Home / Calculators / Building Permit Fee Calculator

Chicago, Illinois Building Permit Cost Calculator

Estimates permit cost in Chicago from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Construction factor, Groups R-1, R-2 and R-3, Type V construction
$0.63 x 2,000 = $1,260.00
$1,260.00
○Construction factor, Groups R-4 and R-5, Type V construction
$0.44 x 2,000 = $880.00
$880.00
○Construction factor, Group U, Type V construction
$0.23 x 2,000 = $460.00
$460.00
New construction, Group R, maximum of 4 stories and maximum of 3 dwelling units (scope-of-review factor 0.75)
Minimum fee $2,450
see rule
New construction, Group R, detached private garage or carport, in addition to the fee for the primary residence (scope-of-review factor 0.5)
Minimum fee $600
see rule
Rehabilitation, nonstructural repair (scope-of-review factor 0.25)
Minimum fee $600
see rule
Rehabilitation, roof repair, roof recover, or roof replacement with structural repair (scope-of-review factor 0.25)
Minimum fee $900
see rule
Rehabilitation, structural repair as the entire scope of work, other than residential buildings with 1 to 3 dwelling units and no mixed occupancy (scope-of-review factor 0.5)
Minimum fee $900
see rule
Rehabilitation, ordinary demolition
Minimum fee $600
see rule
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
○Minimum fee, permits for temporary structures
Flat fee $302.00
$302.00
How this jurisdiction calculates the fee

The fee for a permit reviewed under plans is the construction factor for the building's occupancy group and construction type, multiplied by the scope-of-review factor for the type of work, multiplied by the area of work in square feet, and each scope of work carries a published minimum fee.

Source: published fee schedule · Verified 9/18/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Limited repair, replacement of up to 25% of existing material
Flat fee $75.00
$75.00
○Repair, replacement of 26% to 50% of existing material
Flat fee $150.00
$150.00
○Reconstruction, same size and location
Flat fee $300.00
$300.00
○Replacement of an enclosed porch with an open porch, same size and location
Flat fee $300.00
$300.00
○New deck, ramp, or exterior stairs, no more than 6 feet above the ground
Flat fee $300.00
$300.00
Plan-based review, Group R, installation or alteration of porch, balcony, deck, exterior stair, or occupiable rooftop (scope-of-review factor 0.5)
Minimum fee $250 per unit served
see rule
In-kind repair or replacement of an entire porch, deck or stair system no more than 6 feet above the ground with a landing area of 50 square feet or less, residential building up to 4 stories
No building permit required and no fee
see rule
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
How this jurisdiction calculates the fee

Chicago prices porch and deck work as a stand-alone permit under Table 14A-12-1204.2, at a flat fee per structure set by how much of the existing structure is replaced. Work reviewed under plans instead is priced as Group R rehabilitation at scope of review factor 0.5. No building permit is required in a residential building up to 4 stories above grade to repair or replace in kind an entire exterior porch, deck or stair system that is no more than 6 feet above the ground and has a landing area of 50 square feet or less. The stand-alone fee table was last amended by the City Council on December 19, 2025 and the plan-based fee tables took effect January 6, 2026. | HELD 2026-09-30 (lane B run 1822, pipeline run 100), verified_at deliberately NOT advanced. DEFECT FOUND: THE CITED EXPRESS PERMIT PROGRAM PAGES NO LONGER PRINT ANY FEE AMOUNT. All three chicago.gov Express Permit Program pages this row depends on (EPP/PLUMB.html, EPP/PORCH.html, EPP/GARAGE.html and the bldg-permit-not-required FAQ) return HTTP 200 and were rendered in a real browser with every accordion and disclosure expanded: not one of them contains a dollar sign. The EPP landing page and the permit-fees FAQ carry none either. The other cited document, 2026 Amended Permit Fee Tables (Effective January 6, 2026, issued 2026-10-01 per Section 14A-12-1204.3.1 and updated 2025-12-23 for Ordinance SO2025-0021719), was read in full and contains no Express Permit Program flat-fee table; its only related line is "Installation or alteration of porch, balcony, deck, exterior stair, $250 per unit". So the flat EPP amounts stored on the Chicago rows ($75, $150 and $300 per structure; $125 wrecking a detached garage; $500 detached private garage) are currently UNSOURCED by anything this lane can reach. Nothing was rewritten - inventing a replacement is exactly what this lane must not do. HUMAN ACTION: find where Chicago now publishes Express Permit Program fees and re-cite these three rows, or drop the flat amounts and keep only the fee-table-based figures. METHOD LESSON WORTH KEEPING: an earlier automated pass of this batch scored the deck row 7/7 because the literal string "150" appears on the porch page inside "150 square feet" - a bare number match against prose is not a fee verification, and the amount must be read with its label and its dollar sign. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Installation of up to 10 new circuits on a single service disconnecting means
Flat fee $150.00
$150.00
○Installation of 11 to 20 new circuits on a single service disconnecting means
Flat fee $300.00
$300.00
○Installation of 21 to 40 new circuits on a single service disconnecting means
Flat fee $600.00
$600.00
○Installation of 41 to 80 new circuits on a single service disconnecting means
Flat fee $1,500.00
$1,500.00
○Installation of 81 new circuits or more on a single service disconnecting means
Flat fee $2,250.00
$2,250.00
○Installation of electrical service disconnecting means only, less than 400 amps
Flat fee $75.00
$75.00
○Installation of electrical service disconnecting means only, 400 to less than 1,000 amps
Flat fee $300.00
$300.00
○Installation of electrical service disconnecting means only, 1,000 amps or more
Flat fee $750.00
$750.00
○Repair or alteration of devices on existing electrical circuits
Flat fee $75.00
$75.00
○Installation of low-voltage electrical system within or serving single dwelling unit
Flat fee $75.00
$75.00
○Installation of emergency lighting system
Flat fee $125.00
$125.00
○Solar panel installation (less than 13.44 kW) with or without installation of energy storage system (up to 20 kWh)
Flat fee $225.00
$225.00
○Solar panel installation (13.44 kW or greater) (no energy storage system)
Flat fee $250.00
$250.00
○Installation of permanent power generator for residential building with 3 or fewer dwelling units (no mixed occupancy)
Flat fee $75.00
$75.00
○Temporary power generators, electrical services, or service disconnecting means
Flat fee $150.00
$150.00
○Electrical maintenance monthly permit (per building, per 30 days)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Electrical work is priced as a stand-alone permit under Table 14A-12-1204.2, with separate flat fees for new circuits, service disconnecting means, low-voltage systems, generators and solar. Where a permit application covers more than one listed scope of work, the total fee includes each applicable fee. The table was last amended by the City Council on December 19, 2025. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Installation of fence up to 6 feet high, any length, any material except masonry
Flat fee $75.00
$75.00
○Installation of fence over 6 feet high, any length, any material
Flat fee $300.00
$300.00
○Installation of freestanding masonry wall, any height or length
Flat fee $300.00
$300.00
○Installation of non-masonry trash enclosure
Flat fee $150.00
$150.00
○Installation of masonry trash enclosure
Flat fee $300.00
$300.00
Fence no more than 5 feet above the ground measured on both sides that conforms to the Chicago Zoning Ordinance
No building permit required and no fee
see rule
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
How this jurisdiction calculates the fee

Fences, freestanding walls and trash enclosures are priced as a stand-alone permit under Table 14A-12-1204.2 at a flat fee that does not vary with length. No building permit is required to install a fence that is no more than 5 feet above the ground measured on both sides and conforms to the Chicago Zoning Ordinance, to remove such a fence, or to maintain an existing fence by painting or replacing limited damaged elements. A zoning fee is required for a fence over 6 feet, a freestanding masonry wall and a trash enclosure. The table was last amended by the City Council on December 19, 2025. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Roof repair
Flat fee $175.00
$175.00
Roof recover (no tear off)
$175 per area up to 5,000 square feet
see rule
Roof replacement
$450 per area up to 5,000 square feet
see rule
○Installation, alteration, or repair for a rooftop structure
Flat fee $175.00
$175.00
Plan-based review, rehabilitation, roof repair, roof recover, or roof replacement with structural repair (scope-of-review factor 0.25)
Minimum fee $900
see rule
Roof repair, recover or replacement on a roof with a pitch of at least 2:12, residential building up to 4 stories above grade
No building permit required and no fee
see rule
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
How this jurisdiction calculates the fee

Roofing is priced as a stand-alone permit under Table 14A-12-1204.2, with recover and replacement charged per area up to 5,000 square feet. No building permit is required on a residential building up to 4 stories above grade to repair, recover or replace a roof with a pitch of at least 2:12, and no building permit is required on any building for roof repair limited to 25 percent of the area of a roof surface that does not cut away or remove part of an exterior wall or roof; a permit is required for any structural repair and any work on low-slope roofs. Roof work that includes structural repair is instead reviewed under plans as rehabilitation at scope of review factor 0.25. The stand-alone fee table was last amended by the City Council on December 19, 2025. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Construction factor, Group U, Type V construction
$0.23 x 2,000 = $460.00
$460.00
New construction, Group U, single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall, not covered in Table 14A-12-1204.2 (scope-of-review factor 0.75)
Minimum fee $300
see rule
Rehabilitation, Group U, Level 2 or 3 alteration to a single-story building or structure not more than 15 feet above the ground, such as a parking lot, bridge, bus shelter, or retaining wall, not covered in Table 14A-12-1204.2 (scope-of-review factor 0.75)
Minimum fee $300
see rule
How this jurisdiction calculates the fee

A retaining wall reviewed under plans is treated as a Group U structure, and the fee is the construction factor for the construction type multiplied by the scope-of-review factor for the work multiplied by the area of work in square feet, subject to the published minimum fee.

Source: published fee schedule · Verified 9/18/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Single-story detached tool or storage shed, open gazebo or playhouse, no plumbing, not more than 15 feet tall, footprint 150 square feet or less
No building permit required and no fee published
see rule
○Detached private garage or carport of frame construction up to 600 square feet in building area, not more than 12 feet in building height, and without occupiable rooftop (includes electrical work and wrecking of existing private garage or carport, if any)
Flat fee $500.00
$500.00
○Wrecking detached private garage or carport
Flat fee $125.00
$125.00
○Plan-based review, construction factor, Group U, Type V construction
$0.23 x 2,000 = $460.00
$460.00
Plan-based review, new construction, Group U, single-story building or structure not more than 15 feet above the ground, not covered in Table 14A-12-1204.2 (scope-of-review factor 0.75)
Minimum fee $300
see rule
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
How this jurisdiction calculates the fee

Table 14A-12-1204.2 publishes no fee for a shed, because no building permit is required to install, alter or remove a single-story detached structure that is not more than 15 feet tall, has no plumbing, is used as a tool or storage shed, open gazebo, playhouse or similar use or is purely decorative, and has a footprint of 150 square feet or less. A larger accessory building is charged the published stand-alone fee if it matches the detached private garage or carport category, and is otherwise reviewed under plans as a Group U structure. The table was last amended by the City Council on December 19, 2025. | HELD 2026-09-30 (lane B run 1822, pipeline run 100), verified_at deliberately NOT advanced. DEFECT FOUND: THE CITED EXPRESS PERMIT PROGRAM PAGES NO LONGER PRINT ANY FEE AMOUNT. All three chicago.gov Express Permit Program pages this row depends on (EPP/PLUMB.html, EPP/PORCH.html, EPP/GARAGE.html and the bldg-permit-not-required FAQ) return HTTP 200 and were rendered in a real browser with every accordion and disclosure expanded: not one of them contains a dollar sign. The EPP landing page and the permit-fees FAQ carry none either. The other cited document, 2026 Amended Permit Fee Tables (Effective January 6, 2026, issued 2026-10-01 per Section 14A-12-1204.3.1 and updated 2025-12-23 for Ordinance SO2025-0021719), was read in full and contains no Express Permit Program flat-fee table; its only related line is "Installation or alteration of porch, balcony, deck, exterior stair, $250 per unit". So the flat EPP amounts stored on the Chicago rows ($75, $150 and $300 per structure; $125 wrecking a detached garage; $500 detached private garage) are currently UNSOURCED by anything this lane can reach. Nothing was rewritten - inventing a replacement is exactly what this lane must not do. HUMAN ACTION: find where Chicago now publishes Express Permit Program fees and re-cite these three rows, or drop the flat amounts and keep only the fee-table-based figures. METHOD LESSON WORTH KEEPING: an earlier automated pass of this batch scored the deck row 7/7 because the literal string "150" appears on the porch page inside "150 square feet" - a bare number match against prose is not a fee verification, and the amount must be read with its label and its dollar sign. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Repair or in-kind replacement of a hot water heater in a residential building up to 4 stories above grade or an associated accessory building on the same lot
No building permit required and no fee
see rule
Repair or in-kind replacement of hot water heater (individual equipment) or plumbing fixtures without alteration to plumbing in walls
$75 per dwelling unit, toilet room, or tenant space
see rule
○Repair or in-kind replacement of hot water heater serving more than one dwelling unit or tenant space without alteration to plumbing in walls
Flat fee $150.00
$150.00
Repair or in-kind replacement of plumbing piping, with or without plumbing fixture replacement, all occupancies
$150 per dwelling unit, toilet room, or tenant space
see rule
○Plumbing maintenance monthly permit (per building, per 30 days)
Flat fee $75.00
$75.00
○Minimum fee, all permits other than temporary structures
Flat fee $602.00
$602.00
How this jurisdiction calculates the fee

No building permit is required to repair or replace in kind a hot water heater in a residential building up to 4 stories above grade or an associated accessory building on the same lot. Where a permit is required, the work is priced as a stand-alone permit under Table 14A-12-1204.2 at a flat fee per dwelling unit, toilet room or tenant space, and a higher flat fee applies to a heater serving more than one dwelling unit or tenant space. Altering, reconfiguring or extending an existing plumbing system, and any work involving a water meter, are outside the stand-alone plumbing permit. The table was last amended by the City Council on December 19, 2025. | HELD 2026-09-30 (lane B run 1822, pipeline run 100), verified_at deliberately NOT advanced. DEFECT FOUND: THE CITED EXPRESS PERMIT PROGRAM PAGES NO LONGER PRINT ANY FEE AMOUNT. All three chicago.gov Express Permit Program pages this row depends on (EPP/PLUMB.html, EPP/PORCH.html, EPP/GARAGE.html and the bldg-permit-not-required FAQ) return HTTP 200 and were rendered in a real browser with every accordion and disclosure expanded: not one of them contains a dollar sign. The EPP landing page and the permit-fees FAQ carry none either. The other cited document, 2026 Amended Permit Fee Tables (Effective January 6, 2026, issued 2026-10-01 per Section 14A-12-1204.3.1 and updated 2025-12-23 for Ordinance SO2025-0021719), was read in full and contains no Express Permit Program flat-fee table; its only related line is "Installation or alteration of porch, balcony, deck, exterior stair, $250 per unit". So the flat EPP amounts stored on the Chicago rows ($75, $150 and $300 per structure; $125 wrecking a detached garage; $500 detached private garage) are currently UNSOURCED by anything this lane can reach. Nothing was rewritten - inventing a replacement is exactly what this lane must not do. HUMAN ACTION: find where Chicago now publishes Express Permit Program fees and re-cite these three rows, or drop the flat amounts and keep only the fee-table-based figures. METHOD LESSON WORTH KEEPING: an earlier automated pass of this batch scored the deck row 7/7 because the literal string "150" appears on the porch page inside "150 square feet" - a bare number match against prose is not a fee verification, and the amount must be read with its label and its dollar sign. === 2026-10-01, THE RUN 1822 CHICAGO DEFECT IS NOW PRECISELY DIAGNOSED, AND A SUCCESSOR IS PUBLISHED BUT NOT YET IN FORCE. (1) WHY THE FLAT FEES ARE UNSOURCED AMONG OUR CITATIONS: the cited 2026%20Amended%20Permit%20Fee%20Tables.pdf returns HTTP 200 (265,446 bytes, 13 pages) and reads "Building Permit Fee Tables / Effective January 6, 2026 / Issued October 1, 2025, pursuant to Section 14A-12-1204.3.1 of the Chicago Construction Codes Administrative Provisions and updated December 23, 2025, to reflect amendments enacted by Ordinance SO2025-0021719". It is issued under 14A-12-1204.3.1 ONLY, so it contains just the PLAN-BASED tables 14A-12-1204.3(1) through (6). It references "Table 14A-12-1204.2" four times but does not reproduce it, and Table 14A-12-1204.2 Stand-Alone Permit Fees is exactly where every flat per-permit amount on this row comes from. So the stand-alone figures are not in the document we cite, which is why no amount matcher can find them and why the EPP pages run 1822 rendered print no dollar sign at all. The sibling file 2026%20Bldg%20Permit%20Fee%20Tables.pdf also returns 200 (773,807 bytes) but is watermarked SUPERSEDED, reads "Effective January 1, 2026", is likewise issued under 14A-12-1204.3.1 only, and also lacks Table 14A-12-1204.2. Chicago published no 2026 stand-alone fee table on that asset path. (2) THE FIGURES ARE NONETHELESS CORROBORATED, NOT GUESSED: the 2027 schedule does carry Table 14A-12-1204.2, and every amount in it is a clean CPI uplift from exactly the amounts stored here, which is strong independent evidence that these 2026 values are the real ones. (3) SUCCESSOR, FINAL AND ADOPTED BUT FUTURE-DATED, SO DELIBERATELY NOT WRITTEN IN: https://www.chicago.gov/content/dam/city/depts/bldgs/general/Permitfees/2027%20Bldg%20Permit%20Fee%20Tables.pdf (293,854 bytes, 18 pages) reads "Building Permit Fee Tables / Effective January 1, 2027 / Issued September 28, 2026, pursuant to Sections 14A-12-1204.2.1 and 14A-12-1204.3.1" - note it is issued under BOTH sections and therefore DOES contain Table 14A-12-1204.2. It was announced by the Department of Buildings code alert "2027 Fees" dated September 28, 2026, which states the rates "will be applicable January 1, 2027" under the Municipal Code provisions requiring annual CPI adjustment. CONFIRMED 2027 REPLACEMENTS ALREADY READ OFF THE NEW TABLE: roof repair $175 to $185; roof recover (no tear off) $175 to $185 per area up to 5,000 sq ft; roof replacement $450 to $475 per area up to 5,000 sq ft; emergency lighting system $125 to $130; wrecking a detached private garage or carport $125 to $130; solar panel 13.44 kW or greater $250 to $265 per array; low-voltage system $75 to $80 per system; administrative change of owner or contractor $80 per permit. The $602 all-permit minimum is UNCHANGED in 2027, and a $302 minimum now applies to temporary-structure permits. RE-CHECK CHICAGO IMMEDIATELY AFTER 2027-01-01 AND REWRITE FROM THE 2027 TABLES, WHICH WILL ALSO FINALLY GIVE THESE FLAT FEES A CITABLE SOURCE. (4) STILL BLOCKED: the authoritative code text at codelibrary.amlegal.com sits behind a Cloudflare proof-of-work challenge, which was NOT solved, so the 2026 stand-alone table could not be cited from the code itself this pass. METHOD NOTE: the earlier report of a 404 on this citation was an artefact of dropping the .pdf extension from the stored URL; with the extension the asset is a clean 200. Always probe the stored URL verbatim.

Source: published fee schedule · Verified 10/1/2026

See the full write-up: Chicago building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.