702.01Description
This work shall consist of furnishing and placing portland cement concrete for structures and incidental construction in accordance with 105.03.
702.02Classes of Concrete
The following classes of concrete shall be used where specified.
CLASS OF CONCRETE A B C Cement content in lb/cu yd 564 470 658 Maximum water/cement ratio in lb of water per lb of cement 0.450 0.620 0.443 Minimum water/cement ratio in lb of water per lb of cement* 0.380 0.400 0.380 * The minimum water/cement ratio for all slipformed railings shall be 0.360.
702.01
Unless specified otherwise, the concrete used shall be class A. When class A is specified, class C may be used as a substitution. When class B is specified, class A or class C may be used as a substitution.
Class A concrete shall be used in the following:
Concrete in footings shall be class B.
Concrete in superstructure, integral bents, and railings shall be class C. 30
MATERIALS
702.03Materials
Materials shall be in acco rdance with the following:
Admixtures for Use in Concrete .................................. 912.03 Castings ....................................................................... 910.05 Concrete Coarse Aggregate For exposed concrete, Class A or Higher ............... ITM 226, 904 40 For non-exposed concrete, Class B or Higher ........ ITM 226, 904 Curing Materials .......................................................... 912.01 Elastomeric Bearings ................................................... 915.04 Fabric for Wa terproofing ............................................. 918.06 Fly Ash ........................................................................ 901.02 Geotextile for Use with Underdrains ........................... 918.03 High Density B earing Strips ........................................ 906.08 Permanent Metal Forms .............................................. 910.03 Polychloroprene Joint Membrane and Adhesive ......... 906.02(a)4 50 Preformed Expansion Joint Filler ................................ 906.03 Portland Cement .......................................................... 901.01(b) Silica Fume .................................................................. 901.04 Slag Cement ................................................................ 901.03 Utility Asphalt, UA-1 .................................................. 902.01(d) Water ........................................................................... 913.01 702.03
Drainage pipe through concrete masonry shall be in accordance with 715.
Grout material for field drilled holes shall be selected from the QPL of Chemical 60 Anchor Systems.
702.04Shipping and Storage
The cement shall be well protected from rain and moisture. All cement damaged by moisture or which fails to meet the specified requirements shall be rejected and removed from the work. Cement stored for a period longer than 60 calendar days shall be retested before being used on the work. Cement of different brands, types, or from different mills shall be stored separately.
CONSTRUCTION REQUIREMENTS 70
702.05Proportioning
Control of PCC for air content, slump, or relative yield will be determined from tests performed by the Engineer. Concrete and necessary labor for sampling shall be furnished by the Contractor as required by the Engineer. Testing will be in accordance with the Frequency Manual.
A CMDS shall be submitted seven calendar days prior to production and be approved by the Engineer on the Departme nt provided spreadsheet. The absolute volume of the mix design shall be 27.0 cu ft at the design air content of 6.5%. 80
The aggregate blend on the CMDS may produce an optimized aggregate gradation in accordance with the Department provided spreadsheet. If an optimized aggregate gradation is used, it shall consist of, at a minimum, one concrete coarse aggregate and one fine aggregate, No. 23. One additional class A or higher for exposed or class B or higher for non-exposed intermediate-sized coarse aggregate may be included if approved by the Engineer.
The proportion of ingredients of each batch shall be within the following limits and shall be as approved. 90
The relative yield of the concrete shall be determined in accordance with 505. The concrete when produced shall provide a relative yield of 1.00 ±0.02. When the relative yield is outside the tolerances, adjustments to the batch weights shall be made. The minimum amount of cement shall be used for the desired class of concrete. The cement content shall not be increased more than 60 lb/cu yd. The relative yield of the concrete shall be maintained as stated above. If Type IP or Type IP-A cements are to be used in the structural concrete, the cement content shall be increased by a multiplier of 1.06 times the minimum amount of cement required or the desired increased cement content for the specified class of concrete. 100
For example: 1.06 x 564 = 598 lb/cu yd for class A concrete. 702.04
Fly ash from a qualified source may be used as a partial replacement for portland cement. The substitution of fly ash for portland cement will not be allowed in conjunction with the use of slag cement or blended cement types IP, IP-A, IS, or IS-
minimum 1.25:1 ash-to-cement replacement ratio, by weight.
Slag cement from a qualified source may be used as a partial replacement for 110 portland cement. The substitution of slag cement for portland cement will not be allowed in conjunction with the use of blended cement types IP, IP-A, IS, IS-A, or fly ash. Mix designs will be based on using a maximum 30% cement substitution with a 1:1 slag-to-cement ratio, by weight.
Slag cement or silica fume in accordance with 709.05(c) shall be used in all bridge decks, reinforced concrete bridge approaches, and terminal joint lugs.
Blended portland pozzolan cements, fly ash, and slag cement may be used in concrete when the ambient temperature is above 45°F during the entire placement 120 period. Immediately following placement, the average ambient te mperature shall be above 45°F for the entire curing period. The average temperature shall be calculated based on hourly temperature measurements taken at the jobsite or from published weather station data within 10 miles of the jobsite. If the temperature restrictions are not met during placement or during the require d curing period, curing shall continue and the element shall not be put into service until the strength requirements in accordance with 702.24 are met. If no test specimens are availa ble to determine the concrete strength, curing shall continue and the concrete will be adjudicated as failed material. In no case shall the curing period be reduced below the minimum number of days specified for the element. 130
All concrete shall have an air content of 6.5% ±1.5% by volume. Air content shall be determined in accordance with 505.
Powdered admixtures shall be measured by weight. Paste or liquid admixtures shall be measured by weight or volume. All admixtures shall be within 3% of the amount required. When admixtures are used in small quantities in proportion to the cement, as is the case for air-entraining admixtures, mechanical dispensing equipment shall be provided.
Class A concrete shall contain a water-reducing admixture. Class C concrete shall contain a retarding admixture when either the air temperature is above 70°F or the concrete temperature is above 80°F, or if retardation is required due to the structure design, or due to the proposed pour sequenc e such as for the requirements for floor slab pours set out in 704.04. Air-entraini ng cements will not be allowed in class C concrete.
702.05
If the contract requires stay-in-place me tal forms for the bridge deck or if the Contractor elects to use such forms, the br idge deck concrete shall incorporate class AP coarse aggregate instead of class A. 150
702.06Measuring and Batching
Unless otherwise specified, the minimum batch shall be 2 cu yds. Measuring and batching of materials shall be performed at a batching plant. Different kinds or sources of coarse aggregate or different brands of cement shall not be used in any unit of the structure, except in an emergency and with written approval.
Either sacked or bulk cement may be used . No fraction of a sack of cement shall be used in a batch of concrete unless the cement is weighed. All bulk cement shall be 160 weighed on an approved weighing device. The bulk cement weighing hopper shall be sealed and vented to preclude dusting during operation. The discharge chute shall not be suspended from the weighing hopper and shall be arranged so that cement does not lodge in it or leak from it. Accuracy of batching shall be ±1% of the required weight.
If fly ash is used as a pozzolan in portland cement concrete, the cement and fly ash shall be weighed and discharged separately when a manual operation is utilized. When an automatic batching plant is utilized, the fly ash may be weighed into the cement weigh hopper in one cumulative operation with the portland cement always being weighed in first. 170
Water may be measured either by volume or by weight. The accuracy of measuring the water shall be within 1% of the required amount.
The batch plant site, layout, equipment, and provisions for transporting material shall assure a continuous supply of reasonably uniform material to the work. Aggregate stockpiles shall be in areas sufficiently well drained to prevent any dirt underneath the stockpile from becoming softened and pumping into the aggregate to a 180 level from which the aggregate is to be removed and used in the work. Stockpiles shall be built in layers not to exceed 6 ft in depth. Upper layers shall be prevented from spilling over the sides of the layers below.
The removal of aggregates from stockpiles shall be performed so that segregation will not occur. Aggregate which has become mixed with dirt shall not be used in the work.
Washed aggregates shall drain for at least 12 h prior to use. An increase in the drainage time may be required, as directed , at any time when the moisture becomes 190 non-uniform in aggregates from any source. Aggregates from different sources shall not be stockpiled together without written approval.
702.06
Batching shall be conducted to obtain the weights of materials required within a tolerance of ±2%.
The batching plant shall include bins, weighing hoppers, and scales for the fine aggregate and for each size of coarse aggregat e. If cement is used in bulk, a bin, hopper, and scale for cement shall be included. If fly ash is used, the separation of 200 cement and fly ash bins will be as approved. Bins with adequate separate compartments for fine aggregate and for each size of coarse aggregate shall be provided in the batching plant.
Means of control shall be provided so that as the quantity required in the weighing hopper is approached the material may be added slowly and shut off with precision. A port or other opening for removing an overload from the hopper shall be provided. A port for sampling cement shall be provided and may be either the overload port or a separate port located at any point from the bottom of the storage bin to the weigh
hopper. The sampling port shall be located and constructed to provide a representative210
sample of the cement being used. Weighing hoppers shall be constructed to eliminate
accumulation of tare materials and to discharge fully.
For applied loads of 1,000 lb and greater on the cement scale and applied loads of
4,000 lb and greater on the aggregate scale, the scales shall be accurate to 0.5%. For
applied loads of less than 1,000 lb and 4,000 lb for the cement and aggregate scales,
respectively, the scales shall be accurate to 2.0% or one graduation, whichever is
larger. Poises shall be designed to be locked in any position to prevent unauthorized
change of position. Scales will be inspected as often as necessary to ensure their
continued accuracy. A minimum of ten 50 lb weights shall be provided for testing of220
scales.
Batching plants may be equipped with approved automatic weighing devices to
proportion aggregates and bulk cement.
When batches are hauled to the mixer, bulk cement shall be transported either in
waterproof compartments or between the fine and coarse aggregates. When cement is
placed in contact with the aggregates, batches may be rejected unless mixed within
1 1/2 h of such contact. Sacked cement may be transported on top of the aggregates.230
Batches shall be delivered to the mixer separate and intact. Each batch shall be
dumped cleanly into the mixer without loss and, when more than one batch is carried
on the truck, without spillage of material from one batch compartment into another.
702.07Mixing
Concrete may be mixed at the site of construction, at a central point, or wholly or
in part in truck mixers. Retempering concrete by adding water or by other means will
not be allowed after initial set. When the concrete is delivered in transit mixers and
702.07
624
when allowed, additional water may be added occasionally to increase the slump.240
When water is added to the mix, additional mixing shall be performed as directed with
all operations completed within the time limits in accordance with 702.09(c). The
amount of water added shall be determined accurately and noted on the batch ticket.
Such addition of water will not be allowed as a continuing operation. The total of all
water included in the mix shall not exceed the maximum in accordance with 702.02.
Concrete that is outside the specified slump limits at time of placement shall not
be used. Except as required in 702.05 for class A and class C concrete, chemical
admixtures Type A, Type B, Type D, Type F, and Type G may be used in the concrete.
Chemical admixtures Type C and Type E will be allowed only with prior written250
permission.
702.08Mixing at Site of Work
For concrete to be acceptable, no more than 1 h shall elapse from the time mixing
water has entered the mixer until the mixed batch is deposited into the forms.
The concrete shall be mixed in an approved batch mixer having a rated capacity
of no less than 188 lb except for pours of 20 cu yds or less, or where otherwise
specified, a 94 lb minimum capacity mixer may be used. Mixers shall produce a
uniform distribution of ingredients throughout the mass. No mixer shall be operated260
beyond its factory rated capacity.
The concrete shall be mixed no less than 60 s after all ingredients, including water,
are in the mixer.
During the period of mixing, the drum shall rotate at the speed for and it was
designed, which shall be no less than 14 and no more than 20 revolutions per minute.
If this procedure does not mix the concrete thoroughly, a sufficient additional number
of turns at the same rate shall be made until a thorough mixing of the ingredients is
obtained.270
The mixer shall be equipped with a batch meter for counting the number of
batches discharged and a timer for automatically locking the discharge chute to prevent
emptying the mixer prior to the specified minimum mixing time. Mixers shall be
equipped with mechanical means for preventing the addition of ingredients, including
water, after mixing is started. The first batch shall contain an additional quantity of
cement, fine aggregate, and water sufficient to coat the inside surface of the drum to
avoid diminishing the mortar content of the initial batch. The entire contents of the
drum shall be removed before the materials for the next batch are introduced. Upon
cessation of mixing for any considerable time, the drum shall be cleaned thoroughly.280
Structural concrete shall be mixed only in such quantities as are required for
immediate use and shall be placed while fresh before initial set has occurred. Hand
mixing will not be allowed except in an emergency and then only with permission.
Hand mixing shall be done on a watertight platform in such manner and so continued
702.08
625
to ensure a homogeneous mixture of the required consistency. Hand mixed batches
shall not exceed 1/2 cu yd in volume.
702.09Ready-Mixed Concrete
290
Ready-mixed concrete shall be mixed and delivered by means of one of the
following operations:
transported to the point of delivery in a truck-agitator or
truck-mixer at agitating speed or in non-agitating equipment in
accordance with 702.09(d). Concrete delivered under these
provisions shall be known as central-mixed concrete.
300
in a truck-mixer. Concrete delivered under these provisions
shall be known as shrink-mixed concrete.
these conditions shall be known as transit-mixed concrete.
The source of ready-mixed concrete shall be approved prior to delivery of the
concrete. This approval will be based on the capacity and condition of the equipment,
volume of production, and length of haul, with consideration of the use of the concrete.310
Original approval will not constitute continued approval if satisfactory concrete or rate
of delivery is not maintained.
Approval may be refused or previous approval may be withdrawn for a truck
mixer or for a part of equipment not functioning in such manner as to produce and
deliver uniform concrete to the site of the work at a uniform rate.
Before a pour is started, the number of trucks to be assigned to the work, the rate
of production, and all other conditions necessary for furnishing satisfactory concrete
shall be subject to approval. Such assigned equipment shall be in satisfactory operating320
condition prior to the start of the pour. Once assigned to a pour, equipment shall not
be diverted for another purpose without approval.
Mixers and agitators shall be in accordance with the following:
may be truck-mixers or truck-agitators. Each mixer and agitator
shall have attached metal plates, prominently placed and plainly
marked, indicating the various designed uses of the equipment,330
the volume capacity of mixed concrete, the speed of rotation of
702.09
626
the mixing drum, and the manufacturer’s name and address.
Stationary mixers shall be equipped with an acceptable timing
device which does not enable the batch to be discharged until
the specified mixing time has elapsed. Truck-mixers shall be
equipped with means by which the number of revolutions of the
drum may be verified readily. The counters shall be actuated at
the time of starting mixing at mixing speed.
without overload, shall be capable of combining the ingredients
of the concrete within the specified time into a thoroughly
mixed and uniform mass and of discharging the concrete with a
satisfactory degree of uniformity in accordance with
without overload, shall be capable of maintaining the mixed
concrete in a thoroughly mixed and uniform mass and of
discharging the concrete with a satisfactory degree of350
uniformity in accordance with 702.09(b)4.
discharged at approximately the 1/4 and 3/4 points of each load.
If the slumps differ by more than 1 in. when the average slump
is 3 in. or less, or by more than 2 in. when the average slump is
greater than 3 in., the mixer or agitator shall not be used until
conditions are corrected, except as set out in 702.09(b)5.
longer mixing time or with a smaller load will enable the
requirements in 702.09(b)4 to be met.
conditions due to the accumulations of hardened concrete or
mortar or to wear of blades. When such change of conditions is
found, the tests described in 702.09(b)4 shall be repeated.
Mixers and agitators shall be operated within the limits of the capacity and speed370
of rotations designated by the manufacturer. The following shall apply in fulfilling
these requirements.
than 60 s. Mixing time shall be measured from the time all
cement and aggregates are in the drum. The batch shall be so
charged into the mixer that some of the water enters in advance
702.09
627
of the cement and aggregates. All required water shall be in the
drum by the end of the first quarter of the specified mixing time.
380
stationary mixer may be reduced to the minimum required to
mix the ingredients, or approximately 30 s. Mixing shall then
be completed in a truck-mixer by no less than 50 and no more
than 100 revolutions of the drum or blades at the rate of rotation
designated by the manufacturer of the equipment as mixing
speed. Additional mixing, if required, shall be at the speed
designated by the manufacturer as agitating speed.
capacity, the number of revolutions of the drum or blades at
mixing speed shall be no less than 70 and no more than 100, but
not less than that recommended by the mixer manufacturer.
concrete that has been completely mixed in a stationary mixer,
further mixing during transportation shall be at the speed
designated by the manufacturer of the equipment as agitating
speed.
400
concrete, the concrete shall be delivered to the site of the work
and its discharge completed within 90 minutes after the
introduction of the mixing water to the cement and aggregates,
or the introduction of cement to the aggregates, unless a shorter
time is otherwise specified. When a truck-mixer is used for the
complete mixing of the concrete, the mixing operations shall
begin within 30 minutes after the cement has been added to the
aggregates.
410
aggregates and water at the batching plant and with bagged
cement at the point of delivery, provided the truck-mixer is then
operated at mixing speed for the required additional revolutions
and satisfactory concrete is produced.
the mixing water for succeeding batches.
Central mixed concrete may be transported from the mixing plant to the place of
use in non-agitating equipment as approved. The following shall apply in fulfilling
these requirements.
702.09
628
metal containers equipped with gates that enable control of the
discharge of the concrete. Covers shall be provided for
protection of the concrete when required.
thoroughly mixed and uniform mass and discharged with the
degree of uniformity in accordance with 702.09(d)3. Discharge
shall be completed within 30 minutes after the introduction of
the mixing water to the cement and aggregates.
slump differs by more than these tolerances the non-agitating
equipment shall not be used until the conditions are corrected
in accordance with 702.09(d)4.
440
agitating equipment is operated at minimum capacity for the
maximum time of haul and with the concrete mixed the
minimum time, the equipment may still be used when operated
using smaller loads, shorter hauls, or longer mixing times, or
combinations thereof, which enables 702.09(d)3 to be met.
702.10Pumping Concrete
If the Contractor elects to convey concrete by means of pumping, the concrete
shall be handled to minimize disturbance to the concrete which significantly alters the450
properties of the concrete being pumped, especially the loss or variability of the air
content. The pumping equipment shall be mechanically sound, suitable in kind, and
adequate in capacity for the proposed work. The concrete shall not be pumped through
aluminum or aluminum alloy pipe. All pipes used for pumping concrete shall be kept
clean and free from coatings of hardened concrete. Pump lines shall not rest directly
on epoxy coated reinforcing bars. The pumping equipment shall be located such that
operational vibrations will not damage freshly placed concrete.
When placing concrete directly from a truck mounted boom, the concrete pump
lines shall have a flexible end section at least 10 ft long. Methods of placement shall460
result in a steady and continuous discharge. If necessary, this may require the use of a
restrictive device at or near the end of the discharge tube, the laying the flexible end
section horizontally, or other means. For the initial placement of concrete pours which
are predominantly vertical, the discharge end of the flexible end section shall be within
2 ft of the bottom of the pour.
The Contractor shall submit a description of the intended pumping procedures
which it intends to use, and shall notify the Engineer as to the pumping procedure at
least 24 h in advance of concrete placement.
702.10
629
470
702.11Cold Weather Concrete
When it is necessary to place concrete at or below an atmospheric temperature of
40°F, or whenever it is determined that the temperature may fall below 40°F within
the curing period, the water, the aggregates, or both shall be heated and suitable
enclosures and heating devices provided. Cold weather concrete shall be placed at the
risk of the Contractor and shall be removed and replaced with no additional payment
if it becomes frozen or otherwise damaged.
When aggregates or water are heated, the resulting concrete shall have a
temperature of at least 50°F and not more than 80°F at the time of placing. Heating480
equipment or methods which alter or prevent the entrainment of the required amount
of air in the concrete shall not be used. The equipment shall be capable of heating the
materials uniformly. Neither aggregates nor water used for mixing shall be heated to
a temperature exceeding 150°F. When aggregates or water are heated to 100°F or
above, they shall be combined first in the mixer before the cement is added. The
maximum temperature of concrete produced with heated aggregates shall be 90°F.
Materials containing frost or lumps of frozen material shall not be used.
Stockpiled aggregates may be heated using dry heat or steam. Aggregates shall
not be heated directly by gas or oil flame or on sheet metal over fire. However, a drier490
may be used if approved.
When aggregates are heated in bins, steam-coil heating, water-coil heating, or
other methods which are not detrimental to the aggregates may be used. The use of
salt or other chemicals to accelerate hardening of the concrete will not be allowed
unless approved in writing.
Immediately after a pour is completed, the freshly poured concrete and forms shall
be covered to form a complete protective enclosure around the element being poured.
If the element is a bridge deck, the enclosure shall encompass the top, bottom, and all500
sides. The air within the entire enclosure shall be maintained at a temperature above
50°F for a minimum of 144 h for bridge decks, the top surface of reinforced concrete
slab bridges, and for a minimum of 72 h for all other concrete. If for any reason this
minimum temperature is not maintained, the heating period shall be extended. When
dry heat is used, means shall be provided to maintain adequate moisture in the air
within the enclosure.
All necessary measures shall be taken during protective heating to keep the
heating equipment in continuous operation and to maintain the proper temperature
around all sides, including the top and bottom of the concrete. Adequate fire protection510
shall be provided where heating is in progress and such protection shall be accessible
at all times.
Where practicable, forms insulated with at least 2 in. thick blankets made of
fiberglass, rock wool, balsam wool, or similar commercial material capable of
702.11
630
maintaining the surface of the concrete at no less than 50°F may be used in lieu of
other protection of concrete involving housing and heating. When forms are insulated,
exposed horizontal surfaces shall be protected with a similar layer of the insulating
material fastened securely in place. If the insulated forms do not maintain the proper
temperature at the surface of the concrete, auxiliary protection and heat shall be used.520
702.12Consistency
Slump will be measured in accordance with 505 and shall be no less than 1 in. and
no more than 6 in.
702.13Forms
Forms shall be mortar-tight and sufficiently rigid to prevent distortion due to the
pressure of the concrete and other loads incident to the construction operations,530
including vibration. Forms shall be constructed and maintained to prevent the opening
of joints due to shrinkage of the lumber.
Unless otherwise provided, all forms for exposed surfaces except the undersides
of girders, slabs, and arch rings shall be lined with approved plywood, metal, or similar
satisfactory composition. The lining shall not be sprung into place. Before concrete is
placed, all open joints shall be filled with a satisfactory filler which is impervious to
moisture, does not stain or otherwise injure the concrete, and produces a tight joint.
The lining shall present a smooth uniform surface. Lining of sufficient thickness to
resist the pressure of the concrete without deflection may be applied directly to the540
studding if it otherwise complies with the foregoing provisions for form lining.
In designing forms, fresh concrete shall be considered as a liquid weighing 150
lb/cu ft for vertical loads and 100 lb/cu ft for horizontal pressure. A live load allowance
of 50 lb/sq ft shall be used on horizontal projections of surfaces. The scheme of
formwork for work on a span over active railroad tracks shall provide a horizontal
clearance of not less than 8 ft from the centerline of track and a clearance height of not
less than 22 ft from the top of the track rail.
Spreader blocks and bracing shall be removed from the inside of the forms before550
concrete is placed and no portion of wood shall be left in the concrete.
Forms for exposed concrete edges shall be chamfered 3/4 in. Forms shall be given
a bevel or draft in the case of all projections, such as girders and copings, to ensure
easy removal.
Approved ties or anchorages within the forms shall be so constructed as to enable
their removal to a depth of at least 1 in. from the face without injury to the concrete.
Ties may be metal or fiberglass. Ties shall be capable of supporting the designed loads.560
Fiberglass ties shall be ground flush with the face of the concrete surfaces. The cavities
702.12
631
shall be filled with cement mortar and the surface left sound, smooth, even, and
uniform in color. Filling of the cavities will not be required between the fascia beams
or girders on the underside of decks, the bottom surface of slab decks, or the bottom
deck surface of box culverts. In general, tie rods shall be designed to also act as struts
or spreaders. The use of wood struts will not be allowed in copings, railings, and walls
less than 2 ft thick. Devices which, when removed, leave an opening entirely through
the concrete will not be allowed unless approved in writing. Wire ties shall not be
used.
570
Where the bottom of the forms is inaccessible, the lower form boards shall be left
loose or other provisions made so that extraneous material may be removed from the
forms immediately before placing the concrete.
All forms shall be treated with a formulated form coating that allows them to be
released without adhering, discoloring, or otherwise damaging the concrete.
The specifications for forms as they regard design, mortar tightness, filleted
corners, beveled projections, bracing, alignment, removal, re-use, and oiling apply to
metal forms. The metal used for forms shall be of such thickness that the forms remain
true to shape. All bolt and rivet heads shall be countersunk. Clamps, pins, or other
connecting devices shall be designed to hold the forms together rigidly and to allow
removal without injury to the concrete. Metal forms which do not present a smooth
surface or do not line up properly shall not be used. Care shall be exercised to keep
metal forms free from rust, grease, or other foreign matter.590
Fabricated permanent metal forms for concrete deck slabs may be used as an
alternate method of forming on a steel beam, steel girder, prestressed concrete I-beam,
prestressed concrete spread box beam, or prestressed concrete bulb-T beam bridge.
Permanent metal forms shall not be removed and shall otherwise be in accordance with
the applicable requirements of this section.
The metal forms shall be designed based on dead load of the forms, reinforcing
bars, and plastic concrete plus 50 lb/sq ft for construction loads. The unit working600
stress in the steel sheet shall be not more than 0.725 of the specified minimum yield
strength of the material furnished but not to exceed 36,000 psi. Deflection under the
weight of the forms, the plastic concrete, and the reinforcing bars shall not exceed
1/180 of the form span or 1/2 in., whichever is less. However, the deflection loading
shall not be less than 120 lb/sq ft total. The allowable form camber shall be based on
the actual dead load condition. Camber shall not be used to compensate for deflection
in excess of the foregoing limits. The design span of the form sheets shall be the clear
702.13
632
span of the form plus 2 in. measured parallel to the form flutes. If the design span of
the form sheets exceeds 9.5 ft, concrete will not be allowed to be placed in the valleys
of the corrugations of the metal forms. Physical design properties shall be computed610
in accordance with requirements of the American Iron and Steel Institute
Specifications for the Design of Cold Formed Steel Structural Members.
All reinforcing bars shall have a minimum clearance of 1 in. from the forms. The
plan dimensions from the top surface for all primary deck reinforcing bars shall be
maintained. The deck reinforcing bars shall be tied down at a maximum of 6 ft centers.
Permanent metal forms shall not remain in place closer than 1 ft from any joint exposed
to the underside of the slab, except when an overlay is used on the deck.
Fabricator’s working drawings shall be submitted for approval. These drawings620
shall indicate the grade of steel and the physical and section properties for all
permanent metal bridge deck form sheets. If the bridge is a steel beam or steel girder
structure, these drawings shall also include a clear indication of locations where the
forms are supported by steel beam flanges subject to tensile stress. The drawings shall
be certified by a registered professional engineer prior to submittal.
Form sheets shall not rest directly on the top of the beam flanges. Sheets shall be
securely fastened to the form supports and shall have a minimum bearing length of 1
in. at each end. All attachments shall be made by welds, bolts, clips, or other approved
means. Except as amended by these specifications, welding and welds shall be in630
accordance with the requirements of 711.32 pertaining to fillet welds. However, 1/8
in. fillet welds will be allowed. The vertical leg of angles used as form supports shall
not extend higher than the top of the permanent metal form.
Form supports at steel beam or girder bridges shall be placed in direct contact with
the top flange of the beam or girder and shall be adjusted to maintain the required deck
thickness. If straps are used on the top flanges, the straps shall be No. 8 gauge thick,
fit tight, and shall not be galvanized. Form supports shall not be welded to flanges of
non-weldable grades of steel or to steel flanges subject to tensile stresses.
640
Form supports at prestressed concrete I-beam, prestressed concrete spread box
beam, and prestressed concrete bulb-T beam bridges shall be placed in direct contact
with the sides of the box or edge of the I-beam or bulb-T beam flange and shall be
adjusted to maintain the required deck thickness. The form supports may be attached
to steel inserts cast into the top of the box, I-beam, bulb-T beam, straps extending
across the top of the flange, hangers mechanically attached to reinforcing bars
extending from the top flange, or by other approved methods. If straps are used across
the top flange, they shall be No. 8 gauge thick, fit tight, and shall not be galvanized.
Attachments shall not be welded directly to beam reinforcement. In addition, the use
of recesses cast into the beam to serve as form supports will not be allowed.650
All permanently exposed form metal, where the galvanized coating has been
damaged, shall be thoroughly and satisfactorily cleaned, wire brushed, and painted
702.13
633
with two coats of zinc oxide-zinc dust primer in accordance with Federal Specification
MIL-P-2441, Type II, with no color added. Minor heat discoloration in areas of welds
need not be touched up.
Concrete shall be placed in accordance with 702.20. Particular emphasis shall be
placed on proper vibration of the concrete to avoid honeycombs and voids, especially
at construction joints, expansion joints, attachment hardware, and valleys and ends of660
form sheets. Pouring sequences, procedures, and mixes shall be submitted for
approval.
If it is determined that the procedures used during the placement of the concrete
warrant inspection of the underside of the deck, at least one section of the forms shall
be removed at a location and time selected for each span in the contract. This is to be
done as soon after placing the concrete as practical to provide visual evidence that the
concrete mix and the procedures are obtaining the desired results. An additional
section shall be removed if it is determined that there has been any change in the
concrete mix or in the procedures warranting additional inspection.670
After the deck concrete has been in place for a minimum of two days, the concrete
shall be tested for soundness and bonding to the forms by sounding with a hammer as
directed. If areas of doubtful soundness are detected by this procedure, the forms shall
be removed from such areas for visual inspection after the pour has attained adequate
strength. This removal of the permanent metal bridge deck forms shall be with no
additional payment. At locations where sections of the forms are removed, form
replacement will not be required, but the adjacent metal forms and supports shall be
repaired to present a neat appearance and ensure their satisfactory retention. As soon
as the form is removed, the concrete surfaces will be examined for cavities,680
honeycombs, and other defects. If irregularities are found, and it is determined that
these irregularities do not justify rejection of the work, the concrete shall be repaired
as directed and shall be given a finish in accordance with 702.21. If the concrete where
the form is removed is unsatisfactory, additional forms, as necessary, shall be removed
to inspect and repair the slab, and the methods of construction shall be modified as
required to obtain satisfactory concrete in the slab. All unsatisfactory concrete shall be
removed or repaired as directed.
The amount of sounding and form removal may be moderated as directed after a
substantial amount of slab has been constructed and inspected, if the methods of690
construction and the results of the inspections as outlined above indicate that sound
concrete is being obtained throughout the slabs. All necessary facilities shall be
provided for the safe and convenient performance of inspection procedures.
The forms for any portion of the structure shall not be removed until the concrete
is strong enough to withstand damage. If field operations are not controlled by beam
702.13
634
or cylinder tests, the following periods, exclusive of days when the ambient700
temperature is below 40°F, for removal of forms and supports may be used as a guide.
Centering under beams ....................................................... 15 days
Roadway Slabs ................................................................... 7 days
Walls, Columns, Sides of Beams, and all other parts ......... 12 h
If high-early strength cement is used, these periods may be reduced as directed. If
portland-pozzolan cement, types IP or IP-A, fly ash or slag cement is used in the
structural concrete as a pozzolan, these periods shall not apply and the removal of
forms and supports shall be controlled by test beams in accordance with 702.13(h).710
To obtain a satisfactory surface finish, forms for railings, parapets, and exposed
vertical surfaces shall be removed no less than 12 h and no more than 48 h after the
concrete is placed, depending on weather conditions.
Copings, corners, and projections shall not be cracked or injured during the
removal of the forms. If damage occurs, the amount of concrete adjacent to the
damaged portion shall be removed and replaced as directed with no additional
payment.
720
The shape, strength, rigidity, water-tightness, and surface smoothness of re-used
forms shall be maintained at all times. Any warped or bulged lumber shall be re-sized
before being used. Unsatisfactory forms shall not be used.
When portland-pozzolan cement, types IP or IP-A, is incorporated into the
structural concrete elements listed below, when fly ash or slag cement is incorporated
into the structural concrete elements listed below, or when field operations are being
controlled by beam tests, the removal of forms will be allowed when the modulus of
rupture reaches or exceeds the following values:730
Concrete Use Required Flexural Strength, psi,
Dead Load Only
Girders, Arches, and similar units 390
Interior Bent or Pier Caps 480
The beams will be cured under the same conditions as the concrete which they
represent. Beams will be tested for flexural strength as simple beams with third-point
loading in accordance with 505.
702.14Falsework and Centering
Detailed working drawings for falsework and arch centering shall be submitted in
accordance with 105.02. Since the quality of the lumber is not known and because of
the uncertainty of computing nailed joints, no responsibility will be assumed by the740
Department for the strength of falsework and centering.
702.14
635
Working drawings for falsework shall include details for support of interior bent
caps, hammerhead piers, and the portion of the bridge floor and coping beyond fascia
girders or beams if the overhang is 18 in. or more, or if a finishing machine, concrete
spreader, or other equipment is to be supported by the overhang.
The scheme of falsework for work on a span over active railroad tracks shall
provide a minimum horizontal clearance of 13 ft from the centerline of the nearest
tangent track or 14 ft from the centerline of the nearest track on a horizontal curve and750
a minimum vertical clearance of 22 ft from the top of the highest track rail unless
different clearance values are approved by the railroad.
Falsework shall be designed and constructed to safely carry the full load applied
with a minimum settlement and deflection and with sufficient camber to counteract
unavoidable shrinkage, deformation, and settlement. Structures shall have a permanent
camber only when shown on the plans and the falsework shall be set to provide it.
For designing falsework and centering, a weight of 150 lb/cu ft shall be assumed760
for plastic concrete. A live load allowance of 50 lb/sq ft shall be added for horizontal
projections of surfaces. All beams supporting plastic concrete shall be designed so that
there are no appreciable deflections under full load. The beams shall be considered as
being unsupported by knee-bracing, such bracing to be considered as relieving sagging
and bending only. The use of inclined columns, where properly braced, will be
allowed.
The unsupported lengths of wooden columns and compression members shall not
exceed 30 times the dimensions of the least side, or 30 times the least diameter.
770
Unit stresses in timber shall not exceed the following:
For Douglas fir, white oak, long-leaf yellow pine:
Bending................................................... 1,800 psi
Columns.................................................. 1,800 (1-L/60D) psi
For spruce, cypress, short-leaf pine, white pine, western hemlock:
Bending................................................... 1,500 psi
Columns.................................................. 1,500 (1-L/60D) psi
780
In the above:
L = length of column in inches
D = least diameter or least dimension in inches.
Hardwood wedges may be required to take up any settlement in the falsework,
either before or during the placing of concrete.
702.14
636
Arch centering shall be constructed to enable it to be lowered or released gradually
and uniformly after pouring arch ribs and rings. Lagging for arch centering shall be of
uniform thickness. Unless otherwise specified, the nominal thickness shall be no less790
than 2 in. A smooth surface shall be produced on the undersides of arch rings. The
upper sides of all lagging shall be oiled before concrete is placed.
Unless driving of piles for falsework bents is precluded by soil or other special
conditions or unless otherwise specified, all bents for falsework shall have driven piles.
These shall be driven to support the required loads without settlement, spacing, and
subsequent removal shall be satisfactory.
If permission is given to place frame bents, they shall be placed on continuous
concrete mudsills, or as approved.800
Unless otherwise specified, the following shall apply to the removal of falsework
and centering:
by beams or girders shall remain in place at least seven days
after concrete placement and until attaining or exceeding 480
psi flexural strength. Operations on the slab may continue after
achieving the required flexural strength. No additional concrete810
shall be cast until the falsework has been released.
including the bridge deck overhang shall remain in place at least
three days after concrete placement and until attaining or
exceeding 480 psi flexural strength. Falsework jacks may be
loosened, but not removed, and operations may continue on
overhangs three days after concrete placement and achieving
the required flexural strength. Falsework jacks may be removed
after seven days.820
pier caps, shall remain in place at least three days after concrete
placement and until attaining or exceeding 480 psi flexural
strength.
shall not be released from any one span until the adjacent and
spandrel walls have cured for the required time and the next
adjacent arch ring has been poured for at least 48 h.830
girder units shall not be released from any span until the entire
702.14
637
continuous unit has been completed and all concrete cured for
the required period.
November, or any time between April and October when the
average temperature is less than 50°F, the above periods shall
be increased 20%. For concrete poured during December,840
January, and February, they shall be increased 40%.
to take the stresses, due to its own weight, uniformly and
gradually.
Permission for removal may be refused if it is determined that
there may be resulting damage to the structure.
850
702.15Joints
Construction joints shall be located across regions of low shearing stress and, so
far as possible, where they are hidden from view in the finished structure. They shall
be made only where shown on the plans, unless otherwise specified.
Placing of concrete shall be continuous between construction joints. If placing is
interrupted and a construction joint becomes necessary, provisions shall be made for
interlocking with the preceding layer by constructing raised keyways as shown on the860
plans or as directed.
When fresh concrete is intended to be joined to concrete that has already set, the
surface of the in-place concrete shall be cut with a suitable tool to remove all loose
and foreign material. The cut surface shall then be scrubbed with wire brooms and
kept wet until the new concrete is placed thereon. Immediately before the new concrete
is placed, the forms shall be drawn tight against the in-place concrete and the exposed
surface of the concrete shall be coated with a thin coating of mortar composed on one
part cement and two parts No. 23 sand.
870
All concrete for slabs, beams, girders, cantilevered brackets, and footings shall be
placed in one continuous operation to form monolithic construction. However, if,
because of rain or other unavoidable reasons, concreting is interrupted where
monolithic construction is required, the concrete shall be kept plastic by placing
frequent small batches until this part of the work is completed or until normal
operations can be resumed. If the interruption is such that even partial operations
cannot be carried on and construction joints are unavoidable, the joints shall be made
in planes exactly normal to the main reinforcing bars and only where the shear is at a
702.15
638
minimum. In simply supported slabs, beams, and girders, such regions of minimum
shear are at or near the center of the span.880
Unless otherwise provided, pours in all abutments for an arch bridge shall be
continuous from the top of footing to the skewback. If it is advisable to pour only a
portion of the abutment at one time, a vertical construction joint may be placed parallel
to the major reinforcement of the arch ring with written permission.
Horizontal construction joints will not be allowed in footings. If there is a
probability that the entire amount of concrete cannot be poured monolithically, vertical
or other construction joints shall be provided as directed.
890
Horizontal construction joints in the shafts of reinforced piers, retaining walls,
and abutments, other than abutments for arch bridges, may be made only if approved.
Where such joints show on an exposed surface, special care shall be taken to make the
joints truly straight, clean, and watertight. To avoid visible joints so far as possible on
exposed faces, the top surface of the concrete shall be finished to the underside of a
strip nailed to the form work for the exposed surface of the concrete, the strip to be
placed as directed. If such a horizontal joint intersects any coping or any sloping
surface where a featheredge would be formed, an inclined bulkhead shall be placed to
make the joint normal to the sloping surface for a distance of no less than 6 in. or, if
there is a coping, no less than the depth of the coping. Horizontal construction joints900
will not be allowed in the stems of concrete T-beams or at the junction of T-beam
stems and flanges.
Bridge expansion joints shall be of the form, dimensions, material, and design
shown on the plans. Open expansion joints shall be completely open for the
dimensions specified and for their entire length. Preformed expansion joint filler shall
be placed true and even and with abutting sections pressed together tightly. The
material shall be of the size shown on the plans and shall be in accordance with 906.03.
910
These joints shall be free from kinks and watertight. At bends, the strip shall be
one piece if possible. Unless otherwise shown on the plans, the joints shall be soldered.
Copper shall be in accordance with 910.16. Lead sheets shall be no less than 1/8 in.
thick.
The surface of the supporting concrete for a sliding joint shall be troweled to a
smooth finish and then covered with the required thickness of bituminous material, or
otherwise treated if so designated.920
Polychloroprene joint membrane used for semi-integral end bents shall be secured
to the concrete with an adhesive. The polychloroprene joint membrane shall be
702.15
639
centered vertically on the joint and shall have no gaps. Any field joint in the
polychloroprene membrane shall be lapped a minimum of 12 in.
702.16Drainage Pipes Through Concrete Masonry
At all enclosures where water could not otherwise escape through the concrete,
drainage pipes shall be installed as shown on the plans. Before fill is placed around930
these pipes, geotextile for use with underdrains shall be placed over the drain pipe and
securely held in place. Loose stone shall be laid by hand over the inlet end to provide
a cover sufficient to retain the fill and enable free drainage. Drains through abutments
and retaining walls shall be placed with a slight incline downward towards the exposed
face.
702.17Encased Pipes and Conduits
Pipes and conduits to be encased in the concrete shall be installed before the
concrete is placed. No direct compensation will be made for the installation of the
pipes and conduits. No deduction in concrete quantities will be made for the volume940
occupied.
702.18Roadway Surface Drainage
Drainage grates and basins, necessary fittings, and connections to drainage pipes
shall be placed as shown on the plans or as directed.
702.19Pouring Bent Caps
Caps shall not be poured on end bents or on any other bents falling within the
limits of the approach grade until the fill material has been placed.
950
702.20Placing Concrete
Concrete shall not be placed until forms and reinforcing bars have been checked
and approved. The forms shall be clean of all debris before concrete is placed. The
method and sequence of placing concrete shall be approved.
Where concrete floor slabs are to be poured, walkways shall be provided to protect
reinforcement from pedestrian traffic. Before placing concrete, continuous walkways
shall be placed parallel to the section of floor to be poured and shall remain in place960
until after the concrete is placed and hardened sufficiently to avoid any damage.
Walkways shall be constructed to not come in contact with the reinforcement and shall
be of sufficient width to allow finishing operations to be conducted entirely from the
walkway.
Except as otherwise directed, concrete shall be placed in horizontal layers of no
more than 24 in. thick. When less than a complete layer is placed in one operation, it
shall be terminated by a vertical bulkhead. In order to avoid planes of separation
between the layers and damage to the plastic concrete beneath, each layer shall be
placed and consolidated before the preceding layer has taken initial set. On horizontal970
702.20
640
surfaces and at horizontal construction joints, the forms shall be overfilled
approximately 1/2 in. and then struck off to the required elevation prior to the initial
set of the concrete.
When placing is temporarily discontinued and as soon as it becomes firm enough
to retain its shape, the concrete shall be cleaned of all laitance and other objectionable
material to a depth sufficient to expose sound concrete. Unless otherwise authorized,
depositing concrete shall not be discontinued within 18 in. of the top of a face.
However, if provisions have been made for a coping of less than 18 in. thick, a
construction joint may be made at the underside of the coping.980
Where new concrete is to abut existing concrete, the existing concrete surfaces
and existing exposed reinforcement shall be cleaned free of dust, chips, and water.
Epoxy resin adhesive, in accordance with 909.11, shall be used to coat the existing
concrete surfaces. The epoxy coating shall be tacky at the time that the new concrete
is placed. If the epoxy coating has cured beyond the obvious tacky condition, it shall
be reapplied prior to placing the new concrete.
After initial set of the concrete, the forms shall not be jarred and no strain shall be
placed on the ends of projecting reinforcement.990
The external surface of all concrete shall be worked thoroughly, during placing,
by means of tools of an approved type. The working shall be such as to force all coarse
aggregate from the surface and to bring mortar against the forms to produce a smooth
finish substantially free from water and air pockets or honeycomb.
Concrete shall be placed to avoid segregation of the materials and the
displacement of the reinforcement. Where steep slopes are required, the chutes shall
be equipped with baffle boards or be in short lengths that reverse the direction of1000
movement. Open troughs and chutes shall extend as nearly as possible to the point of
deposit. Equipment made of or coated with aluminum alloys shall not be used to
transport concrete. Pumping of concrete shall be in accordance with 702.10. When the
discharge needs to be intermittent, a hopper or other device for regulating the discharge
shall be provided. Placement of supplementary bins or hoppers may be ordered above
the point where concrete is being deposited. The concrete shall be allowed to
accumulate in these containers in considerable quantity and shall be discharged
immediately through pipes extending from the bottoms of these bins or hoppers. All
chutes, troughs, and pipes shall be kept clean and free from coatings of hardened
concrete. The water used for flushing shall be discharged clear of the concrete already1010
in place.
Concrete shall not be dropped in the forms a distance of more than 5 ft except
when confined by closed chutes or pipes. Each part of the form shall be filled by
depositing the concrete as near final position as possible. The coarse aggregate shall
be worked back from the forms and worked around the reinforcement without
702.20
641
displacing the bars. After initial set of the concrete, the forms shall not be jarred and
no strain shall be placed on the ends of projecting reinforcement.
Unless otherwise directed, the concrete shall be compacted with mechanical
vibrators operating within the concrete. When required, vibrating shall be
supplemented by hand spading with suitable tools to ensure proper and adequate
compaction. Vibrators shall be of an approved type and design, adequately powered
and capable of transmitting 10,800 impulses per minute in air. The diameter of the
head of the vibrator shall be 1 1/4 to 2 1/2 in. Vibrators shall be manipulated so that
the concrete is thoroughly worked around the reinforcement and imbedded fixtures
and into corners and angles of the forms. Vibrators shall not be used as a means to
cause concrete to flow or run into position in lieu of placing. The vibration at any point
shall be of sufficient duration to accomplish compaction but shall not be prolonged to1030
the point where segregation occurs. Vibrators shall not be attached to or allowed to
contact forms or reinforcement or to penetrate beyond any layer of fresh concrete.
No concrete except for foundation seals shall be deposited under water, without
written permission. If such permission is granted, care shall be exercised to prevent
the formation of laitance. Concrete shall not be deposited until any laitance, which
may have formed on concrete previously placed, has been removed. Pumping shall be
discontinued while depositing foundation concrete if it results in a flow of water inside
the forms. If concrete, except for foundation seals, is deposited under water, the1040
proportion of cement used shall be increased at least 25% with no additional payment
to compensate for losses due to water. Concrete deposited under water shall be placed
in a compact mass in its final position by means of a tremie, a closed bottom dump
bucket, or other approved method and shall not be disturbed after being deposited.
A tremie shall consist of a tube having a diameter of no less than 10 in. and
constructed in sections having flanged couplings fitted with gaskets. Support of the
tremie shall be such that it enables free movement of the discharge end over the entire
top surface of the area on which the concrete is to be deposited and allows rapid
lowering, when necessary, to retard or stop the flow of the concrete. The discharge end1050
shall be kept closed until immediately prior to depositing in order to prevent water
entering the tube and shall be completely sealed except when concrete is actually being
deposited. The tremie tube shall be kept full to the bottom of the hopper. When a batch
is dumped into the hopper, the flow of concrete through the tube shall be started by
slightly raising the discharge end, but always keeping it in the previously deposited
concrete. The flow shall be continuous until all the required concrete is deposited.
Except as otherwise provided for a foundation seal, footing concrete shall not be
placed except when the cofferdam is dewatered and so maintained during placement.1060
702.20
642
If it is necessary to operate the pump while placing footing concrete, or
immediately thereafter, the seepage water shall be conducted to a sump at the pump
intake in such manner that it does not flow over the fresh concrete. Special care shall
be taken to prevent pumping cement out of the fresh concrete.
Footing concrete may be placed directly against sheet piling of the cofferdam
when shown on the plans or authorized in writing. Where class X excavation has been
extended beyond established neat lines of a footing, the bottom 12 in. of such footing
shall be poured to the actual limits of the excavation. When necessary, the foundation1070
material on which the footing is to rest shall be protected from freezing. Where an
existing structure is to be extended, the existing footings shall be protected from
damage. Damaged footings shall be repaired as directed with no additional payment.
Piling, if any, shall be driven to or cut off at the proper elevation to enable
embedment in the footing concrete equal to that shown on the plans. All laitance or
other unsatisfactory material shall be removed from the exposed surface of the
concrete in place by some means which does not injure the concrete. If a footing is to
be constructed on a foundation seal, it shall be to the dimensions shown on the plans
and, if necessary, the height of the shaft adjusted to bring the bridge seat to the required1080
elevation.
Placing concrete in footings shall start at one end of the footing and be continued
until the surface of the concrete is brought to the elevation of the top of the footing.
The concrete shall be allowed to work forward, displacing any water with as little help
as possible. The concrete shall not be dragged through or shoveled into water or
deposited into running water. Placing concrete in more than a few inches of water shall
be done only with written permission.
A foundation seal may be required by the plans, as requested, or as directed. When
required by the plans, the seal shall be constructed to the size shown, or as specified
in writing. Where adverse dewatering conditions are encountered as described in
206.09, a foundation seal may be required to be placed to the necessary dimensions
If a foundation seal is requested, written permission shall be obtained before
starting such work. If approval is given, the seal shall be placed to designated
dimensions.
Seals shall be of class A concrete having a slump in accordance with 702.12,1100
placed continuously from start to finish, and in accordance with 702.20(d). The
cofferdam shall have been vented or ported at low-water level. The seal shall be of the
thickness shown on the plans, or as requested and approved. When the seal has
hardened sufficiently to withstand the hydrostatic pressure, the cofferdam shall be
dewatered and the remainder of the structural concrete shall be placed in dry
conditions.
702.20
643
702.21Finishing Concrete Surfaces
Unless otherwise authorized, the surface of the concrete shall be finished
immediately after form removal. Only the minimum amount of covering necessary to1110
allow finishing operations to be carried on shall be removed at one time. Subject to
approval, metal ties may be left in the concrete for the purpose of supporting or bracing
subsequent work. Such ties shall be in accordance with 702.13(b) and shall be of a
type which uses a cone and rod as both spreader and tie. Before final acceptance of the
work, the cones shall be removed and the cavities filled, in accordance with 702.13(b).
All concrete surfaces shall be given a finish immediately following the removal
of any forms.
At the time of the removal of forms, the concrete surface shall be scraped to1120
remove all fins and irregular projections. The surface shall then be power ground to
smooth all joints and chamfers.
After grinding is completed, a paste of grout shall be applied to the concrete
surface with a sponge float to fill all air holes and small irregularities. The paste grout
shall be six parts of pre-mix mortar mix for masonry and one part white portland
cement in accordance with ASTM C150, Type 1.
After the paste grout takes its initial set, the surface of the concrete shall be
scraped with a steel drywall knife to remove the paste from the surface.1130
The concrete surfaces of pier and bent caps, the front face of mudwalls, and any
other concrete surfaces specified shall be sealed. The material used for sealing shall
be in accordance with 709. It shall be applied to obtain a finished film thickness of at
least 10 mils. Mixing, surface preparation, and method of application shall be in
accordance with the manufacturer’s recommendations. However, the surfaces to be
sealed shall be prepared in accordance with 709 prior to applying the sealer.
702.22Curing Concrete
Concrete in bridge decks or the top surface of reinforced concrete slab bridges1140
shall be cured continuously 24 h per day for a minimum of 168 h commencing
immediately after the surface is able to support the protective covering without
deformation. Water curing in accordance with 702.22(a) shall be initiated within 60
minutes after the finishing machine completes the final strike-off of any portion of the
concrete surface. Curing or other protective efforts which may include the use of
evaporative retardants shall begin sooner if adverse conditions exist. Adverse
conditions include, but are not limited to, high winds, extreme temperatures, or low
humidity. A work bridge shall be used following the finishing machine to facilitate the
placement of curing materials, if necessary. Curing time for bridge decks and the top
surface of reinforced concrete slab bridges are not controlled by beam tests and the1150
cure time shall not be reduced. In addition to the minimum of 168 h cure period, curing
shall continue until a flexural strength of 550 psi has been attained. Curing of patches
or small full depth deck replacement areas on existing bridge decks that are to be
702.22
644
overlaid, may be controlled by test beams in accordance with 702.24(a).
Unless otherwise specified, all other concrete shall be cured continuously 24 h per
day for at least 96 h commencing immediately after the surface is able to support the
protective covering without deformation. In addition to the required hours, curing shall
continue until the flexural strength stated in 702.13(h) and 702.24 has been attained.
1160
Where it has been determined that a surface treatment is to be used, the membrane
forming curing compound shall not be used. Membrane forming curing compound
shall not be used on bridge decks nor on reinforced concrete slab bridges.
The curing of surfaces to be waterproofed may be discontinued when
waterproofing is started.
If further precautions are necessary to ensure strength, they shall be taken as
directed.
1170
Surfaces to be cured shall be protected and kept continuously and thoroughly wet
during the curing period. Curing shall consist of pre-wetted burlap underneath a layer
of white plastic sheeting with a network of soaker hoses. Other wet curing systems
including engineered mats or blankets shall be submitted to the Engineer for approval
at least 14 days prior to use. Burlap shall be free of contamination and shall be prepared
by soaking in clean water for at least 2 h before beginning concrete placement. New
burlap shall be soaked at least 12 h prior to use. Immediately before use, the burlap
shall be draped or suspended vertically to remove excess water that may dilute or
damage plastic concrete. Soaker hoses shall be placed after the concrete is hard enough1180
to walk on without deformation. The protective covering shall be suitably anchored to
keep the protective materials in place during the curing period. Curbs, walls, handrails,
copings, and other surfaces requiring a finish in accordance with 702.21 may have the
covering temporarily removed for finishing, but the covering shall be restored as soon
as possible.
All surfaces shall be given the required surface finish prior to application of the
curing compound. During the finishing period, the concrete shall be protected by the
water curing method.1190
The curing compound shall be mixed thoroughly within 1 h before use. The
application shall be a minimum spreading rate of 1 gal. of liquid coating for every 150
sq ft of concrete surface. Curing compound shall be applied to provide a uniform,
solid, white opaque coverage on all surfaces, similar to a white sheet of paper. All
concrete cured by this method shall receive two applications of the curing compound.
The first application shall be applied immediately after stripping of forms and
acceptance of the concrete finish. If the surface is dry, the concrete shall be wetted
with water and the curing compound applied just as the surface film of water
702.22
645
disappears. The second application shall be applied after the first application has set.1200
During curing operations all unsprayed surfaces shall be kept wet with water.
The coating shall be protected against marring for at least 10 days after
application. All coatings marred or otherwise disturbed shall be given an additional
coating. If the surface coating is continuously subjected to injury, immediate
application of water curing may be required. If the use of a curing compound results
in a streaked or blotchy appearance, the method shall be stopped and water curing
applied until the cause of the defective appearance is corrected.
702.23Waterproofing1210
The expansion joint shall be waterproofed on the following:
The inside face of spandrel walls and extrados of arches shall be waterproofed.
1220
A firmly bonded membrane consisting of two layers of dry fabric and three
applications of waterproofing material, shall be placed at all expansion joints set out
herein. One uncoated layer of fabric shall not touch another layer or the concrete at
any point. There shall be at least three complete and separate applications of the
waterproofing material. The application shall be sufficiently heavy to conceal the
weave in the fabric. Sufficient fabric shall be placed in V-strips at the joints to enable
the movement of adjacent sections of concrete without tearing the fabric. The
membrane shall be carefully flashed at all exposed edges and laps sealed down
thoroughly. Waterproofing shall be planned so that, at the close of work each day, all
fabric placed shall have received the final application of waterproofing material.1230
Concrete surfaces to be waterproofed shall be reasonably smooth and free from
projections and holes. Immediately before the application, the surface shall be cleaned
of dust and loose materials. Waterproofing shall be done only when the surface is at
least dry enough to prevent the formation of steam when the hot material is applied.
When the air temperature is below 35°F, waterproofing shall not be done, unless
otherwise specified.
The material shall be applied to cover the area completely. If necessary, more than
one coat shall be applied to secure a satisfactory coating and proper adhesion. Coating1240
and fabric shall stop a uniform distance below the top surfaces of walls. The material
shall not be splattered over surfaces or faces of concrete which subsequently are
exposed in the finished structure. Utility asphalt for waterproofing shall be heated to a
temperature of between 300°F and 350°F. The material shall be stirred frequently to
702.23
646
prevent local overheating. The waterproofing material shall not be damaged when
backfill is placed against a waterproofed joint.
702.24Application of Loads to and Acceptance of New Concrete
Except as otherwise hereinafter provided, application of loads to new concrete
shall be in accordance with the following:1250
beams representing all concrete required to carry live loads have
attained a flexural strength of 550 psi for third-point loading.
representing the concrete required to resist it have attained a flexural
strength of 440 psi for third-point loading. The unbalanced height
shall not exceed 10 ft until test beams representing the concrete have
attained a flexural strength of 480 psi for third-point loading.1260
be placed on concrete until test beams representing the concrete have
attained a flexural strength of 400 psi for third-point loading. A dead
load shall not be placed on hammer-head piers until test beams
representing the concrete have attained a flexural strength of at least
480 psi for third-point loading. The concrete floor, if to be placed
thereon, shall not be poured until test beams representing the
concrete supporting the superstructure have attained a flexural
strength of at least 440 psi for third-point loading.1270
falsework shall attain a flexural strength of a minimum of 480 psi
for third-point loading, before a dead load of concrete is applied.
are used in bridge railings or concrete barrier and the temperature
limitations in accordance with 702.05 are not met, the bridge railings
or concrete barrier may be put into service when flexural strength
testing performed on test specimens indicate a modulus of rupture1280
of 500 psi has been attained.
No time extension will be considered for delays due to time necessary to attain
specified strengths.
Beams will be prepared and tested in accordance with 702.13(h). Before traffic is
allowed over a concrete structure built to be under fill, it shall be covered with 9 in. or
more of earth or other suitable material, or otherwise protected. All other structures
shall be properly protected against impact or other damage.
1290
702.24
647
When compressive strength is used as a basis for acceptance of concrete, for
determining when a latex modified concrete overlaid bridge deck may be opened to
traffic, for determining form removal time, or for determining when a structure may
be put into service, standard specimens shall be made and cured in accordance with
ASTM C31 and shall be tested in accordance with ASTM C39. Strength requirements
shall be in accordance with ASTM C94, with the exception that the strength shall be
the average of the strengths of all cylinders tested at the age specified, with a minimum
of two cylinders. This average shall be equal to or greater than the required strength.
If the compressive strength of one or more cylinders in a strength test is below 75% of
the required strength, the entire test will be considered as failed.1300
Failure to meet the strength requirements will be cause for rejection of the quantity
of concrete represented by the cylinders. All molds, facilities, and materials necessary
to prepare and cure the specimens shall be furnished with no additional payment.
702.25Field Drilled Holes in Concrete
This work shall consist of field drilling holes of the diameter and length shown on
the plans or as directed.
When vertical holes are to be drilled into the top of a concrete bridge deck, a1310
minimum clearance of 2 in. shall be maintained between the bottoms of holes and
bottom of slab. When vertical holes are to be drilled over a steel beam flange, the holes
may be extended to the top of the beam flange. When vertical holes are to be drilled
over a concrete I-beam, concrete box beam, concrete bulb-T beam, or concrete girder,
the depths of the holes shall be as shown on the plans. If breakout occurs on the bottom
of slab during the drilling process, the work shall be stopped, the breakout shall be
repaired as directed, and an approved alternate drilling method shall be used to prevent
breakout.
When grouted holes are specified, the diameter and length of the holes shall be in1320
accordance with the grout manufacturer’s recommendations.
702.26Artificial Lighting
No portion of the work which cannot be finished during daylight hours shall be
started unless written permission is given, in which case adequate lighting shall be
provided and maintained.
702.27Method of Measurement
Concrete will be measured by the cubic yard in accordance with the neat lines
shown on the plans or as directed. No deductions will be made for the volume of joint1330
material, embedded reinforcement, encased piles, or for a pipe with an area of less
than 1 sq ft.
Cast iron grates, basins, and fittings will be measured by the number of complete
assemblies installed. Drainage pipe through concrete masonry will be measured in
702.27
648
accordance with 715. Field drilled holes will be measured by the number of holes
drilled.
Concrete in railings will be measured in accordance with 706.07. Reinforcing bars
will be measured in accordance with 703.07.1340
702.28Basis of Payment
The accepted quantities of structural concrete will be paid for at the contract unit
price per cubic yard of concrete, for the class and use specified. Cast iron grates,
basins, and fittings will be paid for at the contract unit price per each assembly,
complete in place. Steel drain pipe will be paid for at the contract lump sum price.
Field drilled holes in concrete will be paid for at the contract unit price per each.
Concrete in railings will be paid for in accordance with 706.08. Reinforcing bars
will be paid for in accordance with 703.08. Drainage pipe through concrete masonry1350
will be paid for in accordance with 715.
If a foundation seal is constructed as shown on the plans, it will be paid for at the
contract price per cubic yard for concrete, foundation seal. If ordered to be done, or
allowed to be done, payment will be made at a unit price per cubic yard equal to 75%
of the contract unit price per cubic yard for class B concrete in footings. The
excavation for the foundation seal will be paid for at the contract unit price per cubic
yard for the class of excavation specified for the footing. Unless otherwise provided,
the pay quantity for excavation for foundation seal will be equal to the theoretical
volume bounded by the bottom of the proposed footing, the bottom of the approved1360
excavation, and vertical planes 18 in. outside the neat line of the footing and parallel
thereto, regardless of the quantity actually removed. If design of the structure requires
sheeting to be outside these limits, the limits will be extended to 6 in. beyond the neat
lines required by the design of the structure. If the Contractor chooses to construct a
rectangular cofferdam around a U-shaped abutment in lieu of following the outline of
the footing, the maximum allowable increase in the pay quantity above the theoretical
shall not exceed 25%. The pay quantity for the foundation seal will be equal to the
excavation volume described above.
Payment will be made under:1370
Pay Item Pay Unit Symbol
Concrete, A, Substructure.......................................................... CYS
Concrete, A, Superstructure....................................................... CYS
Concrete, B, Above Footings .................................................... CYS
Concrete, B, Footings ................................................................ CYS
Concrete, C, ____ ...................................................................... CYS
use
Concrete, Foundation Seal......................................................... CYS1380
Field Drilled Hole in Concrete .................................................. EACH
Grates, Basins, and Fittings, Cast Iron ...................................... EACH
702.28
649
The cost of forms, PVC for bridge floor drains, falsework, falsework piling,
centering, expansion joints, preformed expansion joint filler, waterproofing, curing,
finishing, and necessary incidentals shall be included in the cost of the pay items. The
cost of placing epoxy resin adhesive on existing concrete surfaces shall be included in
the cost of new concrete which abuts the existing concrete. Payment for concrete used
in footings in class X excavation will be made at the contract unit price only for the
cubic yards placed within the neat lines of the footings as shown on the plans or as1390
revised.
If the Contractor elects to increase the cement content as allowed herein, no
additional compensation will be made.
The cost of permanent metal forms shall be included in the cost of concrete, C,
superstructure. The pay quantity of concrete in the slab will be computed from the
dimensions shown on the plans, with no allowance for form deflection or geometry.
Elastomeric bearings will not be paid for directly, unless otherwise specified. The1400
cost thereof shall be included in the cost of the structural member they support. The
cost of protecting existing footings to be extended shall be included in the cost of
concrete, B, footings, unless otherwise specified.
The cost of grout for grouting reinforcing bars in place, the length of grouted hole
recommended by the grout manufacturer in excess of the length shown on the plans,
and the additional length of reinforcing bars required shall be included in the cost of
field drilled hole in concrete.
The cost of furnishing and installing polychloroprene sheeting shall be included1410
in the cost of concrete, A, substructure.
The cost of high density plastic bearing strips shall be included in the cost of
concrete, A, substructure.