The cost of forms, PVC for bridge floor drains, falsework, falsework piling, centering, expansion joints, preformed expansion joint filler, waterproofing, curing, finishing, and necessary incide ntals shall be included in the cost of the pay items. The cost of placing epoxy resin adhesive on existing concrete surfaces shall be included in the cost of new concrete which abuts the existing concrete. Payment for concrete used in footings in class X excavation will be made at the contract unit price only for the cubic yards placed within the neat lines of the footings as shown on the plans or as 1390 revised. If the Contractor elects to increase th e cement content as allowed herein, no additional compensation will be made. The cost of permanent metal forms shall be included in the cost of concrete, C, superstructure. The pay quantity of concrete in the slab will be computed from the dimensions shown on the plans, with no allowance for form deflection or geometry. Elastomeric bearings will not be paid for directly, unless otherwise specified. The 1400 cost thereof shall be included in the cost of the structural member they support. The cost of protecting existing footings to be extended shall be included in the cost of concrete, B, footings, unless otherwise specified. The cost of grout for grouting reinforcin g bars in place, the length of grouted hole recommended by the grout manufacturer in excess of the length shown on the plans, and the additional length of reinforcing bars required shall be included in the cost of field drilled hole in concrete. The cost of furnishing and installing polychloroprene sheeting shall be included 1410 in the cost of concrete, A, substructure. The cost of high density plastic bearing strips shall be included in the cost of concrete, A, substructure.
Incidental Construction (600-699)
649The cost of forms, PVC for bridge floor drains, falsework, falsework piling,
Source: Indiana Standard Specifications, 2024 Edition. Pages 8–8 of 1,248.