901.01Hydraulic Cement
Cement incorporated into the work shall meet the quality requirements of these specifications.
Cement which has been in storage may be tested prior to use, and if tests show that it does not meet the requirements specified, it will be rejected. 10
A means for storing and protecting the cement against dampness shall be provided. Cement which has become partially set or which contains lumps or caked cement will be rejected. Cement salvaged from discarded or used sacks shall not be used.
Different types or brands of cement, or cement of the same brand from different mills, even if tested, shall not be mixed du ring use unless allowed, and then only as directed. They shall not be used alternately in any one pour for any structure, unless otherwise approved. 20
Portland cement shall conform to the requirements of the following specifications except as noted.
Cement Specifications Air-Entraining Portland Blast-Furnace Slag Cement AASHTO M 240, Type IS-A Air-Entraining Portland Cement AASHTO M 85, Type IA or IIIA Air-Entraining Portland-Pozzolan Cement AASHTO M 240, Type IP-A Portland Blast-Furnace Slag Cement AASHTO M 240, Type IS Portland Cement AASHTO M 85, Type I, II, or III Portland-Limestone Cement AASHTO M 240, Type IL Portland-Pozzolan Cement AASHTO M 240, Type IP
The exceptions to AASHTO M 240 are as follows:
weight of the portland-pozzolan cement for types IP and IP-A.
901.01
and IP-A, shall be in accordance with ASTM C618, class C or class F with the loss on ignition of the pozzolan limited to a maximum of 3%.
and IP-A, shall be interground with the portland cement clinker.
Portland cements and blended cements will be accepted based upon the manufacturer’s or distributor’s documente d ability to consistently furnish these materials in accordance with the applicable AASHTO requirements.
Cements shall comply with the applicable requirements of 901 and will be 50 accepted by certification from qualified manufacturers or distributors. The manufacturer is defined as the plant producing the cement. A manufacturer or distributor shall become qualified by establishing a history of satisfactory quality control of cement produced as evidenced by results of tests performed by a testing laboratory which is regularly inspected by the Cement and Concrete Reference Laboratory of the National Institute of Standards and Technology. Proof of such inspection shall be furnished upon request. All certifications shall be prepared by the manufacturer or distributor in accordance with the applicable requirements of 916. If a manufacturer or distributor elects to supply portland cement with a higher sulfur trioxide content in accordance with foot note B from Table 1 in AASHTO M 85, they 60 shall supply all the required supporting data to the Department’s Division of Materials and Tests prior to supplying such ceme nt. A QPL of Cement Sources will be maintained by the Department.
The manufacturer or distributor shall conduct sufficient tests to confirm that adequate quality control is maintained and that cement furnished is in accordance with the specification requirements. Documentation pertaining to cement shipped on certification shall be maintained for a period of at least three years and shall be provided when requested.
Random samples of cement will be obtained at the concrete plant. If the sample is not in accordance with the specification requirements, an investigation will be conducted. A copy of the findings and conc lusions resulting from the investigation will be furnished to the Contractor. Unless the investigation finds the Department is responsible for the failure to comply, the cost of the investigation plus any required corrective action will be assessed to the Contractor.
Cement manufacturers requesting to be qualified to supply cement shall provide the following: 80 901.01
provide to the Department’s Division of Materials and Tests a QCP in accordance with the applicable requirements of ITM 806. The QCP shall also include the location and type of samples taken, and a monthly summary of mill test data for the previous year’s production. A current SDS shall be submitted as an integral part of the initial qualification package.
data shall be submitted to the Department’s Division of Materials and Tests. If a specific type of cement is not manufactured in a given month, the monthly submittal shall state “No type ______ cement was manufactured during the month of __________, 20____”.
Foreign cement manufacturers or their domestic distributors requesting to be qualified to supply cement shall provide the following: 100
distributor shall provide to the Department’s Division of Materials and Tests a QCP in accordance with the applicable requirements of ITM 806. The QCP shall also include the location and type of samples taken and a summary of complete test results from the proposed cement source. A curr ent SDS shall be submitted as an integral part of the initial qualification package. The QCP shall explain the linkage between the cement being 110 furnished and the manufacturer’s or distributor’s quality control data, relative to ship-loads, barge-loads, railroad car-loads, and other applicable loads.
manufacturer or distributor shall be required to furnish the cement test results for each shipment prior to Department cement usage for the first five cement shipments intended for Department use. The test results for all five of these cement shipments shall fully comply with the required 120 material specifications. If not, this requirement will be continued for subsequent cement shipments until five consecutive cement shipment test results fully comply with the required material specifications, or Department source approval is withdrawn due to the inability to consistently supply satisfactory cement. 901.01
previous requirements, a monthly submission of all cement shipment test results for cement intended for 130 Department usage shall be submitted to the Department’s Division of Materials and Tests. If no cement shipments are received during a given month, the monthly submittal shall state “No cement was received during the month of __________, 20____”.
Only manufacturers and distributors included on the QPL of Cement Sources may furnish cement on certification.
A sample certification form addressing all required information is included in ITM 804. Alternate procedures and forms will be considered when requested and will be approved if there is a positive link between the cement furnished and the manufacturer’s quality control data.
Masonry cement shall be in accordance with ASTM C91, except the air content test and the water retention test may be waived.
Rapid hardening hydraulic cement shall be calcium sulfoaluminate, CSA, cement furnished from a manufacturer or manufacturer/distributor on the QPL of Cement Sources. A source will be considered for inclusion on the QPL by completing the requirements of 901.01(b)2b or 901.01(b)2c.
901.02Fly Ash Used as a Pozzolan
Fly ash is the finely divided residue that results from the combustion of ground or powdered coal. In general, class F fly ash is produced from burning anthracite or 160 bituminous coal and class C fly ash is produced from burning lignite or subbituminous coal.
Fly ash will be accepted from one of th e sources on the QPL of Pozzolan Sources. Fly ash from different sources or different types of fly ash shall not be mixed or used alternately in the same construction unless authorized in writing. Fly ash will be subject to random assurance sampling and testing by the Department. Failure of these random samples to meet the specified requirements will be cause for removal of the fly ash source from the QPL.
Acceptance is based upon the supplier’s documented ability to consistently furnish material in accordance with the specified requirements. 901.02
The fly ash shall be in accordance with AASHTO M 295 for class C or class F, with the following exceptions:
Autoclave Expansion or C ontraction, max. % ............ 0.5 180 Fineness: Amount retained when wet-sieved on
On days when fly ash is being accumula ted for use as a pozzolan, the supplier shall obtain a minimum of one sample per day and furnish test results for moisture content, loss on ignition, and No. 325 (45 μm) sieve residue for each sample.
For each 2,000 t produced, a comple te AASHTO M 295 analysis shall be performed on a sample composited randomly from the daily samples. The method of randomization shall be subject to approval by the Department. 190
The testing procedures followed shall be in accordance with ASTM C311 or other methods approved in writing by the Department.
The minimum frequency for calibration of test equipment is:
determinations or every six months, whichever comes first.
a newly installed thermocouple every six months.
year.
annually.
comply with applicable requirements of ASTM C114 using NIST Fly Ash reference materials.
3 . D o c u m e n t a t i o n Fly ash suppliers requesting to be included on the QPL for Pozzolan Sources shall supply the following:
901.02
and a summary of results for all specified tests for six consecutive months shall be submitted. Test results shall not be more than one year old at the time of the request.
all specified tests shall be submitted monthly. The results of the daily tests shall be available during normal working hours.
the applicable requirements of ITM 806. The QCP shall ensure the Department of a continuous supply of fly ash complying with the requirements. This QCP will be reviewed to determine its adequacy.
Certification, Other indicating the class of fly ash, the name, location, and unit of the generating plant. It shall 240 state that all fly ash shipped for use on Department projects will be produced under appropriate quality control and shall be in acco rdance with the specified requirements. It shall further indicate that the power company will participate in appropriate inspection and assurance testing. A sample certification form is provided in ITM 804.
in accordance with 901.02(b)1 shall be summarized and250
submitted monthly. The reports shall state the name and
location of the testing facility and shall be signed by the
chemist or technical manager. This certification shall also
identify the concrete plants receiving fly ash represented
by these results.
901.03Slag Cement Used as a Pozzolan
Slag cement shall consist of the non-metallic product, consisting essentially of260
silicates and aluminosilicates of calcium and other bases, that is developed in a molten
condition simultaneously with iron in a blast furnace. A glassy granular material is
formed when molten blast furnace slag is rapidly chilled by immersion in water. This
material is then ground to cement fineness, producing slag cement.
901.03
973
Slag cement will be accepted from one of the sources on the QPL of Pozzolan
Sources. Slag cement from different sources or different grades of slag cement shall
not be mixed or used alternately in the same construction unless approved in writing.
Slag cement will be subject to random assurance sampling and testing by the
Department. Failure of these random samples to be in accordance with the specified270
requirements will be cause for removal of the slag cement source from the QPL.
Slag cement will be accepted based on the manufacturer’s or distributor’s
documented ability to consistently furnish these materials in accordance with the
applicable ASTM and AASHTO requirements.
Slag cement shall be in accordance with ASTM C989 for grade 100 or 120.
280
For each 2,500 t produced, a complete ASTM C989 analysis shall be performed
on a sample composited randomly from the daily samples. The method of
randomization shall be subject to approval by the Department.
The testing procedures followed shall be in accordance with ASTM C989 or other
methods approved in writing by the Department.
The minimum frequency for calibration of test equipment is:
290
determinations or every six months, whichever comes first.
year.
annually.
be in accordance with the applicable requirements of ASTM
C114 using NIST reference materials.
Slag cement suppliers requesting to be included on the QPL shall supply the
following:
and a summary of results for all specified tests for six
901.03
974
consecutive months shall be submitted. Test results shall not
be more than one year old at the time of the request.
all specified tests shall be submitted monthly. The results of
the daily tests shall be available during normal working
hours.
with the applicable requirements of ITM 806. The QCP
shall ensure the Department of a continuous supply of slag
cement which is in accordance with the requirements. This
QCP will be reviewed to determine its adequacy.
Certification, Other indicating the grade of slag cement,
the name, location, and type of manufacturing facility. It330
shall state that the slag cement shipped for use on
Department projects will be produced under appropriate
quality control and shall be in accordance with the
specified requirements. A sample certification form
addressing all required information is provided in
ITM 804.
in accordance with 901.03(b) shall be summarized and
submitted monthly. The reports shall state the name and340
location of the testing facility and shall be signed by the
chemist or technical manager. This certification shall also
identify the concrete plants receiving slag cement
represented by these results.
901.04Silica Fume Used as a Pozzolanic Mineral Admixture
Silica fume will be accepted from one of the suppliers on the QPL of Pozzolan
Sources. Silica fume from more than one of these suppliers shall not be mixed or used350
alternatively in the same construction unless authorized in writing. Silica fume will be
subject to random assurance sampling and testing by the Department. Failure of the
random samples to meet the specified requirements will be cause for removal of the
silica fume supplier from the QPL.
Acceptance of silica fume will be based on the manufacturer’s documented ability
901.04
975
to consistently furnish material in accordance with the specified requirements.
The silica fume shall be in accordance with AASHTO M 307 with the following
exceptions:
in accordance with ASTM C1240, shall be conducted.
shall not be more than 10%.370
ASTM C1240, shall be conducted in lieu of strength activity
index.
minimum of 85% at seven days.
shall be conducted in accordance with ASTM C1240.380
shall be not more than 0.10%.
each 400 t of material produced. Test results for moisture
content, and loss on ignition, shall be furnished for each
sample.390
analysis shall be performed on a sample composed
randomly from daily samples. The method of randomization
shall be subject to approval by the Department. The optional
chemical requirements identified in AASHTO M 307 shall
be reported in addition to the increase of drying shrinkage
of mortar bars as well as the standard chemical and physical
requirements.
400
The minimum frequencies for calibration of test equipment shall be as follows:
annually.
901.04
976
annually.
be in accordance with AASHTO T 105.
Silica fume suppliers requesting to be included on the QPL shall supply the
following to the Department’s Division of Materials and Tests:
and a summary of results for all specified tests for six420
consecutive months shall be submitted. Test results shall not
be more than one year old at the time of the request.
all specified tests shall be submitted monthly.
ITM 806 shall be submitted. The QCP shall ensure the
Department a continuous supply of silica fume complying
with the material requirements and calibration procedures.430
This QCP will be reviewed by the Department’s Division of
Materials and Tests to determine its adequacy.
Other indicating the name, location, and type of
manufacturing facility, which includes the metallurgical
process and furnace. It shall state that the silica fume
shipped for use on Department projects will be produced440
under appropriate quality control and shall be in
accordance with the specified requirements. A sample
certification is provided in ITM 804.
accordance with 901.04(b) shall be summarized and
submitted monthly. The reports shall state the name and
location of the testing facility and shall be signed by the
chemist or technical manager. This certification shall also
identify the concrete plants receiving silica fume450
represented by these results.
901.04
977
901.05Chemical Anchor System
Chemical anchor systems shall be furnished from the QPL of Chemical Anchor
Systems. Chemical anchor systems will be considered for inclusion on the QPL by
completing the requirements of ITM 806, Procedure F and passing required laboratory
testing.
Chemical anchor systems shall be in accordance with the following:460
capable of anchoring deformed steel reinforcing bars and
grouting load transfer dowels.
withstanding a tensile load equal to the yield strength of a #7,
grade 60, epoxy coated, deformed steel reinforcing bar.
annular space between the concrete and the steel reinforcing bar
or dowel and remain in place until the chemical anchor is
completely cured.
The Department will test chemical anchor systems in accordance with ITM 807.
901.06PCC Sealer/Healers
PCC sealer/healers shall be furnished from the QPL of PCC Sealer/Healers. PCC
sealer/healers will be considered for inclusion on the QPL by completing the480
requirements in ITM 806, Procedure F and passing required laboratory testing.
PCC sealer/healers shall be in accordance with the following:
and healing cracks in PC pavement.
integrity of a PCC beam broken in flexure.490
location different from the original break or with a flexural
strength greater than or equal to 550 psi.
penetrate a crack 1/32 in. wide and 6 in. in depth.
901.06
978
The Department will test PCC sealer/healers in accordance with ITM 808.500
901.07Rapid Setting Patch Materials
Rapid setting patch materials shall be selected from the QPL of Rapid Setting
Patch Materials. A rapid setting patch material will be considered for inclusion on the
QPL by completing the requirements in ITM 806, Procedure F.
Normal weather rapid setting patch materials shall be used for ambient
temperatures of 32 to 85°F.
510
Hot weather rapid setting patch materials shall be used for ambient temperatures
above 85°F.
Rapid setting patch materials shall be capable of being utilized in patches ranging
from 1 in. to full depth without bonding agents.
These products shall not contain soluble chlorides as an ingredient of manufacture
or require chemical additives. The color shall be similar to PCC.520
They shall be single packaged dry mix requiring only water just prior to mixing.
They shall be packaged in 40 to 60 lb bags with a neat yield of approximately 0.40 cu
ft and shall allow at least a 50% extension, by weight with a 3/8 in. or a 1/2 in. round
aggregate. The minimum shelf life shall be 12 months.
Mixing shall be conducted with small concrete mixers or with a drill or paddle
mixer and shall be suitable for finishing with hand tools.
Rapid setting patch materials shall be in accordance with ASTM C928 with the530
following exceptions.
901.07
979
Physical Tests Specifications Requirements
Setting Time:
Normal Weather
Hot Weather
ASTM C266
Initial at 72°F
Final at 72°F
Initial at 95°F
Final at 95°F
10 – 20 min
12 – 35 min
10 – 20 min
12 – 35 min
Compressive Strength, min.*
1 h
2 h
24 h
28 days
ASTM C109 72°F, Normal
2,000 psi
3,000 psi
5,000 psi
8,000 psi
Compressive Strength, min.*
3 h
24 h
28 days
ASTM C109 95°F, Hot
3,000 psi
5,000 psi
8,000 psi
Relative Dynamic Modulus
Procedure B, 300 cycles ASTM C666 95% min.
Slant Shear Bond Strength, min.
28 days ASTM C882 2,500 psi
Flexural Strength, 24 h
mortar only
mortar – aggregate extension
ASTM C78
500 psi
600 psi
Length Change, maximum
28 days (air storage)
ASTM C157
modified C928 -0.075%
Scaling Resistance
5 cycles
25 cycles
50+ cycles
ASTM C672
0 rating, No scaling
0 rating, No scaling
1.5 rating, Very slight
to Slight scaling
* Material used shall be neat rapid setting patch material mixed in accordance with the
manufacturer’s installation instructions.
All rapid setting patch materials complying with the specified physical
requirements will be subjected to a field performance demonstration. The field
performance demonstration will take place as directed. Rapid setting patch materials
shall be used to patch a designated site, typical of a standard repair. The site will be
evaluated after one year’s exposure. Approval will be based on visible signs of
distress, such as cracking, crazing, scaling, spalling, wearing, edge fraying, corner
cracking, or debonding.540
Testing shall be performed by a recognized laboratory in accordance with
ITM 806. Test reports shall not be more than five years old on January 1 of the
approval year.
901.07
980
901.08Packaged Patching Products
Packaged patching products shall be selected from the Department’s QPL of
Rapid Setting Patch Materials. A packaged patching product will be considered for
inclusion on the QPL by completing the requirements in ITM 806, Procedure F.550
Packaged patching products shall be in accordance with ASTM C387. All
packages shall be identified as conforming to ASTM C387. The markings shall also
show the kind and type of material, the net weight in each bag, the yield in cubic feet
or yield in square feet per inch of thickness, and the amount of water recommended
for mixing to produce a 2 in. to 3 in. slump.
The following exceptions to ASTM C387 shall apply for packaged patching
products used in accordance with 710.
560
Physical Tests Specifications Requirements
Compressive Strength, min.
24 h
28 days
ASTM C109 on 2
in. cubes (neat) 2,000 psi
5,000 psi
Length Change, max.
28 days (air storage)
28 days (water storage)
ASTM C157,
modified C928 -0.09%
+0.03%
Slant/Shear Bond Strength, min.
28 days
ASTM C882
modified* 2,000 psi
Modulus of Elasticity
Minimum @ 28 days
Maximum @ 28 days
ASTM C469
3,000,000 psi
5,000,000 psi
* Product scrubbed into substrate or as recommended by the manufacturer.
901.09Air-Cooled Blast Furnace Slag for Retaining Walls
If ACBF or coarse aggregate is used, and soil, B borrow, structural backfill, or
coarse aggregate is to be placed above the ACBF or coarse aggregate, a single layer
of geotextile shall be placed on top of the ACBF or coarse aggregate in accordance
with 616.11.
A Type C certification in accordance with 916 shall be provided for the geotextile
materials.
570
ACBF shall be in accordance with the pH, chlorides, sulfates, organic content,
resistivity, and permeability requirements of structure backfill as listed in 211.03.1. It
shall also be in accordance with ITM 212. Total sulfides shall also be determined in
accordance with EPA 376.1, using the 100-mL pH water samples obtained during the
ITM 212 test, and shall not exceed 400 ppm.
901.08
981
The ACBF shall have a maximum corrosion rate as follows if tested in accordance
with ASTM G59.
901.10Components of MSE Retaining Walls
Precast concrete face panels shall be produced from a source listed on the QPL of
Certified Precast Concrete Producers, in accordance with ITM 813. Concrete shall590
have a compressive strength equal to or greater than 4,000 psi at 28 days.
The target water/cementitious ratio for the concrete mix design shall not exceed
0.435The cement content and target water/cementitious ratio of the concrete mix
design shall be sufficient to obtain the specified minimum 28-day compressive
strength. Air-entraining admixture and chemical admixture types A, B, C, D, or E from
the QPL of PCC Admixtures and Admixture Systems may be used.
Ground-reinforcement connection hardware and reinforcing bar lifting devices
shall be set in place and secured prior to beginning casting, in accordance with the600
dimensions and tolerances shown on the working drawings.
The manufacturer shall provide for all testing and inspection services during each
day’s production of the panels. The frequency of production control testing shall be
based on a lot of 50 panels, or fraction thereof, for each day’s production. Sampling
and testing of the plastic concrete shall be in accordance with 505.01, or the ASTM
equivalent. A minimum of one water/cementitious ratio, slump, air content, and
relative yield tests shall be run per production lot, per day. A minimum of two 6 in. by
12 in. cylinders shall be cast per day’s production lot for compressive strength610
determination. Cylinders shall be cured in the same manner as the panels they
represent. Relative yield, air content, and slump of the concrete shall be in accordance
with 702.05. Compressive strength shall be determined in accordance with AASHTO
T 22 or ASTM C39, with lot acceptance based on the average of 2 cylinders tested at
an age no greater than 28 days. Panels shall not be shipped until the compressive
strength meets or exceeds the 28-day requirement.
If the cylinder-test results do not satisfy the requirements described herein, and
additional cylinders for testing are not available, the manufacturer may core the panels.
The wall manufacturer shall randomly select two panels from the lot for coring in620
accordance with AASHTO T 24 or ASTM C42. The wall manufacturer shall obtain
one core on the backside of each panel with a device that produces uniform test
901.10
982
samples without coring completely through the panel. Coring shall not be located
within 6 in. of the panel fasteners or the edges of the panels and shall avoid the panel's
reinforcing steel. The wall manufacturer shall fill the core holes with equivalent
concrete materials or rapid setting patch materials, and trowel to produce a smooth
finish. Excess material removed during troweling shall not be reused. If rapid setting
patch material is used, mixing and curing shall be in accordance with the
manufacturer's recommendations. Compressive strength testing shall be performed on
the cores. If the average strength-test results from the cores satisfy or exceed the630
requirements described herein, the production lot panels may be shipped.
The panels shall be cast on a flat area, with the front face of the form at the bottom,
and the back face at the upper part. Tie strip guides shall be set on the rear face. The
concrete in each unit shall be placed without interruption and shall be consolidated as
necessary to prevent the formation of segregation or cleavage planes. Clear form oil
from one manufacturer shall be used throughout the casting operation.
The panels shall be cured for a sufficient length of time such that the concrete
develops the specified compressive strength.
The forms shall remain in place until they can be removed without damage to the
unit.
The concrete surface for the front panel face shall have a surface finish produced
from contact with the form. The rear face of the panel shall be screeded to eliminate650
open pockets of aggregate and surface distortions in excess of 1/4 in.
All panels shall be manufactured within the tolerances as follows:
Lateral position of tie strips shall be within 1 in. All other dimensions shall be
within 3/16 in.
Squareness, as determined by the difference between the two diagonals, shall not
exceed 1/2 in.
Surface defects on smooth formed surfaces measured on a length of 5 ft shall not
exceed 1/8 in. Surface defects on textured finished surfaces measured on a length of 5
ft shall not exceed 5/16 in.
901.10
983
Verification of panel compressive strength will be conducted by the Engineer.670
The frequency of verification testing will be one test for every 750 panels per
manufacturer with a minimum of one test per contract. One panel will be randomly
selected and two locations will be selected for coring. In the presence of the Engineer,
the Contractor shall obtain two 4 in. cores on the backside of the panel without coring
completely through the panel. The Contractor shall refill the core holes with rapid
setting patch materials and trowel to produce a smooth finish. Excess material
removed during troweling shall not be reused. Mixing and curing of the patching
materials shall be in accordance with the manufacturer’s recommendations.
The Engineer will test the cores in accordance with AASHTO T 24. The680
verification test results will be averaged and shall be in accordance with 901.10(a)1a.
If the initial verification test results do not satisfy the requirements described herein,
the Engineer will randomly select two different panels for additional verification
testing. If the additional verification tests satisfy the requirements described herein, no
further action is required. If the test results still do not satisfy the requirements
described herein, installation of panels shall cease and the Engineer will conduct an
investigation. Panels manufactured on the same dates as the panels cored for
verification tests that have already been installed will be considered and adjudicated
as failed material in accordance with 105.03. The Engineer will conduct verification
testing until three consecutive dates of production satisfy the strength requirements690
described herein. The Contractor or wall manufacturer shall make arrangements so
panels from three consecutive dates of production are accessible for coring.
Installation of panels may resume once acceptable verification testing results are
achieved.
Units will be subject to rejection due to their failure to be in accordance with the
requirements as specified herein. The following defects may result in rejection:
concrete.
such as broken or chipped concrete, or color variations or
dunnage marks on the front face due to excessive form oil
or other reasons.
The Engineer will determine whether spalled, honeycombed, chipped, or710
otherwise defective concrete shall be repaired or be cause for rejection.
Repair of concrete, if allowed, shall be completed in a manner which is acceptable
to the Engineer. Repair to concrete surfaces that are to be exposed to view after
completion of construction shall be subject to approval.
901.10
984
The place and date of manufacture, and production lot number shall be shown on
the rear face of each panel.
720
All panels shall be handled, stored, and shipped to eliminate the danger of
chipping, cracks, fractures, or excessive bending stresses. Panels in storage shall be
supported on blocking located immediately adjacent to tie strips to avoid bending the
tie strips.
The coping may be precast or cast-in-place.
The horizontal and vertical joint spacers shall include compression blocks, pins,
or other manufacturer’s recommended materials to provide a uniform joint.
The joint cover shall be either a non-woven needle-punch polyester geotextile or
a woven monofilament polypropylene. The joint cover shall be attached to the rear
face of the panels with a manufacturer’s recommended adhesive.
A letter certifying that the joint spacers and joint cover adhesive material supplied
is in accordance with the manufacturer’s recommendations shall be provided prior to
use of the materials.740
- 731MECHANICALLY STABILIZED EARTH RETAINING WALLS
- 735TEMPORARY WIRE-FACED MECHANICALLY STABILIZED EARTH RETAINING WALLS
- 506PCCP PATCHING
- 722CONCRETE BRIDGE DECK OVERLAYS
- 501QC/QA PORTLAND CEMENT CONCRETE PAVEMENT, PCCP
- 502PORTLAND CEMENT CONCRETE PAVEMENT, PCCP
- 707PRECAST CONCRETE AND PRECAST PRESTRESSED CONCRETE STRUCTURAL MEMBERS
- 509PORTLAND CEMENT CONCRETE PAVEMENT, PCCP, JOINT REPAIR
Get an email when 901 changes
Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.