Home / Calculators / Building Permit Fee Calculator

Pittsburgh, Pennsylvania Building Permit Cost Calculator

Estimates permit cost in Pittsburgh from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

The city sets no flat fee for any individual permit type. Every construction permit is priced from the total construction value of the project. For residential work the base permit fee is $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000. Forty percent of the base fee is collected when the application is filed and is not refundable, and the balance falls due when the permit is issued. A State Education and Training Fund charge, a digital record retention charge and a technology fee scaled to the size of the base fee are added to every permit. Amounts are from the 2026 fee schedule of the Department of Permits, Licenses, and Inspections, effective January 1, 2026.

Source: published fee schedule · Verified 11/16/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Uncovered deck no higher than 30 inches off the ground
No building permit required; zoning approval only
see rule
○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

An uncovered deck whose floor sits no higher than 30 inches off the ground needs only zoning approval. Every other deck needs both a building permit and an occupancy permit, and construction drawings must be filed for anything other than a single-storey wooden deck standing 8 feet or less from finished grade to the finished deck surface. The city publishes no deck-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons that apply to every permit. Amounts are from the 2026 fee schedule effective January 1, 2026.

Source: published fee schedule · Verified 9/30/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Electrical trade license
$90.00 initial and annual renewal
see rule
Trade license late fee
$50.00 each license
see rule
○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

Electrical permits cover repairs, extensions and new installations in single-family and two-family homes and their accessory buildings,. No separate electrical amount is published. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Construction drawings are required for service work rated above 400 amperes. An electrical trade license costs $90.00 to obtain and $90.00 each year to renew. Amounts are from the 2026 fee schedule effective January 1, 2026.

Source: published fee schedule · Verified 9/30/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Residential Zoning Review
$1.00/$1000 of project cost (min. $50.00, max $40,000.00)
see rule
Residential Amendment Zoning Review
$1.00/$1000 change of project value (min. $50.00, max $40,000.00)
see rule
○Technology Fee, base permit fee $0 - $200.00
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $200.01 - $1,000.00
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001.00 - $10,000.00
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,000.01+
Flat fee $25.00
$25.00
○Property Certification
Flat fee $100.00
$100.00
○Zoning Research (hr)
Flat fee $100.00
$100.00
○Administrator Exception
Flat fee $100.00
$100.00
○Zoning Board of Adjustment
Flat fee $400.00
$400.00
How this jurisdiction calculates the fee

Department of City Planning zoning and development review fees are calculated based on the total construction value of the proposed development. Provenance corrected on 2026-09-03: this row previously cited the Department of Permits, Licenses and Inspections 2026 fee schedule, which contains no zoning or planning fees at all. Every amount on this row was re-confirmed on the Department of City Planning Fee Schedule page (last updated 07/08/2026), and fee_source_url now points there. No amount changed.

Source: published fee schedule · Verified 9/29/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

Replacing a roof covering is not among the works the city exempts, so a permit is required, and no roofing-specific amount is published. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons that apply to every permit. Amounts are from the 2026 fee schedule effective January 1, 2026.

Source: published fee schedule · Verified 9/29/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Retaining wall 4 feet or less, no surcharge
No permit required
see rule
○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

A retaining wall standing 4 feet or less, gauged from the lowest grade up to the wall's crest, needs no permit unless it carries a surcharge or impounds flammable or combustible liquids. Taller walls and walls carrying a surcharge do need one, and the city publishes no wall-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Amounts are from the 2026 fee schedule effective January 1, 2026.

Source: published fee schedule · Verified 11/16/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Detached single-storey accessory building within 200 square feet
No building permit required
see rule
○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

A detached, single-storey accessory building used for storage or similar purposes is exempt from the building and development application so long as its floor area stays within 200 square feet. Anything larger needs a permit, and the city publishes no shed-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Amounts are from the 2026 fee schedule effective January 1, 2026.

Source: published fee schedule · Verified 11/16/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

City plumbing permit
Not issued by the City; plumbing is permitted by the Allegheny County Health Department under Article XV
see rule
○Base permit fee, residential
$6.00 x 250 = $1,500.00
$1,500.00
○Base permit fee, commercial
$7.00 x 250 = $1,750.00
$1,750.00
Payment split on every permit · add-on
40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate
see rule
○Permit amendment, residential
$6.00 x 250 = $1,500.00
$1,500.00
○State Education & Training Fund (SETF)
Flat fee $4.50
$4.50
○Digital Record Retention Fee
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $0 - $200
Flat fee $2.00
$2.00
○Technology Fee, base permit fee $201 - $1,000
Flat fee $5.00
$5.00
○Technology Fee, base permit fee $1,001 - $10,000
Flat fee $15.00
$15.00
○Technology Fee, base permit fee $10,001+
Flat fee $25.00
$25.00
Third Party Agency Discount · add-on
15% of base fee on applicable permit types — select the permit fee line above to calculate
see rule
○New Certificate of Occupancy, residential
Flat fee $130.00
$130.00
Residential Accelerated Plan Review · add-on
1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate
see rule
Residential Overtime Inspection
$150.00 three-hour minimum, $58.00 each additional hour
see rule
○Board of Appeals Hearing (Residential Structure)
Flat fee $175.00
$175.00
Residential Pre-Application Plan Review Meeting · add-on
0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate
see rule
○License Holder Change Amendment
Flat fee $50.00
$50.00
○Allegheny County Health Department fixture replacement card (water heater)
Flat fee $27.00
$27.00
○Allegheny County Health Department fixture fee (includes water heaters)
Flat fee $22.00
$22.00
○Allegheny County Health Department re-inspection
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

The Department of Permits, Licenses, and Inspections issues no plumbing permit at all, so the city publishes no water heater fee. Plumbing work in Pittsburgh is permitted instead by the Allegheny County Health Department under Article XV of its rules and regulations, which covers water heater installation and bills on its own county schedule rather than a city one. Where the job involves fuel gas work, that part falls under the city mechanical permit, which carries no flat amount either and is priced at the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. City amounts are from the 2026 fee schedule effective January 1, 2026. Plumbing in Pittsburgh is permitted by the Allegheny County Health Department under Article XV rather than by the City, and ACHD does publish the amounts: its Plumbing Fee Schedule effective January 1, 2023 sets a $27.00 fixture replacement card for water heaters and a $22.00 fixture fee. Those figures are added here so a homeowner is not left without a number. | 2026-09-14 (lane B run 1131): this row draws on TWO agencies and both were verified. Nineteen figures come from the City of Pittsburgh PLI 2026 Fee Schedule (EFFECTIVE 1/1/2026), read directly as PDF. The three Allegheny County Health Department figures are not city fees and are not in the PLI schedule; they were confirmed against the ACHD plumbing fee schedule at https://www.alleghenycounty.us/files/assets/county/v/1/government/health/documents/plumbing_fee_schedule.pdf (Effective January 1, 2023), which prints "Fixture Replacement Cards (hot water heaters & fixtures) $27", "Fixture Fees (including fixtures, fire sprinkler heads, water heaters, building sewer, and water service itemized in plans) $22" and "Re-inspection Fee $75". Pittsburgh does not issue plumbing permits; ACHD permits plumbing under Article XV, so the two-agency split in this row is correct. | 2026-09-30 (lane B run 1822) CITATION GAP CLOSED, NO FIGURE CHANGED. The three Allegheny County Health Department lines on this row were carried with no citable URL: the Pittsburgh 2026 Fee Schedule contains the string "Allegheny" nowhere at all, so a reader following either cited URL would never have found them. All three now verify verbatim in the ACHD Plumbing Fee Schedule, https://www.alleghenycounty.us/files/assets/county/v/1/government/health/documents/plumbing_fee_schedule.pdf, headed "PLUMBING FEE SCHEDULE (Effective Jan. 1, 2023)" and linked as current from the ACHD Project Plans and Permitting page: "Fixture Fees ... $22" (the line itself states it includes water heaters), "Fixture Replacement Cards (hot water heaters & fixtures) ... $27", "Re-inspection Fee ... $75". Method note for the next pass: alleghenycounty.us returns HTTP 403 to curl and its /Services/Health-Department/Plumbing-Program/Plumbing-Fees path is a 404; the schedule is reachable only by following the Health Department index to /Services/Permits-and-Licenses/Plumbing-Permit, which redirects to Plumbing-Program/Project-Plans-and-Permitting, and fetching the PDF with a browser context. Every Pittsburgh city figure on this row re-reads verbatim in the cited 2026 Fee Schedule, EFFECTIVE 1/1/2026.

Source: published fee schedule · Verified 9/30/2026

See the full write-up: Pittsburgh building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.