846 Concrete ...................................................................... 702 Fine Aggregate, Size No. 23 ........................................ 904.02 Fly Ash ........................................................................ 901.02 Geogrid, Type III ......................................................... 918.05 Geotextile .................................................................... 918.02 200 Portland Cement .......................................................... 901.01(b) Structure Backfill ........................................................ 211.03.1 Water ........................................................................... 913.01 * Admixtures in accordance with ASTM C1372 may be used for the modular block if approved by the Engineer. Aggregate for the leveling pad shall be compacted aggregate No. 53 and shall be in accordance with applicable requirements of 303. Drainage fill used immediately behind the modular block wall, as shown on the plans, shall be coarse aggregate No. 8 crushed stone in accordance with 904.03. 210 Backfill material used in the modular bl ock wall volume shall be structure backfill Type 3 in accordance with 211. Where ground reinforcement is required, nominal size aggregate No. 30 shall not be used. The size of the structure backfill selected for use in the reinforced area of the modular bloc k volume shall remain the same for that wall’s volume. If coarse aggregate No. 8 is used, and soil, B borrow, structural backfill, or coarse aggregate No. 53 are to be placed above the coarse aggregate No. 8, a single layer of geotextile shall be placed on top of the coarse aggregate No. 8 in accordance with 616.11. If ground reinforcement is required, it shall be either steel in accordance with
910.07 or geogrid. The ground reinforcement supplied shall be the same type as that used with the pullout test and shall be consistent throughout the contract work. If the ground reinforcement is steel, structure backfill shall be in accordance with the backfill requirements for retaining wall systems contained in 211.03.1.
732.06 General Requirements
The wall supplier representative shall provide technical instruction, guidance in 310 pre-construction activities including the pre-construction conference, and on-site technical assistance to the Contractor during construction. 732.07 Foundation Preparation The foundation for the modular block wall shall be graded level for the width shown on the plans. Foundation preparation shall otherwise be in accordance with
731.07 At each foundation level, an aggregate leveling pad shall be provided as shown on the plans. 320
732.08 Retaining Wall Excavation Excavation shall be in accordance with 731.08. 732.09 Wall Erection Modular block wall units shall be stored to minimize contact with the ground or
being covered by standing wate r. Modular block wall units having face discoloration shall not be used. The Contractor shall perform the necessary work to verify that the foundation is 330 at the correct elevation, that the wall is constructed to the correct alignment, and that the work is in accordance with the specified tolerances. Modular block wall units shall be placed in successive horizontal lifts in the sequence shown on the plans as backfill placement proceeds. As backfill material is 732.06 849 placed behind the units, the units shall be maintained in vertical position. Horizontal alignment tolerances shall not exceed 3/4 in. when measured with a 10 ft straightedge. Alignment shall be checked at each layer of modular block wall units after the backfill behind the modular block wall units has been compacted, and the results shall be recorded. Checking of alignments and tolerances shall include verifying that the 340 modular block wall units are plumb over the entire height of the wall. Ground reinforcement shall be placed no rmal to the face of the wall, unless otherwise shown on the plans and shall be constructed in accordance with 214.04.
732.10 Backfill Placement
Backfill placement shall fo llow erection of each course of modular block wall units. All sheeting and bracing shall be removed as the backfilling progresses. Backfill shall be placed to avoid damage or distur bance to the wall materials or misalignment of the modular block wall units. All material for backfill shall be subject to approval 350 and shall be free from large or frozen lumps, wood, or other undesirable material. Wall materials that become damaged or disturbed during backfill placement shall be removed and replaced or corrected as directed. All misalignment or distortion of the modular block wall units due to placement of backfill outside the limits described herein shall be corrected as directed. The work shall also include backfilling beyond the theoretical length of the ground reinforcement in accordance with the details shown on the plans, and the disposal of surplus of unsuitable excavated materials, as allowed. 360 Backfill placement and compaction shall otherwise be in accordance with 731.11.
732.11 Method of Measurement
The measurement of concrete modular block wall units with or without ground reinforcement and wall erection will be based on the square foot area contained within the neat line limits of the wall envelope shown on the plans and not that of the wall system supplier. Common excavation will be measured by the cubic yard in accordance with 203.27(a) to the neat lines shown on the plan s. Structure backfill and B borrow will be 370 measured in accordance with 211. 09. Unsuitable foundation materials, if found, will be measured in accordance with 211.09. Coarse aggregate No. 8 used as drainage fill will be measured by the cubic yard based on the theoretical volume to the neat lines as shown on the plans. Compacted aggregate No. 53, and ground reinforcement will not be measured. Geotextile materials will not be measured. Drainage of the backfill including piping and geotextile materials used in the drainage system will not be measured.
732.12 Stockpiled Modular Block Units
Partial payment may be made for block wall units stockpiled on the project site or 380 at the Contractor’s approved storage location. Partial payment will include the 732.12 850 delivered cost of the units, as verified by invoices that include freight charges. The Contractor shall furnish the invoices. The partial payment will not exceed 75% of the contract unit price for modular block wall with or without ground reinforcement. Prior to authorizing partial payment, the Engineer will verify th at the units are in accordance with 732.05(a). 732.13 Basis of Payment The accepted quantities of modular block wall units wi th or without ground reinforcement will be paid for at the contract unit price per square foot. Erection of 390 modular block wall units will be paid for by the square foot. Common excavation will be paid for in accordance with 203.28. Stru cture backfill and B borrow will be paid for in accordance with 211.10. Unsuitable foundation materials will be paid for in accordance with 211.10. The accep ted quantities of coarse aggregate No. 8 used as drainage fill will be paid for as aggregate for drainage fill at the contract unit price per cubic yard, complete in place. Payment will be made under: Pay Item Pay Unit Symbol 400 Aggregate for Drainage Fill ....................................................... CYS Modular Block Wall Erection.................................................... SFT Modular Block Wall with Ground Reinforcement .................... SFT Modular Block Wall .................................................................. SFT The cost of designing the wall system, services including the testing laboratory, certified testing personnel, and the testing and inspection of modular block wall units shall be included in the cost of the pay items of this section. 410 The cost of materials, ground reinfor cement if required, fasteners, cutting or altering the ground reinforc ement at the site, repair or replacement of units damaged or removed due to backfill placement, compressive-strength retesting if required, retesting or replacing failed block units, and incidentals shall be included in the cost of the pay items of this section. The cost of all labor and materials required for preparing the wall foundation, compacted aggregate No. 53, co arse aggregate No. 8 placed outside the neat lines as shown on the plans, replacement material s damaged during backfill placement if required, and erecting the modular block units shall be included in the cost of wall 420 erection. The cost of all labor and materials for geotextiles shall be included in the cost of the pay items of this section. 732.13