INCIDENTAL CONSTRUCTION

616RIPRAP AND SLOPEWALL

IN · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 552–0 Save this section

Ask about Section 616

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

616.01Description

This work shall consist of placing broken stone or concrete which may or may not be grouted, precast slabs, or slopewall in acc ordance with these specifications and in accordance with 105.03.

MATERIALS

616.02Materials 10

Materials shall be in acco rdance with the following:

Asphalt Joint Filler ...................................................... 906.01 Clay ............................................................................. 903.01 616.01

Fine Aggregate, Size No. 23 ........................................ 904.02 Geotextile for Riprap ................................................... 918.02 Portland Ceme nt .......................................................... 901.01(b) Precast Concrete Riprap .............................................. 904.04(e) Riprap .......................................................................... 904.04 20 WWR, Smoot h ............................................................ 910.01(b)5 Water ........................................................................... 913.01

CONSTRUCTION REQUIREMENTS

616.03Placing Dumped Riprap

Dumped riprap shall be placed to produc e a surface of approximate regularity and may not need to be hand placed. The finished surface shall vary no more than 9 in. from a true plane. The thickness perpendicular to its surface shall be no more than 2 ft nor less than 1 ft unless otherwise directed. 30

616.04Placing Grouted Riprap

The aggregate, preparation of the slope, and the depth of riprap aggregate for grouted riprap shall be in accordance with 616.05. After the aggregate has been placed and accepted, all openings shall be filled with cement grout. The finished surface shall be approximately smooth, solid, and true to line, grade, and section.

Grout shall be composed of 1 part portland cement and 4 parts fine aggregate. The portland cement and fine aggregate shall be dry-mixed to a uniform mixture. Water shall be added as the mixing continues until the grout attains a consistency that will 40 enable it to flow into the openings.

616.05Placing Revetment, Class 1, and Class 2 Riprap

Revetment, class 1 and class 2 riprap may be placed by dumping and shall be placed to the required thickness. The fini shed surface shall be placed in a uniform manner and be free of segregated clusters. The finished surface shall vary from a true plane no more than 9 in. for revetment riprap or 18 in. for class 1 or class 2 riprap. The placed riprap shall not be less than the minimum depth specified.

616.06Placing Uniform Riprap 50

Uniform riprap shall be placed to produce a surface of approximate regularity with edges having projections no more than 3 in . above the required cross-section. The material shall be hand laid or placed by other approved means.

616.07Blank

616.08Placing Precast Cement Concrete Riprap

The slope on which the riprap is to be placed shall be in a ccordance with that shown on the plans unless otherwise designated. Placement shall begin in a trench below the toe of the slope and progress upward. Each piece shall be placed by hand 60 616.08

perpendicular to the slope. It shall be firmly embedded against the slope in such a manner that the vertical joint space between individual units does not exceed 3/8 in., unless otherwise specified. Half blocks, odd shaped blocks, or class A concrete shall be used to fill the voids at the ends of sections to be placed or on curved shaped sections. The top course shall conform, as nearly as practicable, with the prescribed berm or shoulder elevation. Any adjustment necessary to achieve this shall be obtained by constructing a wedge course near the top of the slope as directed. This wedge course, when required, shall consist of class A concrete. If the thickness of the course does not allow class A concrete, it shall be constructed of a 1:2 mortar proportioned by volume. Toewalls, when required, shall consist of class A concrete. 70

616.09Slopewall

The slope on which the slopewall is to be placed shall be in accordance with that shown on the plans unless otherwise designated.

The concrete mixture shall be class A. Where paved slopewall abuts or surrounds columns, piers, or other structures, 5/8 in. of asphalt joint filler shall be used between the slopewall and such structure. Welded steel wire reinforcement shall be placed within the middle 1/3 of the slopewall thickness unless otherwise directed. The fabric shall extend through all construction joints. The surface of the slopewall shall be cured 80 for 48 h in accordance with 501.20. Construction joints may be either butt or keyway type.

Inspection holes shall be provided at the locations shown on the plans or as directed. The holes shall be approximately 3 ft by 3 ft in size.

Precast concrete riprap, Type B, as shown on the plans, may be used in lieu of slopewall of 4 in. thickness.

616.10Undermined Paved Side Ditch 90

Treatment of undermined existing paved side ditch and placement of revetment riprap shall be as shown on the plans or as otherwise directed.

Undermined paved side ditch shall be broken up and left in place. If it is determined that erosion is excessive, the eroded area shall be backfilled with a cohesive material, compacted, regraded, and lined with revetment or uniform riprap.

616.11Installation of Geotextile Under Riprap

Storage and handling of geotextiles shall be in accordance with the manufacturer’s recommendations. Geotextile shall be stored in such a manner as to prevent exposure 100 to direct sunlight, ultraviolet rays, water, temperature greater than 140°F, mud, dirt, dust, and debris. Each geotextile roll shall be labeled or tagged to provide product identification sufficient for inventory and quality control purposes. Exposure of geotextiles to the elements between lay down and cover shall be a maximum of 14 calendar days. If defects, rips, flaws, deterioration or damage incurred during manufacture, transportation, storage, or construction is evident at the time of 616.09

installation, the geotextile will be rejected and shall be replaced with no additional payment.

The surface to receive the geotextile sh all be prepared to a relatively smooth 110 condition free of obstructions, depressions, and debris within the limits indicated on the plans.

Geotextiles used along channels shall be placed with the machine direction of the geotextile parallel to the channel. Successive geotextile sheets shall be overlapped in such a manner that the upstream sheet is placed over the downstream sheet and the upslope sheet over the downslope sheet.

Geotextiles used for 2:1 or steeper slopes shall be placed with the machine direction of the geotextile sheets perpendicular to the toe of slope. The geotextile 120 sheets shall be overlapped in the direction of the anticipated movement of water.

Adjacent pieces of geotextile may be joined by sewing if approved, or by overlapping and pi nning. The minimum overlap shall be 18 in. except when placed under water. When placed under water, the overlap shall be a minimum of 3 ft. Securing pins shall be steel, 3/16 in. in diameter, 18 in. long, pointed at one end and fabricated with a head to re tain a steel washer having an outside diameter of no less than 1 1/2 in. Securing pins with washers shall be inserted through both strips of overlapped geotextile at spacing intervals in Table 1 along a line through the midpoint of the overlap. The geotextile strip shall be placed so that the lower strip will be 130 overlapped by the next higher strip. Pins shall be driven until the washer bears against the geotextile and secures it firmly to the ground.

Whether the fabric is joined by sewing or pinning, additional pins shall be installed as necessary to prevent any slippage of the fabric regardless of location.

Slope Pin Spacing steeper than 3:1 2 ft 3:1 to 4:1 3 ft 4:1 or flatter 5 ft Table 1

The geotextile shall be placed in such a manner that placement of the overlying materials will not excessively stretch or tear the geotextile and will not pull the 140 required overlap or seam apart. Construction equipment shall not be on the exposed geotextile. Placement of riprap or stone shall start from the base of the slope, moving upslope and from the center outward. Riprap shall not roll downslope and the height of drop for riprap shall be kept to less than 2 ft.

616.12Method of Measurement

Dumped, revetment, class 1, and class 2 riprap obtained from outside the right-of-way will be measured by the ton. If obtained from inside the right-of-way, no 616.12

measurement will be made if placed as s hown on the plans unless direct payment is specified. If placed at locations not shown on the plans, measurement will be made by 150 the square yard.

Grouted riprap and precast concrete ripr ap, including the area occupied by the wedge course, will be measured by the square yard, parallel to the slope. Slopewall will be measured by the square yard. Holes for inspecting slopewalls will be measured per each. Geotextiles used under riprap will be measured by the square yard by the type specified, complete in place. Uniform riprap will be measured by the ton.

Treatment of undermined paved side ditch will be measured by the linear foot of paved side ditch, broken and left in place. 160

616.13Basis of Payment

The accepted quantities of dumped, revetment, class 1, and class 2 riprap obtained from outside the right-of-way will be paid for at the contract unit price per ton. Dumped, revetment, class 1, and class 2 riprap obtained from within the project limits will be paid for at the contract unit price per square yard. Uniform riprap will be paid for at the contract unit price per ton. Grouted riprap will be paid for at the contract unit price per square yard of the specified de pth. Precast concrete riprap and concrete slopewall will be paid for at the contract unit price per square yard, all complete in place. If slag is used as dumped riprap and payment will be made per ton, the pay 170 quantity will be adjusted in accordance with 904.01.

The accepted quantities of geotextiles used under riprap will be paid for at the contract unit price per square yard, complete in place.

Inspection holes will be paid for at the contract unit price per each.

The treatment of undermined paved side ditc h will be paid for at the contract unit price per linear foot for paved side ditch, break. Backfill required for treatment of paved side ditch will be paid for at the contract unit price per cubic yard for borrow, 180 cohesive.

Payment will be made under:

Pay Item Pay Unit Symbol

Borrow, Cohesive ...................................................................... CYS Geotextiles for Riprap, _____ ................................................... SYS type Inspection Hole .......................................................................... EACH 190 Paved Side Ditch, Break ............................................................ LFT Riprap, Class _____................................................................... TON S Y S Riprap, Dumped ........................................................................ TON S Y S 616.13

Riprap, Grouted, _____ in. ........................................................ SYS depth Riprap, Precast Concrete ........................................................... SYS Riprap, Revetment ..................................................................... TON S Y S 200 Riprap, Uniform ........................................................................ TON Slopewall .................... ................................................................................... SYS

Slopewall, Concrete, _____ in. .................................................. SYS

depth

If the contract includes a pay item for removing materials from within the project

limits which are used as grouted riprap, the cost of such removal shall be included in

the cost of the pay item for the removal work. The cost of placing such material shall

be included in the cost of the riprap pay item.

210

The cost of placing grout in accordance with 616.04 shall be included in the cost

of the grouted riprap item.

The cost of paved side ditch required at the top of riprap and along the edge of

riprap will be paid for in accordance with 607.06.

The cost of welded steel wire reinforcement shall be included in the cost of the

slopewall.

The cost of excavation below the finished riprap or slopewall shall be included in220

the cost of the riprap and slopewall pay items.

The cost of excavation, grading, sewing, pinning, and necessary incidentals shall

be included in the cost of geotextiles.

SECTION 617 — BLANK
SECTION 618 — BLANK

Get an email when 616 changes

Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Indiana Standard Specifications, 2024 Edition. Pages 552–0 of 1,248. View official source ↗

Ask about this section

Scoped to Indiana 2024 INDOT Standard Specifications, Section 616 — RIPRAP AND SLOPEWALL. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.