Pittsburgh, Pennsylvania Building Permit Cost Calculator
Estimates permit cost in Pittsburgh from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
The city sets no flat fee for any individual permit type. Every construction permit is priced from the total construction value of the project. For residential work the base permit fee is $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000. Forty percent of the base fee is collected when the application is filed and is not refundable, and the balance falls due when the permit is issued. A State Education and Training Fund charge, a digital record retention charge and a technology fee scaled to the size of the base fee are added to every permit. Amounts are from the 2026 fee schedule of the Department of Permits, Licenses, and Inspections, effective January 1, 2026.
Source: published fee schedule · Verified 11/16/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Uncovered deck no higher than 30 inches off the ground No building permit required; zoning approval only | see rule |
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
An uncovered deck whose floor sits no higher than 30 inches off the ground needs only zoning approval. Every other deck needs both a building permit and an occupancy permit, and construction drawings must be filed for anything other than a single-storey wooden deck standing 8 feet or less from finished grade to the finished deck surface. The city publishes no deck-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons that apply to every permit. Amounts are from the 2026 fee schedule effective January 1, 2026.
Source: published fee schedule · Verified 9/30/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Electrical trade license $90.00 initial and annual renewal | see rule |
Trade license late fee $50.00 each license | see rule |
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Electrical permits cover repairs, extensions and new installations in single-family and two-family homes and their accessory buildings,. No separate electrical amount is published. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Construction drawings are required for service work rated above 400 amperes. An electrical trade license costs $90.00 to obtain and $90.00 each year to renew. Amounts are from the 2026 fee schedule effective January 1, 2026.
Source: published fee schedule · Verified 9/30/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Residential Zoning Review $1.00/$1000 of project cost (min. $50.00, max $40,000.00) | see rule |
Residential Amendment Zoning Review $1.00/$1000 change of project value (min. $50.00, max $40,000.00) | see rule |
○Technology Fee, base permit fee $0 - $200.00 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $200.01 - $1,000.00 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001.00 - $10,000.00 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,000.01+ Flat fee $25.00 | $25.00 |
○Property Certification Flat fee $100.00 | $100.00 |
○Zoning Research (hr) Flat fee $100.00 | $100.00 |
○Administrator Exception Flat fee $100.00 | $100.00 |
○Zoning Board of Adjustment Flat fee $400.00 | $400.00 |
How this jurisdiction calculates the fee
Department of City Planning zoning and development review fees are calculated based on the total construction value of the proposed development. Provenance corrected on 2026-09-03: this row previously cited the Department of Permits, Licenses and Inspections 2026 fee schedule, which contains no zoning or planning fees at all. Every amount on this row was re-confirmed on the Department of City Planning Fee Schedule page (last updated 07/08/2026), and fee_source_url now points there. No amount changed.
Source: published fee schedule · Verified 9/29/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
Replacing a roof covering is not among the works the city exempts, so a permit is required, and no roofing-specific amount is published. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons that apply to every permit. Amounts are from the 2026 fee schedule effective January 1, 2026.
Source: published fee schedule · Verified 9/29/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Retaining wall 4 feet or less, no surcharge No permit required | see rule |
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
A retaining wall standing 4 feet or less, gauged from the lowest grade up to the wall's crest, needs no permit unless it carries a surcharge or impounds flammable or combustible liquids. Taller walls and walls carrying a surcharge do need one, and the city publishes no wall-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Amounts are from the 2026 fee schedule effective January 1, 2026.
Source: published fee schedule · Verified 11/16/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Detached single-storey accessory building within 200 square feet No building permit required | see rule |
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
A detached, single-storey accessory building used for storage or similar purposes is exempt from the building and development application so long as its floor area stays within 200 square feet. Anything larger needs a permit, and the city publishes no shed-specific amount. The charge is the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. Amounts are from the 2026 fee schedule effective January 1, 2026.
Source: published fee schedule · Verified 11/16/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
City plumbing permit Not issued by the City; plumbing is permitted by the Allegheny County Health Department under Article XV | see rule |
○Base permit fee, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○Base permit fee, commercial $7.00 x 250 = $1,750.00 | $1,750.00 |
Payment split on every permit · add-on 40% of base fee non-refundable at application, remainder at issuance — select the permit fee line above to calculate | see rule |
○Permit amendment, residential $6.00 x 250 = $1,500.00 | $1,500.00 |
○State Education & Training Fund (SETF) Flat fee $4.50 | $4.50 |
○Digital Record Retention Fee Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $0 - $200 Flat fee $2.00 | $2.00 |
○Technology Fee, base permit fee $201 - $1,000 Flat fee $5.00 | $5.00 |
○Technology Fee, base permit fee $1,001 - $10,000 Flat fee $15.00 | $15.00 |
○Technology Fee, base permit fee $10,001+ Flat fee $25.00 | $25.00 |
Third Party Agency Discount · add-on 15% of base fee on applicable permit types — select the permit fee line above to calculate | see rule |
○New Certificate of Occupancy, residential Flat fee $130.00 | $130.00 |
Residential Accelerated Plan Review · add-on 1.0% of value of construction (min. $500, max. $9,200) — select the permit fee line above to calculate | see rule |
Residential Overtime Inspection $150.00 three-hour minimum, $58.00 each additional hour | see rule |
○Board of Appeals Hearing (Residential Structure) Flat fee $175.00 | $175.00 |
Residential Pre-Application Plan Review Meeting · add-on 0.25% of project value (min. $125, max. $7,000) — select the permit fee line above to calculate | see rule |
○License Holder Change Amendment Flat fee $50.00 | $50.00 |
○Allegheny County Health Department fixture replacement card (water heater) Flat fee $27.00 | $27.00 |
○Allegheny County Health Department fixture fee (includes water heaters) Flat fee $22.00 | $22.00 |
○Allegheny County Health Department re-inspection Flat fee $75.00 | $75.00 |
How this jurisdiction calculates the fee
The Department of Permits, Licenses, and Inspections issues no plumbing permit at all, so the city publishes no water heater fee. Plumbing work in Pittsburgh is permitted instead by the Allegheny County Health Department under Article XV of its rules and regulations, which covers water heater installation and bills on its own county schedule rather than a city one. Where the job involves fuel gas work, that part falls under the city mechanical permit, which carries no flat amount either and is priced at the ordinary residential base permit fee of $6.00 for each $1,000 of construction value, with a floor of $130 and a ceiling of $8,000, plus the per-permit add-ons. City amounts are from the 2026 fee schedule effective January 1, 2026. Plumbing in Pittsburgh is permitted by the Allegheny County Health Department under Article XV rather than by the City, and ACHD does publish the amounts: its Plumbing Fee Schedule effective January 1, 2023 sets a $27.00 fixture replacement card for water heaters and a $22.00 fixture fee. Those figures are added here so a homeowner is not left without a number. | 2026-09-14 (lane B run 1131): this row draws on TWO agencies and both were verified. Nineteen figures come from the City of Pittsburgh PLI 2026 Fee Schedule (EFFECTIVE 1/1/2026), read directly as PDF. The three Allegheny County Health Department figures are not city fees and are not in the PLI schedule; they were confirmed against the ACHD plumbing fee schedule at https://www.alleghenycounty.us/files/assets/county/v/1/government/health/documents/plumbing_fee_schedule.pdf (Effective January 1, 2023), which prints "Fixture Replacement Cards (hot water heaters & fixtures) $27", "Fixture Fees (including fixtures, fire sprinkler heads, water heaters, building sewer, and water service itemized in plans) $22" and "Re-inspection Fee $75". Pittsburgh does not issue plumbing permits; ACHD permits plumbing under Article XV, so the two-agency split in this row is correct. | 2026-09-30 (lane B run 1822) CITATION GAP CLOSED, NO FIGURE CHANGED. The three Allegheny County Health Department lines on this row were carried with no citable URL: the Pittsburgh 2026 Fee Schedule contains the string "Allegheny" nowhere at all, so a reader following either cited URL would never have found them. All three now verify verbatim in the ACHD Plumbing Fee Schedule, https://www.alleghenycounty.us/files/assets/county/v/1/government/health/documents/plumbing_fee_schedule.pdf, headed "PLUMBING FEE SCHEDULE (Effective Jan. 1, 2023)" and linked as current from the ACHD Project Plans and Permitting page: "Fixture Fees ... $22" (the line itself states it includes water heaters), "Fixture Replacement Cards (hot water heaters & fixtures) ... $27", "Re-inspection Fee ... $75". Method note for the next pass: alleghenycounty.us returns HTTP 403 to curl and its /Services/Health-Department/Plumbing-Program/Plumbing-Fees path is a 404; the schedule is reachable only by following the Health Department index to /Services/Permits-and-Licenses/Plumbing-Permit, which redirects to Plumbing-Program/Project-Plans-and-Permitting, and fetching the PDF with a browser context. Every Pittsburgh city figure on this row re-reads verbatim in the cited 2026 Fee Schedule, EFFECTIVE 1/1/2026.
Source: published fee schedule · Verified 9/30/2026
See the full write-up: Pittsburgh building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.