Traffic Control (800-899)

893If the Contractor elects to use more than two simultaneous operations during the

IN · 2024 Standard SpecificationsBook pages 911912View official source ↗

If the Contractor elects to use more than two simultaneous operations during the installation of snowplowable pavement markers or reflectors, the cost of required 1190 traffic protection devices for additional operations shall be included in the cost of maintaining traffic. The cost of necessary flaggers; automa ted flagger assistance devices; protection of traffic at structure foundations; and furnishing, erecting, placing, maintaining, relocating, and removing lights, cones, flexible channelizers, tubular markers, drums, delineators, or other devices as directed shall be included in the cost of maintaining traffic. The cost of furnishing and placing cones or tubular markers in accordance with 1200

801.08and drums in accordance with 801.09, the watcher in accordance with 107.12,

repair or replacement of damaged or inopera tive traffic control devices, and traffic maintenance in accordance with 104.04 shall be included in the cost of maintaining traffic. Additional materials necessary to place th e portable changeable message sign in a secure and level manner for site conditions shall be included in the cost of the pay item. All costs to furnish, install, program, activate, deactivate, change messages, move, replace, and maintain the PCMS shall be included in the cost of the pay item. The cost of IP cellular phone service shall be included in the cost of the pay item. 1210 The cost of the vehicle detection, solar panel, battery cabinet, program timing module, signal heads, wiring, trailer, and all hardware required shall be included in the cost of the portable signal. The cost of installing, maintaining, an d subsequent removal of signs, construction warning lights, assembly supports, and all n ecessary hardware shall be included in the cost of road closure sign assembly.

The cost of installation, maintenance, and removal or closure of the temporary 1220 crossover, including excavation, compaction, subgrade preparation, and reshaping damaged median area shall be included in the cost of temporary crossover. The cost of removal of earth cover, removal of drums, reshaping damaged median areas, and closure or removal of temporary crossover shall be included in the cost of temporary crossover, refurbish. The cost of placement, maintenance and replacement of temporary pavement markings shall be included in the cost of the markings. 1230 The cost of cleaning existing pavement and removal of buzz strips shall be included in the cost of buzz strips. Damage to the pavement caused by removal of buzz 801.18 894 strips and temporary pavement markings shall be repaired as directed with no additional payment.

No payment will be made for temporary pavement markings which are in the standard pavement marking pattern, and which are to be in service from December 1 through the following March 31 due to the Contractor’s failure to complete the work as scheduled. However, payment will be made for these markings if the failure to complete the work as scheduled is due to conditions beyond the Contractor’s control. 1240

The cost of furnishing, installing, maintaining, and subsequent removal of temporary raised pavement marker shall be included in the cost of temporary raised pavement marker. The cost of delineation of temporary traffic barrier shall be included in the cost of temporary traffic barrier. Damage done to pavement by removal of temporary traffic barriers and anchors shall be repaired with no additional payment. 1250

Source: Indiana Standard Specifications, 2024 Edition. Pages 911912 of 1,248.