Cook County, Illinois Building Permit Cost Calculator
Estimates permit cost in Cook County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○New construction - minimum fee Flat fee $73.50 | $73.50 |
○New construction - per 1,000 cubic feet at or below 50,000 cubic feet Flat fee $37.50 | $37.50 |
○New construction - per 1,000 cubic feet above 50,000 cubic feet Flat fee $40.00 | $40.00 |
○Engineering review - residential, typical Flat fee $300.00 | $300.00 |
○Engineering review - residential in floodplain or wetlands Flat fee $600.00 | $600.00 |
○Contractor's business registration - initial Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
New construction is charged by building volume rather than valuation. The county's fee schedule sets a minimum new-construction fee of $73.50, then $37.50 for each 1,000 cubic feet for projects at or below 50,000 cubic feet and $40.00 for each 1,000 cubic feet above that, measured from the basement to the highest part of the roof including all projections. Alterations, remodeling and miscellaneous construction instead carry a $73.50 minimum plus $18.50 for each additional $1,000 of estimated cost above $5,000. Separate architectural, engineering and site plan reviews apply - residential engineering review is $300.00, rising to $600.00 where floodplain, wetlands or other restricted uses are involved - and contractors must pay a $150.00 initial business registration.
Source: published fee schedule · Verified 9/15/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Alterations, remodeling and miscellaneous construction - minimum fee Flat fee $73.50 | $73.50 |
○Each additional $1,000 of estimated cost above $5,000 Flat fee $18.50 | $18.50 |
○Residential permit application deposit Flat fee $100.00 | $100.00 |
Permit extension · add-on 10% of original permit cost or $25.00, whichever is greater — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
This work is priced under the county's alterations, remodeling and miscellaneous construction category, which carries a minimum fee of $73.50 plus $18.50 for each additional $1,000 of estimated cost above $5,000. The estimated cost is based on the signed contracts between the owner and all contractors, though the Building Commissioner may allow it to be based on materials only. A permit extension costs 10% of the original permit cost or $25.00, whichever is greater, and a residential application deposit of $100 is collected up front toward review.
Source: published fee schedule · Verified 9/15/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Single-family dwelling electrical - 800 to 1,599 square feet Flat fee $147.00 | $147.00 |
○Single-family dwelling electrical - 2,000 square feet and over $0.10 x 2,000 = $200.00 | $200.00 |
○Residential service installation - 100 to 200 amp Flat fee $225.00 | $225.00 |
○Residential service installation - 200 to 400 amp Flat fee $400.00 | $400.00 |
○Minimum electrical inspection fee Flat fee $150.00 | $150.00 |
○Electrical plan review, per half hour (half hour minimum) Flat fee $25.00 | $25.00 |
How this jurisdiction calculates the fee
Residential electrical permits for single-family dwellings are priced by conditioned floor area: $94.50 for 0 to 499 square feet, $115.50 for 500 to 799, $147.00 for 800 to 1,599, $178.50 for 1,600 to 1,999, and $0.10 per square foot at 2,000 square feet and over. A detached garage is $150.00 and low voltage systems such as smoke detectors, cable, data, intercom, security and central vacuum are $150.00 per system. Service installations are separate: a residential 100 to 200 amp service is $225.00 and 200 to 400 amp is $400.00, with temporary service at $150.00. Electrical plan review runs $25.00 per half hour with a half hour minimum, and the minimum electrical inspection fee is $150.00.
Source: published fee schedule · Verified 9/15/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Alterations and miscellaneous construction - minimum fee Flat fee $73.50 | $73.50 |
○Each additional $1,000 of estimated cost above $5,000 Flat fee $18.50 | $18.50 |
○Residential permit application deposit Flat fee $100.00 | $100.00 |
How this jurisdiction calculates the fee
The fee schedule has no separate fence line, so a fence permit is priced under the general alterations, remodeling and miscellaneous construction category: a $73.50 minimum plus $18.50 for each additional $1,000 of estimated cost above $5,000. Because most residential fences fall under the $5,000 threshold, the $73.50 minimum is typically the whole building fee. A $100 residential deposit is taken at application. Confirm the exact category with the department, since the schedule does not name fences explicitly.
Source: published fee schedule · Verified 9/15/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Alterations, remodeling and miscellaneous construction - minimum fee Flat fee $73.50 | $73.50 |
○Each additional $1,000 of estimated cost above $5,000 Flat fee $18.50 | $18.50 |
○Residential permit application deposit Flat fee $100.00 | $100.00 |
Permit extension · add-on 10% of original permit cost or $25.00, whichever is greater — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
This work is priced under the county's alterations, remodeling and miscellaneous construction category, which carries a minimum fee of $73.50 plus $18.50 for each additional $1,000 of estimated cost above $5,000. The estimated cost is based on the signed contracts between the owner and all contractors, though the Building Commissioner may allow it to be based on materials only. A permit extension costs 10% of the original permit cost or $25.00, whichever is greater, and a residential application deposit of $100 is collected up front toward review.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Alterations and miscellaneous construction - minimum fee Flat fee $73.50 | $73.50 |
○Engineering review - residential, typical Flat fee $300.00 | $300.00 |
○Engineering review - residential in floodplain or wetlands Flat fee $600.00 | $600.00 |
○Architectural site plan review - residential, typical Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
There is no retaining wall line on the fee schedule. The work falls under alterations, remodeling and miscellaneous construction at a $73.50 minimum plus $18.50 for each additional $1,000 of estimated cost above $5,000. Where the wall changes site grade or drainage, engineering review is charged separately at $300.00 for typical residential uses and $600.00 for residential sites in floodplain, wetlands or other restricted uses, and architectural site plan review for typical residential uses is $150.00.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Private garages and sheds - minimum fee Flat fee $73.50 | $73.50 |
○Each additional $1,000 of estimated cost above $5,000 Flat fee $18.50 | $18.50 |
○Residential permit application deposit Flat fee $100.00 | $100.00 |
○Electrical permit for a detached garage Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Sheds and private garages have their own line on the county fee schedule, carrying a minimum fee of $73.50. Where the project scope extends beyond that base - larger structures or associated alterations - the alterations and miscellaneous construction schedule adds $18.50 for each additional $1,000 of estimated cost above $5,000. A $100 residential application deposit is collected up front and credited toward the review.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Water heaters (each) Flat fee $75.00 | $75.00 |
○Plumbing - minimum fee (plus $20.00 per fixture over five) Flat fee $143.60 | $143.60 |
○Replacement of existing fixtures (plus $20.00 per fixture over five) Flat fee $100.80 | $100.80 |
○Water supply connection to existing supply - new construction Flat fee $100.80 | $100.80 |
○Septic system - new construction Flat fee $126.00 | $126.00 |
How this jurisdiction calculates the fee
The plumbing fee schedule lists water heaters at $75.00 each. Where the job is a broader plumbing permit rather than a single appliance, the plumbing minimum fee is $143.60 plus $20.00 for every fixture in excess of five, and replacement of existing fixtures is $100.80 plus $20.00 per fixture above five. Related water and sewer work is priced separately - a connection to an existing water supply for new construction is $100.80 and a new septic system is $126.00.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Cook County building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.