892Temporary Worksite Speed Limit Sign Assembly, _____ ........ EACH

IN · 2024 Standard SpecificationsBook pages 910912View official source ↗

Sign Assembly, _____ ........ EACH type Tubular Marker, Permanent ....................................................... EACH Each construction sign, barricade, temporary worksite speed limit sign assembly, road closure sign assembly, or flashing arrow sign will be paid for only once regardless of how many times each is moved, replaced, or how many times each is altered to change the sign message within each project. Payment will be made for signs placed in, or relocated to, a separate project. Payment will not be made for signs or barricades 1150 used for the convenience of the Contractor. If a temporary worksite speed limit sign assembly, for intermittent use is not flashing when required beginning 2 h after work begins, or if such assembly is flashing when no work has been taking place for 2 h or longer, $200.00 will be deducted from payment for such work for each 4 h period or part thereof, beginning after the 2 h grace period. Temporary mounted construction signs will not be paid for. 1160 Replacement of snowplowable raised pa vement marker casti ngs damaged due to removing reflectors will not be paid for. Electric energy necessary to power luminaires and fixed temporary signals will not be paid for. The cost of furnishing all materials, erection, maintenance, removal, and necessary incidentals shall be incl uded in the cost of barricades. The cost of furnishing, installing, maintaining, and subsequent removal of the 1170 detour marker, route marker, or street or road name sign, cardinal directional marker, directional arrow marker, posts which support the assembly, and all necessary hardware shall be included in the cost of detour route marker assembly or detour route marker assembly, multiple routes. The cost of all materials, equipment, labor, and incidentals necessary to install, maintain, repair, and to remove the unit shall be included in the cost of energy absorbing terminal, CZ. The cost of stockpiling standby terminals and terminal materials, whether incorporated into the work or not, shall be included in the cost of energy absorbing terminal, CZ. All units shall remain the property of the Contractor 1180 upon completion of the contract. The cost of the excavation required for placement of compacted aggregate shoulders No. 73 will be included in the pay item maintaining traffic. If the compacted aggregate No. 73 required for shoulders is removed, the cost of such removal shall be included in th e cost of the compacted aggregate. 801.18 893 If the Contractor elects to use more than two simultaneous operations during the installation of snowplowable pavement markers or reflectors, the cost of required 1190 traffic protection devices for additional operations shall be included in the cost of maintaining traffic. The cost of necessary flaggers; automa ted flagger assistance devices; protection of traffic at structure foundations; and furnishing, erecting, placing, maintaining, relocating, and removing lights, cones, flexible channelizers, tubular markers, drums, delineators, or other devices as directed shall be included in the cost of maintaining traffic. The cost of furnishing and placing cones or tubular markers in accordance with 1200

801.08and drums in accordance with 801.09, the watcher in accordance with 107.12,

repair or replacement of damaged or inopera tive traffic control devices, and traffic maintenance in accordance with 104.04 shall be included in the cost of maintaining traffic. Additional materials necessary to place th e portable changeable message sign in a secure and level manner for site conditions shall be included in the cost of the pay item. All costs to furnish, install, program, activate, deactivate, change messages, move, replace, and maintain the PCMS shall be included in the cost of the pay item. The cost of IP cellular phone service shall be included in the cost of the pay item. 1210 The cost of the vehicle detection, solar panel, battery cabinet, program timing module, signal heads, wiring, trailer, and all hardware required shall be included in the cost of the portable signal. The cost of installing, maintaining, an d subsequent removal of signs, construction warning lights, assembly supports, and all n ecessary hardware shall be included in the cost of road closure sign assembly.

The cost of installation, maintenance, and removal or closure of the temporary 1220 crossover, including excavation, compaction, subgrade preparation, and reshaping damaged median area shall be included in the cost of temporary crossover. The cost of removal of earth cover, removal of drums, reshaping damaged median areas, and closure or removal of temporary crossover shall be included in the cost of temporary crossover, refurbish. The cost of placement, maintenance and replacement of temporary pavement markings shall be included in the cost of the markings. 1230 The cost of cleaning existing pavement and removal of buzz strips shall be included in the cost of buzz strips. Damage to the pavement caused by removal of buzz 801.18 894 strips and temporary pavement markings shall be repaired as directed with no additional payment.

No payment will be made for temporary pavement markings which are in the standard pavement marking pattern, and which are to be in service from December 1 through the following March 31 due to the Contractor’s failure to complete the work as scheduled. However, payment will be made for these markings if the failure to complete the work as scheduled is due to conditions beyond the Contractor’s control. 1240

The cost of furnishing, installing, maintaining, and subsequent removal of temporary raised pavement marker shall be included in the cost of temporary raised pavement marker. The cost of delineation of temporary traffic barrier shall be included in the cost of temporary traffic barrier. Damage done to pavement by removal of temporary traffic barriers and anchors shall be repaired with no additional payment. 1250

Source: Indiana Standard Specifications, 2024 Edition. Pages 910912 of 1,248.