B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Akron, Ohio Building Permit Cost Calculator

Estimates permit cost in Akron from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Summit County residential new construction/addition
$145 application fee plus $6 per 100 sq. ft.
see rule
Summit County residential alterations or accessory building
$60 application fee plus $6 per 100 sq. ft., minimum $25
see rule
Summit County commercial new construction/addition
$167 application fee plus $6 per 100 sq. ft.
see rule
Summit County commercial alterations
$102 application fee plus $6 per 100 sq. ft.
see rule
Ohio Board of Building Standards (OBBS) surcharge added to the permit fee
1% residential / 3% commercial
see rule
○Re-inspection for each failed inspection, first and second
Flat fee $30.00
$30.00
○Re-inspection, third
Flat fee $60.00
$60.00
○Re-inspection, fourth
Flat fee $80.00
$80.00
City of Akron refundable project deposit (residential) - dwelling, new
$1,500 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (residential) - addition or accessory structure
$50 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - new building / addition / alteration
$3,500 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - interior alteration only
$1,500 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - fire alarm only
$100 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - fire suppression only
$100 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - certificate of occupancy request only
$100 refundable deposit, not a permit charge
see rule
City of Akron refundable project deposit (commercial) - signage package only
$50 refundable deposit, not a permit charge
see rule
Penalty where work is commenced before the permit is issued (Akron Cod. Ord. Sec. 190.210(B))
All permit fees tripled
see rule
How this jurisdiction calculates the fee

Building permits for property in Akron are issued by the Summit County Division of Building Standards, which absorbed the City of Akron Building Department in 2009; the county cannot issue a permit without City of Akron approval first. The county permit fee is an application fee plus a per-100-square-foot charge, set separately for residential and commercial work and for new construction/additions versus alterations, with an Ohio Board of Building Standards surcharge added (1 percent residential, 3 percent commercial) and a re-inspection charge for each failed inspection. Separately, the City of Akron collects a refundable project deposit at its plan review stage, sized by project type; the City requires a W-9 so its Finance Department can issue the refund. Akron Codified Ordinances Sec. 190.210 fixes no dollar amounts - it delegates permit fees to the Director of Public Service and makes them available at the building inspection division - and it triples all permit fees where work is commenced before the permit is issued. PROVENANCE FIXED 2026-09-12: the Summit County figures on this row (residential new construction/addition $145 + $6 per 100 sq ft; residential alterations or accessory building $60 + $6 per 100 sq ft, minimum $25; commercial new construction/addition $167 + $6 per 100 sq ft; commercial alterations $102 + $6 per 100 sq ft; OBBS surcharge 1% residential / 3% commercial; re-inspections $30 / $30 / $60 / $80) are not on the cited Akron page and previously had no citation. All of them verify verbatim against the Summit County Division of Building Standards permit application and FEE SCHEDULE (buildingpermit-updated-2024.pdf), which fee_source_url now records. The City of Akron refundable project deposits and the Cod. Ord. 190.210(B) fee-tripling penalty verify on the cited Akron page. NOTE: co.summitoh.net was restructured and the old /index.php/departments/building-standards/fees path now 404s; the live document is served under /files-generic/.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Summit County residential accessory structures application fee
Flat fee $45.00
$45.00
○Summit County residential accessory structure, each deck (also gazebo, handicap ramp, tent)
Flat fee $60.00
$60.00
○Summit County commercial accessory structures application fee
Flat fee $67.00
$67.00
○Summit County commercial accessory structure, each deck (also gazebo, handicap ramp, tent, commercial sign)
Flat fee $72.00
$72.00
Ohio Board of Building Standards (OBBS) surcharge added to the permit fee
1% residential / 3% commercial
see rule
○Re-inspection for each failed inspection, first and second
Flat fee $30.00
$30.00
○Re-inspection, third
Flat fee $60.00
$60.00
○Re-inspection, fourth
Flat fee $80.00
$80.00
○City of Akron project deposit - addition or accessory structure
Flat fee $50.00
$50.00
Penalty where work is commenced before the permit is issued (Akron Cod. Ord. Sec. 190.210(B))
All permit fees tripled
see rule
How this jurisdiction calculates the fee

A residential deck in Akron is permitted by the Summit County Division of Building Standards as an accessory structure: a flat accessory-structure application fee plus a flat charge for each deck, with the Ohio Board of Building Standards surcharge added (1 percent residential, 3 percent commercial) and a re-inspection charge for each failed inspection. Before the county issues the permit the applicant must supply City of Akron zoning approval, local health department approval where the property is on well and/or septic, and a current Summit County contractor registration (a homeowner may act as contractor via a homeowner affidavit). The City of Akron separately collects a $50 project deposit for an addition or accessory structure at its review stage.

Source: published fee schedule · Verified 11/4/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Application fee (residential)
Flat fee $60.00
$60.00
New construction (residential)
$4/100 SQ. FT
see rule
Interior alterations (residential)
$2/100 SQ. FT
see rule
○Miscellaneous circuits (residential)
Flat fee $12.00
$12.00
○Temporary pole, service upgrade, interior/exterior lighting (residential)
Flat fee $40.00
$40.00
○Miscellaneous repairs (residential)
Flat fee $40.00
$40.00
Meter pull for siding (residential)
$40 NO APP FEE
see rule
○Re-inspection, first and second
Flat fee $30.00
$30.00
○Re-inspection, third
Flat fee $60.00
$60.00
○Re-inspection, fourth
Flat fee $80.00
$80.00
How this jurisdiction calculates the fee

Residential electrical permits combine a $60 application fee with per-square-foot or per-item charges, with a 1% OBBS fee added; re-inspection fees apply to each failed inspection. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both Summit County permit documents returned HTTP 200 and were read in full; both are footed "REV. 03.24" (March 2024), unchanged, and every stored figure and rate re-reads verbatim. No supersession.

Source: published fee schedule · Verified 11/12/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Akron requires no permit at all for a fence six feet or less in height. A fence over six feet requires a building permit from the Summit County Division of Building Standards plus City of Akron approval, for which the applicant submits a site plan showing the proposed fence location through Akron Plan Review and Permits. A confirmed absence of a published price: no fence-specific fee is published by either authority - the City of Akron CITY CENTRAL permit fee list has no fence entry, and the Summit County Building Permit Application fee schedule (rev. 4/24) itemises no fence line, so the county quotes the charge from its general residential building permit schedule when the application is made. Akron Codified Ordinances Sec. 190.210 fixes no amounts, delegating permit fees to the Director of Public Service, and triples all permit fees where work begins before the permit is issued. Separate from the permit question, Akron zoning limits fencing within twenty feet of the public right-of-way to thirty inches in height unless it is at least eighty-five percent see-through.

Source: published fee schedule · Verified 8/11/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Re-roof (residential)
$40 + APP FEE
see rule
○Application fee (residential)
Flat fee $50.00
$50.00
How this jurisdiction calculates the fee

A residential re-roof permit is charged a flat fee plus the residential application fee, with a 1% OBBS fee added.

Source: published fee schedule · Verified 11/4/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Summit County residential alterations or accessory building
$60 application fee plus $6 per 100 sq. ft., minimum $25
see rule
Summit County commercial alterations (accessory building on commercial property)
$102 application fee plus $6 per 100 sq. ft.
see rule
Ohio Board of Building Standards (OBBS) surcharge added to the permit fee
1% residential / 3% commercial
see rule
○Re-inspection for each failed inspection, first and second
Flat fee $30.00
$30.00
○Re-inspection, third
Flat fee $60.00
$60.00
○Re-inspection, fourth
Flat fee $80.00
$80.00
○City of Akron project deposit - addition or accessory structure
Flat fee $50.00
$50.00
Penalty where work is commenced before the permit is issued (Akron Cod. Ord. Sec. 190.210(B))
All permit fees tripled
see rule
How this jurisdiction calculates the fee

A shed in Akron is permitted by the Summit County Division of Building Standards as a residential accessory building, charged at an application fee plus a per-100-square-foot rate subject to a floor, with the Ohio Board of Building Standards surcharge added (1 percent residential) and a re-inspection charge for each failed inspection. Sheds are not in the county flat-rate accessory-structure list, which names only decks, gazebos, handicap ramps and tents, so the accessory-building line applies rather than the flat per-structure charge. City of Akron zoning approval is required before the county issues the permit, and the City separately collects a $50 project deposit for an addition or accessory structure at its review stage.

Source: published fee schedule · Verified 11/5/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Hot water tank replacement (residential)
Flat fee $40.00
$40.00
○Application fee (residential)
Flat fee $60.00
$60.00
○Gas line (residential)
Flat fee $40.00
$40.00
○Repair/replacement (residential)
Flat fee $40.00
$40.00
How this jurisdiction calculates the fee

A residential water heater replacement is charged per tank under a plumbing permit, plus the residential application fee, with a 1% OBBS fee added. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both Summit County permit documents returned HTTP 200 and were read in full; both are footed "REV. 03.24" (March 2024), unchanged, and every stored figure and rate re-reads verbatim. No supersession.

Source: published fee schedule · Verified 11/12/2026

See the full write-up: Akron building permit cost