source: published fee schedule · Verified 9/18/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Filing fee, sites containing one-or-two-family dwellings Flat fee $25.00 | $25.00 |
○Filing fee, all other sites Flat fee $100.00 | $100.00 |
○Walls between 2 ft. and 4 ft. tall Flat fee $158.00 | $158.00 |
○Walls 4 ft. and taller Flat fee $253.00 | $253.00 |
○Flat fee for one-or-two-family dwellings Flat fee $69.00 | $69.00 |
○City surcharge Flat fee $3.00 | $3.00 |
○State surcharge Flat fee $4.50 | $4.50 |
○Accelerated plan review (optional) Flat fee $2,000.00 | $2,000.00 |
○Record retention fee Flat fee $4.00 | $4.00 |
How this jurisdiction calculates the fee
A nonrefundable filing fee is due with the application and is applied toward the final permit fee, and the permit fee is based on the height of the retaining wall. LABEL IMPRECISION NOTED 2026-09-18 (lane B run 1482), no amount affected: every figure on this row re-verified verbatim on the cited phila.gov permit page today, but the line stored as "Record retention fee = $4.00" is printed by the City as a per-document charge, worded "Per page larger than 8.5 in. x 14 in.: $4" on the retaining-wall and fence permit pages and "Per plan: $4" on the plumbing permit page. The $4.00 is correct; the label drops the qualifier.
Source: published fee schedule · Verified 11/10/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
New accessory structures or additions, residential one-or-two family $75 for the first 500 sq. ft.; plus $56 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
New accessory structures or additions, other occupancies $253 for the first 500 sq. ft.; plus $73 for each additional 100 sq. ft. or fraction thereof above 500 | see rule |
How this jurisdiction calculates the fee
A shed that requires a permit is charged under the new accessory structures or additions category, based on floor area, with separate rates for one-or-two-family residential sites and all other occupancies.
Source: published fee schedule · Verified 9/18/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Filing fee Flat fee $100.00 | $100.00 |
○Water heater Flat fee $37.00 | $37.00 |
○Water heater, one-or-two-family homes Flat fee $31.00 | $31.00 |
○City surcharge Flat fee $3.00 | $3.00 |
○State surcharge Flat fee $4.50 | $4.50 |
○Rough-in permit (optional) Flat fee $150.00 | $150.00 |
○Record retention fee Flat fee $4.00 | $4.00 |
How this jurisdiction calculates the fee
A nonrefundable filing fee is due with the application and is applied toward the final permit fee, and the water heater permit fee is a flat amount that is lower for one-or-two-family homes. LABEL IMPRECISION NOTED 2026-09-18 (lane B run 1482), no amount affected: every figure on this row re-verified verbatim on the cited phila.gov permit page today, but the line stored as "Record retention fee = $4.00" is printed by the City as a per-document charge, worded "Per page larger than 8.5 in. x 14 in.: $4" on the retaining-wall and fence permit pages and "Per plan: $4" on the plumbing permit page. The $4.00 is correct; the label drops the qualifier.
Source: published fee schedule · Verified 9/18/2026
See the full write-up: Philadelphia building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.