711.01Description
This work shall consist of furnishing, fabricating, erecting, and painting steel structures and parts of structures, except steel piling, in accordance with 105.03.
MATERIALS
711.02Materials
Materials shall be in acco rdance with the following: 10
Bronze and Copper-Alloy ............................................ 910.06 Casti ngs ....................................................................... 910.05 Elastomeric Bearings ................................................... 915.04 Steel Forgings and Steel Shafting ................................ 910.04 Structural Steel ............................................................ 910.02
Where grade HPS 70W or grade HPS 50W steel is shown on the plans, the high performance steel shall be in accordance with 910.02(d).
Where grade 50W steel is shown on the plans, the weathering steel shall be in accordance with 910.02(b).
Material specifications shall be shown on the working drawings if the materials are different than those shown on the plans. Materials which do not require mill test reports may be changed from those shown on the plans subject to approval.
Sheared plates or universal mill plates sh all be used for girder webs. Such plates shall be ordered with sufficient additiona l width to allow for trimming of edges to provide built-in camber for dead load defl ection and vertical cu rve. Sheared plates 30 thicker than 1/2 in. shall be planed in accordance with 711.14.
FABRICATION
711.03General Requirements
The fabrication methods used shall be those applicable to and prescribed for the several parts of fabrication as it progres ses and shall be in accordance with the 711.01
requirements thereof and as further set out in this specification. Workmanship and finish shall be first-class, equal to the be st general practice in a modern fabricating shop, and in strict accordance with these specifications, the plans, and such additional 40 instructions as may be given.
Fabrication of high performance steel shall be in accordance with the Guide Specification for Highway Bridge Fabrication with HPS 70W Steel except as modified herein.
The requirements contained herein will not be waived, nor will they be modified to conform with any set of rules that any shop has adopted as its standard unless so authorized in writing.
Structural steel, regardless of its source, shall be fabricated within the continental limits of the United States of America.
711.04Certification of Fabricators
If the fabrication of secondary structural steel members and other miscellaneous structural steel components, such as but not limited to, diaphragms, bearing assemblies, and miscellaneous plates does not involve any welding or heating of the steel, the fabrication facility for these components will not be required to be American 60 Institute of Steel Construction, AISC, certified as described in this section.
Prior to approval for fabrication, the results of the latest AISC certification review shall be made available to the Engineer to determine if items critical to successful fabrication meet the needs of the specific work.
The fabricator shall be certified from the start of the fabrication process, through and including the shop assembly in accordance with 711.44. If the certification lapses during the project, the fabricator shall have plans to maintain certification or complete the fabrication process before the expiration of the certification. Failure of the 70 fabricator to maintain valid certification during the fabrication will result in a 10% reduction in the bid price for structural steel.
Approval of the fabricator shall be requested in writing prior to ordering structural steel. A valid certification with annual endorsement shall be submitted with the request.
The fabricator of structural steel furnished under this section shall be certified in accordance with the AI SC Certification Program for Steel Bridge Fabricators – 80 Standard for Steel Bridges, to the certification category commensurate with the work to be fabricated. Fabricators producing fracture-critical members, intermediate bridges, or advanced bridges, shall also meet the applicable supplemental requirements 711.04
of the certification program. For shop painting, the Department will only accept an AISC-420-10/SSPC-QP 3 certification. It sh all be the fabricator’s responsibility to maintain a valid certification and annual endorsements thereto.
Fabricators of main load-carrying components for simple span bridges or bridges that do not have welded or bolted splices shall, as a minimum, be certified under the 90 simple bridges category.
Fabricators of main load-carrying components for the following types of structures shall, as a minimum, be certified under the intermediate bridges category:
or with a radius greater than 500 ft,
depth, with or without splices, either straight or with a radius greater than 500 ft,
either straight or with a radius greater than 1,000 ft,
substantially pre-assembled at the certified facility and shipped in no more than three subassemblies.
Fabricators of main load-carrying components for the following types of structures shall be certified under the advanced bridges category:
specified for the intermediate bridges category above. 130 711.04
711.05Working Drawings
Working drawings shall be submitted in accordance with 105.02.
Working drawings shall include a detailed bill of materials showing weights of materials completed in accordance with 711.73(b) if payment is on a unit weight basis. The working drawings shall indicate whether reaming is to be done in the shop or in the field. The working drawings shall indicate which splices are to be eliminated.
If the contract plans include detailed stru ctural steel drawings, they may be used. 140 Such drawings shall be checked. The Contractor shall provide notification in writing that it is assuming responsibility for their correctness.
711.06Storage of Materials
Structural material, either plain or fabricated, shall be stored at the bridge shop above the ground upon platforms, skids, or other supports. It shall be kept reasonably free from dirt, grease, and other foreign matter and shall be protected as far as practicable from corrosion.
711.07Mill Orders and Shipping Statements 150
If requested, one copy of mill orders, change orders, and mill shipping statements for structural steel shall be furnished. The pertinent order, bill, or statement shall be furnished far enough in advance so that inspection may be provided.
711.08Mill Test Reports
A copy of all mill test reports for all steel on hand that is to be used to fabricate structural steel members shall be furnished prior to the start of fabrication. For steel not on hand when fabrication is started that arrives during fabrication, a copy of the mill test reports for that steel shall be provided within 24 h of receipt of the steel. If copies of mill test reports are not provided within the specified timeframe, the 160 Engineer may suspend the fabrication of all structural steel members until such time that copies of the missing mill test reports are provided. Delays due to suspension of fabrication will be considered non-excusable.
If the manufacturer’s mill test reports are not available, tests shall be made with no additional payment, and four certified copies of such tests shall be furnished. Four copies of an affidavit shall be furnished which shall state that the materials to be used for members not designated for calculated st ress and not to be marked in accordance with ASTM A6, article 18, are in acco rdance with the requ irements of the specifications for the materials as shown on the plans. The fabricator shall have on file 170 the mill test reports for the material from which these members were obtained. Those items of structural steel which are considered as being in the category of members not requiring mill test reports and for which tests may not be required shall be listed on the working drawings. Approval of working drawings will indicate if it is satisfactory to waive testing of the items listed.
711.08
Mill test reports, reports from subsequent tests, and affidavits shall be marked in a manner to clearly identify them with the c ontract structure and with the particular member of the bridge for which these tests were made.
711.09Notice of Beginning Work
Written notification shall be given 10 days in advance of the date on which fabrication is intended to start. Between the dates of such notification and the start of fabrication, a surface inspection of the pro posed materials will be made. Any such materials cut or work performed prior to this inspection may be rejected.
711.10Facilities for Inspection
Facilities for the inspection of material and workmanship in the mill and shop shall be furnished, and the inspectors sha ll be allowed free access to the necessary parts of the works. 190
711.11Straightening Material
Material, before being laid off or worked, must be straight. If straightening is necessary, it shall be done by methods that do not injure the metal. Sharp kinks and bends will be cause for rejection of the material.
The straightening of plates, angles, other shapes, and built up members, when allowed, shall be done by methods that do not produce fracture or other injury. Distorted members shall be straightened by mechanical means or, if approved, by the carefully planned and supervised application of a limited amount of localized heat. 200 Heat straightening of AS TM A709 grade HPS 100W steel members will not be allowed. The temperatures of the heated area shall not exceed 1,200°F, a dull red, as controlled by temperature indicating crayons, liquids, or bimetal thermometers. Parts to be heat straightened shall be substantially free of stress and from external forces, except stresses resulting from mechanical means used in conjunction with the application of heat. They shall be allowed to cool very slowly. Water quenching will not be allowed. Following the straightening of a bend or buckle, the surface of the metal shall be inspected for evidence of fracture.
Short term application of heat to high performance steel for purposes of heat 210 curving, heat straightening, camber and sweep adjustment, or for other reasons is limited and shall not exceed 1,100°F. Heat a pplications shall be in accordance with Department approved procedures.
711.12Finish
Portions of the work exposed to view shall be finished neatly. Shearing, flame cutting, and chipping shall be done carefully and accurately.
All shop butt welds in flange plates shall be ground smooth and flush with the base metal on all surfaces. This shall apply to parts of both equal and unequal 220 thicknesses. Grinding shall be performed in the direction of stress and in such a manner that the metal is kept below the blue br ittle range. All defects exposed by grinding shall be cleaned, filled with weld metal, and reground to a uniform finish. 711.09
Curved surfaces of shoes shall be machined after weldments have been
completed.
For cambered beams, the camber shall be to a smooth curve. Camber for beams
shall be checked after shop welding is completed and while beams are supported so as
to have no bending moment in the direction of camber. Beams which are not cambered230
shall be straight within a tolerance of 3/8 in. at center. If camber exists, beams shall be
laid out with camber up. Beams shall be checked for camber while beams are
supported so as to have no bending moment in the direction of camber.
711.13Flame Cutting
Structural steel in accordance with these specifications may be flame cut,
provided a smooth surface free from cracks and notches and an accurate profile
obtained and secured using a mechanical guide. Hand cutting shall be done only where
approved.
240
In all flame cutting, the cutting flame shall be so adjusted and manipulated as to
avoid cutting inside the prescribed lines. Flame cut surfaces shall meet the ANSI
surface roughness rating value of 1,000, except that flame cut surfaces of members not
subject to calculated stress shall meet the surface roughness value of 2,000. Flame cut
surfaces of members carrying calculated stress shall have their corners rounded to a
1/16 in. radius by grinding after flame cutting.
Re-entrant cuts shall be filleted to a radius of not less than 3/4 in.
Surface roughness exceeding the above values and occasional gouges not more250
than 3/16 in. deep on otherwise satisfactory flame cut surfaces shall be removed by
machining or grinding. Corrections of the defects must be faired with the surface of
the cut on a bevel of 1:6 or less. Occasional gouges of flame cut edges more than 3/16
in. deep but not more than 7/16 in. deep may be repaired by welding with low hydrogen
electrodes not exceeding 5/32 in. in diameter and with a preheat of 250°F. The
completed weld shall be ground smooth and flush with the adjacent surface.
711.14Edge Planing
Edge planing will not be required on plates having rolled edges.
260
Sheared edges of plates more than 1/2 in. in thickness and carrying calculated
stress shall be planed to a depth of 1/4 in. Re-entrant cuts shall be filleted before
cutting.
Visually observed defects in sheared or flame cut edges of plates 4 in. or less in
thickness, except ASTM A709 grade HPS 100W steel plates, shall be investigated or
repaired in accordance with the following table. Repairs made by welding shall be in
accordance with 711.32.
711.14
692
Description of Discontinuity Repair Required
All discontinuity of 1/8 in. max. depth. None. Depth shall be explored as directed.
Any discontinuity over 1 in. in length
with depth over 1/8 in. but not greater
than 1/4 in.
Remove and weld.
Any discontinuity over 1 in. in length
with depth over 1/4 in. but not greater
than 7/16 in.
Remove completely and weld. Aggregate
length of welding not over 20% of plate
edge length being repaired.
Any discontinuity over 1 in. in length
with depth greater than 7/16 in.
Plate rejected. Defective portion may be
removed and remainder may be used in
7/16 in. depth.
270
711.15Abutting Joints
Abutting joints in compression members, girder flanges of trusses and arches, and
in tension members where so specified on the plans, shall be faced and brought to an
even bearing. Where joints are not faced, the opening shall not exceed 1/4 in.
711.16End Connection Angles
Floor beams, stringers, and girders having end connection angles shall be built to
the exact length shown on the plans measured between the heels of the connection
angles, with an allowable tolerance of +0 to -1/16 in. Where continuity is to be
required, end connections shall be faced. The thickness of the connection angles shall280
be no less than that shown on the working drawings after facing.
711.17Blank
711.18Blank
711.19Bent Plates
Cold bent, load carrying, rolled steel plates shall be in accordance with the
following:
290
be at right angles to the direction of rolling.
Generally accepted minimum radii, measured to the concave face of
the metal, are shown in the following table:
Thickness, t,
in inches
Up to
1/2 in.
Over 1/2 in.
to 1 in.
Over 1 in.
to 1 1/2 in.
Over 1 1/2 in.
to 2 1/2 in.
Over 2 1/2 in.
to 4 in.
All grades of
structural steel
in this
specification
2 t 2 1/2 t 3 t 3 1/2 t 4 t
711.15
693
If a shorter radius is essential, the plates shall be bent hot at a
temperature no greater than 1,200°F. Hot bent plates shall be in300
accordance with requirement (a) of 711.19.
of 1/16 in. throughout that portion of the plate at which the bending
is to occur.
711.20Fit of Stiffeners
Bearing stiffeners of girders and stiffeners intended as supports for concentrated
loads shall have full bearing. This bearing shall consist of either milled, ground, or
weldable steel in compression areas of flanges, welded as shown on the plans, or as310
otherwise specified on the flanges to which they transmit load or from which they
receive load. The opposite end of bearing stiffeners may have a gap between the end
of the stiffener and the flange not exceeding six times the web thickness.
Stiffeners not intended to support concentrated loads, including transverse
intermediate stiffeners and full depth diaphragm connection plates, shall be attached
to the compression flange as shown on the plans. These stiffeners may bear on the
tension flange or may have a gap between the end of the stiffener and the near face of
the flange not exceeding six times the web thickness. Regardless of the gap dimension,
the distance between the end of the stiffener weld and the near edge of the web-to-320
flange fillet weld shall not be less than four and not more than six times the web
thickness.
711.21Bolt Holes
All holes for bolts shall be punched or drilled. Material forming parts of a member
composed of not more than five thicknesses of metal may be punched 1/16 in. larger
than the nominal diameter of the bolts whenever the thickness of the metal is no greater
than 3/4 in. for structural steel or 5/8 in. for high-strength steel. If there are more than330
five thicknesses or when the main material is thicker than 3/4 in. for structural steel,
or 5/8 in. for high strength steel, or if required in accordance with 711.24, all holes
shall be subpunched or subdrilled 3/16 in. smaller and, after assembling, reamed 1/16
in. larger or drilled from the solid to 1/16 in. larger than the nominal diameter of the
bolts.
All holes for ribbed bolts, turned bolts, or other approved bearing type bolts shall
be subpunched or subdrilled 3/16 in. smaller than the nominal diameter of the bolt.
They shall be reamed assembled, reamed to a steel template, or, after assembling,340
drilled from the solid at the option of the fabricator. The finished holes shall always
provide a driving fit as shown on the plans or as specified.
711.21
694
711.22Punched Holes
The diameter of the die shall not exceed the diameter of the punch by more than
1/16 in. If any holes need to be enlarged to admit the bolts, such holes shall be reamed.
Holes shall be clean cut without torn or ragged edges. Poor matching of holes will be
cause for rejection.
711.23Reamed or Drilled Holes350
Reamed or drilled holes shall be cylindrical, perpendicular to the member, and
shall be in accordance with 711.21 as to size. Where practicable, reamers shall be
directed by mechanical means. Drilled holes shall be 1/16 in. larger than the nominal
diameter of the bolt. Diameters of holes in all material connecting top shoes to beam
or girder flanges shall be 1/8 in. larger than the diameters of the bolts. Bolts connecting
the flange to the top shoe shall extend into the top shoe a minimum of 1 in. Open holes
for high strength bolts shall be 15/16 in. in diameter unless otherwise shown on the
plans. Burrs on the outside surfaces shall be removed. Poor matching of holes will be
cause for rejection. Reaming and drilling shall be done with twist drills. If required,
assembled parts shall be taken apart for removal of burrs caused by drilling.360
Connecting parts requiring reamed or drilled holes shall be assembled and held
securely while being reamed or drilled and shall be match marked before
disassembling.
If beams or girders are shop reamed or drilled, progressive beam or girder
assembly will be allowed in accordance with 711.44 unless otherwise directed. Beams
or girders spliced over the supports may be shop reamed or drilled with the webs either
in a horizontal or vertical position. If the webs are vertical, they shall be supported
relative to their final erection position. If reamed with the webs horizontal, a minimum
of one line of beams or girders shall be shop assembled and inspected for fit in370
accordance with the blocking diagram for webs vertical shown on the plans. Beams or
girders spliced at the points of contraflexure shall be shop reamed or drilled while
assembled in accordance with the no-load camber and reaming diagram shown on the
plans. For hinged beams or girders, holes for pins shall be bored or reamed to the
dimensions shown on the plans after the beams or girders are assembled in position in
accordance with the no-load camber diagram shown on the plans. Flange splice bars
shall be subdrilled and reamed or drilled full size while assembled.
When girder sections are fit up in the shop for reaming or drilling of field splices,
the centerlines of opposing flanges shall not deviate more than 1/8 in. with the webs380
in alignment.
711.24Subpunching and Reaming of Field Connections
Holes in all field connections and field splices of main members of trusses, arches,
continuous beam spans, bents, each face of towers, plate girders, and rigid frames shall
be subpunched, or subdrilled if subdrilling is required in accordance with 711.21.
These subsize holes shall subsequently be reamed while assembled, or reamed to a
template, in accordance with 711.44. All holes for floor beams and stringer field end
connections shall be subpunched and reamed to a steel template or reamed while
711.22
695
assembled. Reaming or drilling full size of field connection holes through a steel390
template shall be done after the template has been located as to position and angle, and
bolted firmly in place.
Templates used for reaming matching members, or the opposite faces of a single
member, shall be exact duplicates. Templates used for connections on like parts or
members shall be so accurately located that the parts or members are duplicates and
require no match marking.
711.25Accuracy of Punched or Subdrilled Holes
Before any reaming is done, the punching, subpunching, or subdrilling shall be so400
accurate that after assembling, a cylindrical pin 1/8 in. smaller in diameter than the
nominal size of the punched hole may be entered perpendicular to the face of the
member, without drifting, in at least 75% of the contiguous holes in the same plane. If
the requirement is not fulfilled, the badly punched pieces will be rejected. If a hole
does not pass a pin which is 3/16 in. smaller in diameter than the nominal size of the
punched hole, this will be cause for rejection.
711.26Accuracy of Reamed Holes and Holes Drilled Full Size
When holes are reamed or drilled full size, 85% of the holes in any contiguous
group shall, after reaming or drilling, show no offset greater than 1/32 in. between410
adjacent thicknesses of metal. All steel templates shall have hardened steel bushings
in holes accurately dimensioned from the centerlines of the connection as inscribed on
the template. The centerlines shall be used in locating accurately the template from the
milled or scribed ends of the members.
711.27Fitting for Bolting
Mating surfaces of steel shall be cleaned before assembling. The parts of a
member shall be assembled, well pinned, and firmly drawn together with bolts before
reaming is commenced. Assembled pieces shall be taken apart, if necessary, for the
removal of burrs and shavings produced by the reaming operation. The member shall420
be free from twists, bends, and other deformation.
711.28Filler Plates
Filler may be required at the connections due to the variation in depth of a given
section or to the use of different sections at a connection point. Where filler plates are
shown on the plans at such connections, the specified thickness is the theoretical
thickness required. During fabrication the thickness of such fillers shall be adjusted to
the actual clearances as determined by measurements of the members involved. The
minimum thickness of any filler plate shall be 1/8 in., unless otherwise approved.
430
711.29Toothed Expansion Plates
These plates in the roadway expansion joints shall be cut from a single plate by
burning in such a way that, after the plate is cut and the toothed plates placed in the
same relative position as before burning, no part of the cut shall be wider than 1/4 in.
711.29
696
The cuts shall be straight enough that a 1/8 in. plate passes between the parts on any
designated straightline cut.
711.30Blank
711.31Peening Welds by Means of Ultrasonic Impact Treatment, UIT440
This work shall consist of removing existing paint, repairing existing cracked
welds, peening existing and repaired welds, and painting in accordance with 105.03.
Personnel performing NDT shall meet the qualifications specified in 729.04(b).
Proof of certification shall be submitted to the Engineer at least two weeks prior to
commencing work.
UIT shall be performed in accordance with the QCP, which shall be prepared and
submitted in accordance with ITM 803. The QCP shall include the Contractor’s
experience performing UIT within the last five years, and certification by the450
manufacturer of the UIT equipment that the personnel performing the work have
received sufficient training on the operation of the equipment within the past 18
months. The QCP shall be submitted to the Engineer at least two weeks prior to
commencing work.
All welding shall be in accordance with the applicable section of the Bridge
Welding Code. All welding shall be performed by AWS certified welders. Weld repair
shall be in accordance with Bridge Welding Code, Section 5.7.
Paint removal shall be in accordance with 619.08(a) and 619.08(i). Painting shall460
be in accordance with 619.09 and 619.10.
Prior to beginning the peening process, all welds shall be inspected in accordance
with 729.04(a). The results of the inspection shall be submitted in accordance with
729.04(c). Welds needing repair shall be ground and repaired in accordance with the
Bridge Welding Code. Peening using ultrasonic impact treatment methods shall be
applied to all repaired welds in addition to the welds shown on the plans.
UIT shall be performed along the toe of the weld to cause the center of the
treatment groove to be at the weld toe. UIT shall be performed to result in a uniform470
groove with a bright, metallic surface. All non-uniform areas shall be retreated.
711.32Welds
Welding of steel shall be done only as shown on the plans or as specified and only
with specific approval. Welding may be performed to remedy minor defects, if
approved. No temporary or permanent welds, if not shown on the plans or otherwise
specified, shall be made without specific written authorization.
Welding of steel bridges and bridge components shall be performed in accordance480
with AASHTO/AWS D1.5 Bridge Welding Code, hereinafter referred to as the Bridge
711.30
697
Welding Code. Welders, welding operators, and tack welders shall be qualified in
accordance with Bridge Welding Code, Clause 7, Part B.
When welding steel structural or steel non-structural tubing or steel structural
supports for highway signs, luminaires, or traffic signals, it shall be performed in
accordance with AWS D1.1 Structural Welding Code – Steel, hereinafter referred to
as AWS D1.1. Welders, welding operators, and tack welders shall be qualified in
accordance with AWS D1.1, Clause 6, Part C.
490
All welding on high performance steel shall be in accordance with the Bridge
Welding Code, except as modified herein and by the AASHTO Guide Specification
for Highway Bridge Fabrication with HPS 70W Steel, hereinafter referred to as the
Guide.
Only submerged arc welding, SAW, and shielded metal arc welding, SMAW,
processes will be allowed. Consumable handling requirements shall be in accordance
with the Bridge Welding Code, Sections 12.4 and 12.5, when using reduced preheat
as described in Table 3 of the Guide, except that SAW consumables for matching weld500
metal shall meet the hydrogen control level of H4 in accordance with Section 12.6.
Consumable handling requirements shall meet the provisions of the Bridge Welding
Code, Clause 6, when using the preheat requirements contained in Clause 6, except
that the diffusible hydrogen level shall never exceed H8. SMAW consumables may
meet diffusible hydrogen levels of either H4 or H8 except the higher preheat and
interpass temperatures as noted in Table 3 of the Guide shall apply to H8 conditions.
Filler metals used to make single pass fillet welds for web to flange applications
which join HPS 70W steel plates, HPS 70W to grade 50W plates, and for attaching
stiffeners and connection plates to grade HPS 70W webs and flanges, shall be in510
accordance with the Bridge Welding Code, Table 6.1 for ASTM A709, grade 50W
base metal. Filler metals for single pass 5/16 in. fillet welds need not meet the
requirements for exposed bare applications.
Filler metals used for all complete penetration groove welds joining grade HPS
70W plate to ASTM A709, grade HPS 50W or grade 50W plate shall conform to the
requirements for welding grade 50W base metal.
Filler metals used for all complete penetration groove welds joining grade HPS
70W plates to grade HPS 70W plates shall conform to the requirements for HPS 70W520
base metal as follows:
Wire - LA85 by Lincoln Electric Company
Flux - MIL800HPNi by Lincoln Electric Company
711.32
698
Matching - E9018MR*530
Undermatching - E7018MR*
* The designator 'MR', for moisture resistant coating, is required for all
SMAW electrodes used for welding HPS 70W steels.
The Contractor may request approval of alternate consumables for matching weld
strengths in lieu of the above filler metals for SAW. The request for approval shall
include documentation of successful welding and shall also include diffusible
hydrogen tests, both in accordance with the Bridge Welding Code.
540
All welding procedures shall be qualified in accordance with the Bridge Welding
Code, Clause 7, Qualification. The provisions of Section 7.12 shall apply.
Qualification tests shall measure strength, toughness, and ductility and results shall be
evaluated in accordance with Section 7.12. If specified on the plans, additional tests
shall measure the Charpy V-notch toughness of the coarse-grained area of the heat
affected zone, HAZ. The notch in the specimens shall be carefully located in the
coarse-grained area of the HAZ, as determined by macro-etching the specimens prior
to machining and testing. The toughness requirement for the HAZ shall be the same
as the weld metal.
550
All procedure qualification tests shall be ultrasonically tested in accordance with
the requirements of the Bridge Welding Code, Clause 8, Part C. Evaluation shall be in
accordance with Table 8.4, UT Acceptance – Rejection Criteria – Tensile Stress.
Indications found at the interface of the backing bar may be disregarded regardless of
the defect rating.
A representative of the Department will witness all welding procedure
qualification tests.
Results of the welding procedure qualification tests and final welding procedure560
specifications shall be submitted to the Engineer for review and approval.
In general, post weld heat treatment will not be required. The use of such post
weld heat treatment will require additional qualification testing.
Wherever magnetic particle testing is done, only the yoke technique will be
allowed, as described in Section 8.7.8.2 of the Bridge Welding Code, modified to use
alternating current only.
Field welding shall be by the shielded metal arc welding, SMAW, process and
shall be in accordance with the requirements herein. Magnetic particle testing will not
be required on welded connections that do not carry calculated stresses. All field
welding shall be preheated in accordance with Clause 6 of the Bridge Welding Code.
711.32
699
The Contractor shall provide a copy of the minimum preheat and interpass temperature
table to the Engineer prior to beginning welding. Electrodes with a low hydrogen
classification shall be used.
711.33Stud Shear Connectors
Stud shear connectors shall be in accordance with 711.32 and as shown on the580
plans.
711.34Annealing and Stress Relieving
Structural members which are indicated in the contract to be annealed or
normalized shall have finished machining, boring, and straightening performed
subsequent to heat treatment. Normalizing and full annealing shall be in accordance
with ASTM A941. The temperatures shall be maintained uniformly throughout the
furnace during the heating and cooling so that the temperatures at two points on the
member differ by no more than 100°F at any one time.
590
A record of each furnace charge shall identify the pieces in the charge and show
the temperatures and schedule actually used. Proper instruments, including recording
pyrometers, shall be provided for determining the temperature of members in the
furnace. The records of the treatment operation shall be available and meet approval.
Members, such as bridge shoes, pedestals, or other parts which are built up by welding
sections of plate together shall be stress relieved in accordance with the procedure of
the AWS when required by the plans or as otherwise specified.
711.35Eyebars
Pin holes may be flame cut at least 2 in. smaller in diameter than the finished pin600
diameter. All eyebars to be placed side by side in the structure shall be securely
fastened together in the order that they are placed on the pin and bored at both ends
while clamped. Eyebars shall be packed and match marked for shipment and erection.
All identifying marks shall be stamped with steel stencils on the edge of one head of
each member after fabrication is completed to be visible when the bars are nested in
place on the structure. The eyebars shall be straight and free from twists, and the pin
holes shall be located accurately on the centerline of the bar. The inclination of any
bar to the plane of the truss shall not exceed 1/16 in. in 1 ft.
The edges of eyebars that lie between the transverse centerline of their pin holes610
shall be cut simultaneously with two mechanically operated torches abreast of each
other, guided by a substantial template to prevent distortion of the plates.
711.36Facing of Bearing Surfaces
The top and bottom surfaces of steel slabs, base plates, and cap plates of columns
and pedestals shall be planed or the plates heat-straightened. Parts in contact with them
shall be faced.
Sole plates of beams and girders shall have full contact with flanges. Sole plates
and masonry plates shall be planed or heat straightened.620
711.36
700
Cast pedestals shall be planed on surfaces to be in contact with steel and shall
have surfaces to be in contact with masonry, rough finished.
Surfaces of bronze bearing plates intended for sliding contact shall be finished.
The surface finish of bearing plates, base plates, and other bearing surfaces
intended to contact each other or with concrete shall meet the following ANSI surface
roughness requirements as defined in ANSI B 46.1:
630
Bridge rollers and rockers ........................................... ANSI 250
Heavy plates in contact with shoes to be welded......... ANSI 1000
Milled ends of compression members, milled or
ground ends of stiffeners and fillers ..................... ANSI 500
Pins and pin holes ........................................................ ANSI 125
Sliding bearings ........................................................... ANSI 125
Steel slabs .................................................................... ANSI 2000
711.37Pins and Rollers
Pins and rollers shall be turned to the dimensions shown on the working drawings640
and shall be straight, smooth, and free from flaws. Pins and rollers more than 9 in. in
diameter shall be forged. Pins and rollers 9 in. or less in diameter may be forged or
cold finished carbon steel shafting. In pins larger than 9 in. in diameter, a hole no less
than 2 in. in diameter shall be bored full length along the axis after the forging has
been allowed to cool to a temperature below the critical range under suitable
conditions to prevent damage by cooling too rapid.
711.38Boring Pin Holes
Pin holes shall be bored true to the specified diameter, smooth and straight, at
right angles with the axis of the member, and parallel with each other unless otherwise650
required. The final surface shall be produced by a finishing cut. The distance outside
to outside of end holes in tension members, and inside to inside of end holes in
compression members, shall not vary from that specified more than 1/32 in. Boring of
holes in built-up members shall be done after the bolting is completed.
711.39Pin Clearances
The diameter of the pin hole shall not exceed the pin by more than 1/50 in. for
pins 5 in. or less in diameter, or 1/32 in. for larger pins.
711.40Threads for Bolts and Pins660
Threads for all bolts and pins for structural steel construction shall be in
accordance with the United Standard Series UNC-ANSI B 1.1, Class 2A for external
threads and Class 2B for internal threads, except that pin ends having a diameter of 1
3/8 in. or more shall be threaded six threads per 1 in.
711.37
701
711.41Pilot and Driving Nuts
Two pilot nuts and two driving nuts for each size of pin shall be furnished, unless
otherwise specified.
711.42Finishing Cast Steel670
The surface shall be finished as shown on the detail plans. Surfaces marked
“finish” shall be made to the exact size and shape, all tool marks shall be removed. If
marked “rough finish”, the tool marks need not be removed. There shall be no
irregularities greater than 1/32 in. in height on rough finished surfaces.
711.43Finished Members
The several pieces forming a built-up member shall fit together closely and
accurately, and the finished member shall be true to line and free from twists, bends,
and open joints.
680
Cover plates on trusses, beams, and girders shall be so nearly straight that
variations do not exceed 1/16 in. in 5 ft, with a maximum variation not to exceed 3/16
in. at the center of the plates.
711.44Shop Assembling
The field connections of main members of trusses, arches, continuous beam spans,
bents, tower faces, plate girders, and rigid frames shall be assembled in the shop with
milled ends of compression members in full bearing and then shall have their sub-size
holes reamed to specified size while the connections are assembled. Assembly shall
be full truss or girder assembly unless progressive beam or girder assembly, full chord690
assembly, progressive chord assembly, or special complete structure assembly is
shown on the plans or otherwise specified. Each assembly including camber,
alignment, accuracy of holes, and fit of milled joints will be approved before reaming
is commenced.
A camber diagram shall be furnished by the fabricator showing the camber at each
panel point of each truss, arch rib, continuous beam line, plate girder, or rigid frame.
When the shop assembly is full truss or girder assembly or special complete structure
assembly, the camber diagram shall show the camber measured in assembly. When
any of the other methods of shop assembly are used, the camber diagram shall show700
calculated camber.
Full truss or girder assembly shall consist of assembling all members of each truss,
arch rib, bent, tower face, continuous beam line, plate girder, or rigid frame at one
time.
Progressive beam or girder assembly shall be accomplished by one of the
following methods. In case the structure is on a horizontal curve, other assembly710
methods may be approved on the working drawings.
711.44
702
contiguous members, and no less than 150 ft. At least one beam
or girder shall be added at the advancing end of the assembly
before any member is removed from the rearward end so that
the assembly portion of the structure is never shorter than that
specified above. Each successive laydown assembly shall
always include a previously reamed splice and the main
member on each side of this splice.720
number of contiguous shop members so that two complete
spans are assembled for the first laydown. Each successive
laydown shall consist of the required number of contiguous
members to complete the next two spans while retaining in the
new laydown the last bearing member from the previous
laydown. On laydowns for structures comprised of an odd
number of spans, a laydown of one span will be allowed to
complete the structure. This laydown shall be the last span730
unless otherwise approved on the working drawings. Each
retained bearing member shall be reassembled in its second
laydown with the same relative orientation to a common base
line as it was in the first laydown.
Full chord assembly shall consist of assembling, with geometric angles at the
joints, the full length of each chord of each truss or open spandrel arch, or each leg of
each bent or tower, then reaming their field connection holes while the members are
assembled and reaming the web member connections to steel templates set at740
geometric, not cambered, angular relation to the chord lines.
Field connection holes in web members shall be reamed to steel templates. At
least one end of each web member shall be milled or shall be scribed normal to the
longitudinal axis of the member. The templates at both ends of the member shall be
located accurately from one of the milled ends or scribed lines.
Progressive chord assembly shall consist of assembling contiguous chord
members in the manner specified for full chord assembly and in the number and length750
specified for progressive truss or girder assembly.
Special complete structure assembly shall consist of assembling the entire
structure, including the floor system. This procedure is ordinarily needed only for
complicated structures such as those having curved girders or extreme skew in
combination with severe grade or camber.
711.44
703
711.45Drifting of Holes
Except where drifting is specifically prohibited by this specification, the drifting760
done during assembly shall be only to bring the parts into position and not sufficient
to enlarge the holes or distort the metal. If a hole needs to be enlarged to admit the
bolt, it shall be reamed.
711.46Match Marking
Connecting parts assembled in the shop for the purpose of reaming holes in field
connections shall be match marked and a diagram showing such marks shall be
furnished.
711.47Shop Cleaning and Painting770
Shop cleaning and painting shall be in accordance with applicable requirements
of 619.
711.48Shop Cleaning and Storage of Weathering Steel
The fabricator shall protect bare steel sections and sub-assemblies so as not to
damage or stain them. The use of paints, crayons, or other materials used for
identification purposes shall be avoided on bare steel sections. Storage shall be such
to enable free drainage to avoid moisture pockets.
A sound uniform surface for the formation of a protective oxide coating on all780
surfaces shall be prepared as follows.
The entire length and perimeter of each fascia beam or girder shall be cleaned in
accordance with 619.08(e). The entire length and perimeter of each interior beam or
girder shall be cleaned in accordance with 619.08(d). Unless otherwise specified, all
components such as, but not limited to, diaphragms, cross frames, stiffeners, bearing
assemblies, and sway bracing that are permanently incorporated into the structure shall
be cleaned in accordance with 619.08(d). Contamination from grease, oil, or shop
marking shall be avoided. If such contamination is unavoidable, such surfaces shall be790
cleaned in accordance with 619.08(a).
All exposed welds on fascia surfaces shall be prepared by means of power
grinding in accordance with 619.08(i) or blast cleaning in accordance with 619.08(e)
to remove welding flux, slag, scale, or spatter.
711.49Furnishing Bolts
Sufficient field bolts shall be furnished to complete the entire structure.
800
711.50Weighing of Members
If it is specified that part of the material is to be paid for by actual weight, finished
work shall be weighed in the presence of the inspector, if practicable. Satisfactory
scales shall be supplied and all work involved in handling and weighing the various
parts shall be performed.
711.50
704
711.51Full Size Tests
When full size tests of fabricated structural members or eyebars are required by
the contract, the plans or specifications shall state the number and nature of the tests,
the results to be attained, and the measurements of strength, deformation, or other810
performance that are to be made. Suitable facilities, material, supervision, and labor
necessary for making and recording the tests shall be provided. The cost of testing,
including equipment, handling, supervision, labor, and incidentals for making the tests
shall be included in the contract price for structural steel, unless otherwise specified.
711.52Acceptance
Acceptance of any material or finished member shall not preclude its rejection if
found to be defective, either during fabrication or erection. Rejected material shall be
replaced and poor workmanship corrected promptly.
820
711.53Shipping
Structural members shall be loaded on trucks or cars in such manner that they can
be transported to and unloaded at their destination without being excessively stressed,
deformed, or otherwise damaged.
If required, pins, nuts, bolts, and other small details shall be boxed or crated and
the weight of each piece or box marked on it in plain figures.
Written permission shall be obtained prior to shipping plate girders with the webs
horizontal.830
Splice plates shall not extend beyond the ends of beams or girders after bolting
for shipment.
Member lengths shall be subject to the provisions of the current edition of the
Oversize-Overweight Vehicular Permit Handbook.
The Contractor shall be responsible for obtaining all required transportation
permits.
840
ERECTION
711.54General Requirements
The erection methods shall be those prescribed for the several parts which
constitute the finished structure and shall be in accordance with the requirements set
forth herein. Workmanship and finish shall be first-class and all work done in a
substantial and workmanlike manner in accordance with these specifications and in
reasonable close conformance with the lines, grades, dimensions, and details shown
on the plans, or as directed.
850
No erection shall be performed without the approval by the Engineer. Before
711.51
705
starting erection, information shall be fully provided concerning the erection methods
and the amount and character of the equipment proposed to be used, which shall be
subject to approval. Approval shall not be considered as relieving the Contractor of its
responsibility for the safety of its methods or equipment or from carrying out the work
in full accordance with the plans and specifications.
711.55Delivery of Materials
If the contract is for erection only, the materials used in the finished structure will
be provided at the place designated and loaded or unloaded as specified. Material860
required to be unloaded, shall be unloaded promptly on delivery to the place
designated. The Contractor shall be responsible for demurrage charges.
711.56Handling and Storing
Material to be stored shall be placed on skids above the ground. It shall be kept
clean and properly drained. Girders and beams shall be placed upright and shored.
Long members, such as columns and chords, shall be supported on skids placed near
enough together to prevent injury from deflection. If the contract is for erection only,
the material shall be checked against the shipping lists and all shortages or injuries
discovered shall promptly be reported in writing. The Contractor shall be responsible870
for the loss or damage of material after receipt.
711.57Falsework
The falsework shall be properly designed and substantially constructed and
maintained for the loads which come upon it. Plans for falsework or for changes in an
existing structure necessary for maintaining traffic shall be prepared and submitted for
approval. Approval of these plans shall not be considered as relieving the Contractor
of any responsibility.
711.58Bearings and Anchorages880
Masonry bearing plates shall not be placed upon bridge seat bearing areas which
are improperly finished, deformed, or irregular. Bearing plates shall be set level in
exact position and shall have a full and even bearing on the masonry.
The holes shall be drilled and the anchor bolts, except where the bolts or anchor
plates are built into the masonry, shall be set. The bolts shall be set accurately and
fixed with portland cement grout completely filling the holes. The location of the
anchor bolts in relation to the slotted holes in the expansion shoes shall correspond
with the temperature at the time of the erection. The nuts on anchor bolts at the
expansion ends of spans shall be adjusted to enable the free movement of the span.890
711.59Field Straightening Material
If it is necessary to straighten beams, plate girders, plates, angles, and other shapes
in the field, it shall be done in accordance with the applicable requirements of 711.11.
Before straightening a carrying member, a proposed method of straightening shall
be submitted in writing. Approval shall be received prior to commencing the work.
711.59
706
711.60Field Assembly of Steel
Parts assembled in the field shall be assembled accurately as shown on the plans.900
Matchmarks shall be followed. The materials shall be handled carefully so that no part
is bent, broken, or otherwise damaged. Hammering which would damage or distort the
members shall not be performed. Bearing surfaces and surfaces to be in permanent
contact shall be cleaned thoroughly before assembling.
Unless erected by the cantilever method, truss spans shall be erected on blocking
so placed to give the trusses the required camber. Truss spans shall be completely
bolted on the blocking except for stringers and bottom lateral connections which shall
be bolted after the span is swung. In emergencies or special cases and with specific
approval, truss spans may be swung with main joints fully filled with bolts and drift910
pins.
Structural steel shall be erected using sufficient full size drift pins to enable
placement of bolts without damage thereto and to facilitate setting splices to grade.
At the time of erection, no less than 50% of the holes in all connections shall be
filled with bolts. The bolts shall not be tightened more than snug tight at this stage.
Any drifting required shall only be for drawing the parts into position but not
sufficient to enlarge the holes or distort the metal. Unfair holes shall be reamed or920
drilled.
All field splices are optional, except as shown on the plans. Splice elevations have
been calculated to include structural steel dead load only, with falsework removed.
The tops of beam or girder splice plates shall be adjusted to the splice elevations shown
on the plans before bolting field splices.
Splices shall be set to grade with the steel unsupported by falsework and prior to
final bolting. After bolting is complete, these elevations will be checked. Adjustment
shall be made as directed if steel elevations are not within allowable tolerances.930
711.61Misfits
The correction of minor misfits involving harmless amounts of reaming, cutting,
and chipping will be considered a legitimate part of the erection. However, any error
in the shop fabrication or deformation resulting from handling and transportation
which prevents the proper assembling and fitting up of parts by the moderate use of
drift pins or by a moderate amount of reaming and slight chipping or cutting shall be
reported immediately and approval of the method of correction shall be obtained.
The correction shall be made in the presence of the inspector. If the contract940
provides for complete fabrication and erection, the Contractor shall be responsible for
all misfits, errors, and injuries and shall make the necessary corrections and
replacements. If the contract is for erection only, the inspector, with the cooperation
711.60
707
of the Contractor, shall keep a correct record of labor and materials used. Within 30
days, an itemized bill shall be presented for approval.
711.62Pin Connections
Pilot and driving nuts shall be used in driving pins. They shall be furnished
without charge. Pins shall be driven so that the members take full bearing on them. Pin
nuts shall be screwed up tight and the threads burred at the face of the nut with a950
pointed tool.
711.63Blank
711.64Diaphragm Connections
Diaphragm connections other than those shown on the plans may be allowed. If
other connections are proposed, details shall be submitted for approval. The Contractor
shall assume full responsibility for layout of all diaphragm connections and for the
accuracy of all fitted parts. Connections will not be allowed which require welding to
the web, except at supports.960
711.65Bolted Connections Using High Strength Bolts
This subsection covers the assembly of structural joints using ASTM F3125,
grade A325 high strength heavy hex bolts tightened to a high tension. The bolts are to
be used in holes provided in accordance with 711.21, 711.22, and 711.23.
High strength bolts shall be 7/8 in. in diameter unless noted.
970
Bolts, nuts, and washers shall be in accordance with 910.02(g). All galvanized
nuts shall be lubricated with lubricant containing a visible dye. Black bolts shall be
oily to the touch when installed. Weathered or rusted bolts shall be cleaned and
lubricated prior to installation.
The slope of surfaces of bolted parts in contact with the bolt head and nut shall
not exceed 1:20 with respect to a plane normal to the bolt axis. Bolted parts shall fit
together solidly when assembled and shall not be separated by gaskets or any other980
interposed compressible material. When assembled, all joint surfaces, including those
adjacent to the bolt heads, nuts, or washers, shall be free of scale, except tight mill
scale surfaces shall also be free of dirt, loose scale, burrs, other foreign material, and
other defects that would prevent solid seating of the parts.
Contact surfaces within slip-critical joints shall be free of oil, grease, and any
other material that reduces friction between the contact surfaces.
711.65
708
990
When all fasteners in the joint are tightened, each shall provide at least the
minimum bolt tension shown in Table A for the size and grade of fastener used.
TABLE A
Bolt Tension for ASTM F3125, Grade A325 Bolts
Bolt Size, in. Minimum Bolt Tension,* lb
1/2 12,050
5/8 19,200
3/4 28,400
7/8 39,250
1 51,500
1 1/8 64,900
1 1/4 82,400
1 3/8 98,200
1 1/2 119,500
* Equal to the proof load given in ASTM F3125
Threaded bolts shall be tightened with properly calibrated wrenches or by the
turn-of-nut method. If required because of bolt entering and wrench operation
clearances, tightening by either procedure may be done by turning the bolt while the
nut is prevented from rotating. Impact wrenches, if used, shall be of adequate capacity1000
and sufficiently supplied with air to perform the required tightening of each bolt in
approximately 10 s.
Installation of all high strength bolts shall be in accordance with AASHTO LRFD
Bridge Construction Specifications. The snug tight condition as defined in AASHTO
LRFD Bridge Construction Specifications shall be obtained for all final tightening.
A Skidmore-Wilhelm calibrator or other acceptable bolt tension indicating
devices shall be required on the project site for use during bolt installation. Periodic
tests shall be performed to ensure the installed bolt, nut, and washer assembly meets1010
the above requirements. Such tests shall be performed each work day when calibrated
wrench tightening is used. For short grip bolts, direct tension indicators with solid
plates may be used to perform these tests. Direct tension indicators shall first be
checked with a longer grip bolt in the Skidmore-Wilhelm calibrator.
All fasteners shall have a hardened washer under the nut or bolt head turned in
tightening. Where an outer face of the bolted parts has a slope of more than 1:20 with
respect to a plane normal to the bolt axis, a smooth beveled washer shall be used to
compensate for the lack of parallelism.1020
711.65
709
If calibrated wrenches are used to provide the bolt tension specified in 711.65(d)1,
the settings shall induce a bolt tension of 5% to 10% in excess of this value. These
wrenches shall be calibrated at least once each working day by tightening, in a device
capable of indicating actual bolt tension, no less than three typical bolts of each
diameter from the bolts to be installed. Power wrenches shall be adjusted to stall or
cut-out at the selected tension. If manual torque wrenches are used, the torque
indication corresponding to the calibrating tension shall be noted and used in the
installation of all bolts of the tested lot. Nuts shall be in tightening motion when torque1030
is measured. When using calibrated wrenches to install several bolts in a single joint,
the wrench shall be turned to touch up bolts previously tightened which may have been
loosened by the tightening of subsequent bolts. This shall be continued until all are
tightened to the required amount.
When the turn-of-nut method is used to provide the bolt tension specified in
(d)1, there shall first be enough bolts brought to a snug tight condition to ensure
that the parts of the joint are brought into full contact with each other. Snug tight is
defined as the tightness attained by a few impacts of an impact wrench or the full effort1040
of a man using an ordinary spud wrench. Following this initial operation, bolts shall
be placed in all remaining holes in the connection and brought to snug tightness. All
bolts in the joint shall then be tightened additionally by the applicable amount of nut
rotation specified in Table B with tightening progressing systematically from the most
rigid part of the joint to its free edges. During this operation there shall be no rotation
of the part not turned by the wrench.
TABLE B
Nut Rotation
from Snug Tight Condition
Disposition of Outer Faces of Bolted Parts
Both faces normal to bolt axis, or 1 face normal to axis
and other face sloped (3) (bevel washer not used)
Both faces sloped (3)
from normal to bolt axis
(bevel washers not used)
Bolt length (4) not exceeding
8 diameters or 8 in.
Bolt length (4) exceeding
8 diameters or 8 in. For all lengths of bolts
1/2 turn 2/3 turn 3/4 turn
(1) For coarse thread heavy hexagon structural bolts of all sizes and lengths and heavy hexagon
semi-finished nuts.
(2) Nut rotation is rotation relative to bolt regardless of the element (nut or bolt) being turned.
Tolerance on rotation: 1/6 of a turn over and nothing under.
(3) Slope 1:20 maximum.
(4) Bolt length is measured from underside of head to extreme, end of point.
met in the work. When the calibrated wrench method of
711.65
710
tightening is used, the Engineer shall be given full opportunity
to witness the calibration tests prescribed in 711.65(d)3.
determine that the selected tightening procedure is properly
used and that all bolts are tightened.
1060
or different inspection procedure is specified.
or a power wrench that can be adjusted accurately in
accordance with 711.65(d)3 shall be used.
under inspection shall be placed individually in a calibration
device capable of indicating bolt tension. Length may be1070
any length representative of bolts used in the structure.
There shall be a washer under the part turned in tightening
each bolt.
specified in requirement 3b of 711.65(e) shall be tightened
in the calibration device by any convenient means to the
minimum tension specified for its size in 711.65(d)1. The
inspecting wrench shall then be applied to the tightened
bolt. The torque necessary to turn the nut or head 5°, or1080
approximately 1 in. at a 12 in. radius, in the tightening
direction shall be determined. The average torque measured
in the tests of three bolts shall be taken as the job inspecting
torque to be used in the manner specified in requirement 3e
of 711.65(e).
adjusted so that it shall tighten each bolt specified in
requirement 3b of 711.65(e) to a tension at least 5% but no
more than 10% greater than the minimum tension specified1090
for its size in 711.65(d)1. This wrench setting shall be taken
as the job inspecting torque to be used in the manner
specified in requirement 3e of 711.65(e).
3b of 711.65(e) which have been tightened in the structure
shall be inspected by applying, in the tightening direction,
the inspection wrench and its job inspecting torque to 10%
of the bolts, but no less than two bolts, selected at random
711.65
711
in each connection. If no nut or bolt head is turned by this1100
application of the job inspecting torque, the connection shall
be accepted as properly tightened. If a nut or bolt head is
turned by the application of the job inspecting torque, this
torque shall be applied to all bolts in the connection. All
bolts whose nut or head is turned by the job inspection
torque shall be tightened and reinspected, or alternatively,
the fabricator or erector may opt to retighten all bolts in the
connection and then resubmit the connection for the
specified inspection.
1110
711.66Bolted Connections Using Other Than High Strength Bolts
Bolts for these connections shall be in accordance with 910.02(h).
711.67Final Clean-Up
Final clean-up shall be conducted in accordance with 104.07.
711.68Structural Steel Cutting, Rivet and Bolt Removal, and Drilled Bolt
Holes in Repair Projects
Field cutting of structural steel shall be done as shown on the plans or as directed.
1120
Rivets or bolts connecting steel at locations shown on the plans or as directed shall
be removed. This work shall be done in a manner that does not damage the surrounding
steel. If necessary, such work shall be done by drilling.
Bolt holes shall be drilled as directed in the field. A bolt hole is a hole required
for one bolt drilled through any number and thicknesses of metal plates.
711.69Jacking and Supporting Beams
When jacking and supporting a beam is required on a bridge repair project, the
proposed method for jacking and supporting shall be submitted for approval. This1130
work shall not be performed until a method is approved.
711.70Field Cleaning and Storage of Weathering Steel
Cleaning of structural steel specified to be left unpainted shall be in accordance
with 619.08(a), or 619.08(c), or as determined by the Engineer, depending on the
severity of the soilage. Foreign matter which adheres to the steel after it has been
blasted and which inhibits formation of the oxide film shall be removed as soon as
practical. The use of acids to remove scale and stains will not be allowed.
Storage shall be such to enable free drainage to avoid moisture pockets.1140
711.71Painting
After erection is complete, the structure shall be painted unless otherwise
provided. Painting shall be in accordance with the applicable requirements of 619.
711.71
712
711.72Method of Measurement
Structural steel shapes, fabricated steel, steel castings, iron castings, bolts, pins,
rollers, rockers, anchor bolts, and threaded rods will be measured by the pound. If the
Schedule of Pay Items includes a lump sum item for structural steel, all materials listed
above shall be included in the pay item. No measurement will be made.1150
Stud shear connectors placed on new structural steel will not be measured. Stud
shear connectors placed on existing structural steel will be measured by the number
installed.
Bronze plates will be measured by the pound. Pay weight will be based on a
theoretical density of 536 lb/cu ft. Volume will be computed based on finished
dimensions. No deductions will be made for drilled holes.
Field cutting of structural steel will be measured by the square inch as determined1160
by the multiplication of the length times the depth of the cut. Removal of rivets and
removal of bolts will be measured by the number of each removed. Drilled holes for
bolts on repair work will be measured by the number of drilled holes.
Jacking and supporting structural members will not be measured for payment.
Peening will be measured by the linear inch of peened weld. The length of weld
peened will be measured once per weld regardless of the number of passes necessary
to complete the work as specified.
1170
Repair welds will be measured by the linear inch of repaired weld.
711.73Basis of Payment
The accepted quantities of structural steel shapes, fabricated steel, steel castings,
iron castings, bolts, pins, rollers, rockers, anchor bolts, and threaded rods will be paid
for at a contract lump sum price if the Schedule of Pay Items includes a lump sum pay
item for structural steel. Changes from the estimated quantities shall be in accordance
with 711.73(a).
If the Schedule of Pay Items does not include a lump sum pay item for structural1180
steel, the accepted quantities of structural steel will be paid for at the contract unit
price per pound for structural steel. Such pay item will include all work listed above,
complete in place. Payment will be in accordance with 711.73(b).
Stud shear connectors placed on existing structural steel will be paid for at the
contract unit price per each, complete in place and accepted.
The accepted quantities of bronze plates will be paid for at the contract unit price
per pound. The accepted quantities of field structural steel cutting will be paid for at
the contract unit price per square inch for structural steel, field cut. The accepted1190
quantities of rivet removal, bolt removal, and drilled holes will be paid for at the
711.72
713
contract unit price per each for rivet, remove; per each for bolt, remove; and per each
for drilled hole.
Jacking and supporting structural members, if specified as a pay item, will be paid
for at the contract lump sum price for jacking and supporting the types of structural
members shown in the Schedule of Pay Items.
The accepted quantities of peened weld will be paid for at the contract unit price
per inch. The accepted quantities of repaired weld will be paid for at the contract unit1200
price per inch.
Bolts, including anchor bolts and threaded rods, will be paid for as the full weight
computed on the basis of 490 lb/cu ft, including nuts and washers, for the actual
number of bolts in the structure.
If welding is shown on the plans, the weights of the structural steel parts will be
computed as described above.
The weight of castings will be computed on the basis of 490 lb/cu ft for cast steel,1210
and 450 lb/cu ft for cast iron, based on the net volume of the finished castings as shown
on the plans, including fillets at angles. No deductions will be made for holes required
to be drilled in castings or for rounding the corners of castings.
An estimated weight of structural steel will be shown on the plans. Such weight
will be computed by the same method as that used when computing the estimated
weight when paid for on a unit price per pound basis from semi-detailed plans. This
weight will include all structural steel and miscellaneous metals unless otherwise
included in specific pay items.1220
The weight of structural steel shown on the plans is approximate only. For a lump
sum pay unit, the Contractor shall determine the weight on which the bid is based.
If there is a discrepancy between the plan weight and the actual weight, no
decrease or increase in the payment for the work will be made on account of such
discrepancy.
If a change in the plans is made which will affect the weight of material to be
furnished, payment for the addition or reduction of structural steel quantities required1230
as a result of such change in plans will be made at a unit price per pound obtained by
dividing the lump sum amount for structural steel by the total estimated weight of
structural steel shown on the plans. Such unit price may be adjusted in consideration
of the fabricating and connection cost. Changes in the plans involving classifications
of structural steel may increase the pay quantities. Such additional quantities will be
paid for on comparison of evidence of invoice prices.
711.73
714
The weight of materials will be shown in the bill of materials on the plans when
this information is included in such plans, or as computed from the fabricator’s1240
approved working drawings when this information is not included in the plans. In
either case, such weight shall include all changes ordered.
For rolled sections, the gross weight of the steel will be considered. The weight
will be figured on the basis of 490 lb/cu ft. The weight of each piece will be the weight
of the smallest regular shape from which the detail piece can be cut, not deducting cuts
or holes. When so shown on the contract plans or on the approved working drawings,
the weight of groups of two or more pieces shall be the weight of the smallest regular
shape from which the given group of detail pieces may be cut by properly arranging
the cuts.1250
Payment will be made under:
Pay Item Pay Unit Symbol
Bolt, Remove ............................................................................. EACH
Bronze Plates ............................................................................. LBS
Drilled Hole ............................................................................... EACH
Jacking and Supporting ________ ............................................ LS
structural member type1260
Peening Weld, UIT .................................................................... INCH
Repair Weld ............................................................................... INCH
Rivet, Remove ........................................................................... EACH
Structural Steel .......................................................................... LS
LBS
Structural Steel, Field Cut ......................................................... SIN
Stud Shear Connectors .............................................................. EACH
The cost of paint removal, painting, non-destructive testing, equipment, labor,
materials, access, permits, and necessary incidentals shall be included in the cost of1270
peening weld, UIT.
The cost of drilling holes for anchor bolts, elastomeric bearings, bridge bearing
pads, fabrication, painting, erecting falsework, welding material, Charpy V-Notch
toughness tests, and necessary incidentals shall be included in the cost of the pay items
in this section.
The cost of stud shear connectors placed on new structural steel will be included
in the cost of structural steel.
1280
No increase in pay weight will be considered if diaphragm connections other than
those shown on the plans are approved and used.
711.73
715
Shims between beams and top shoes of the thicknesses necessary to adjust the
steel to planned elevations shall be furnished using either the plan datum or another
datum as established. No adjustment will be made to the pay quantities as long as the
total weight of shims required does not exceed that planned. No shim shall be less than
1/8 in. in thickness.
No allowance in weight will be made for work which is done at the option of the1290
Contractor. No payment will be made for material used at the convenience of the
Contractor in excess of the quantities shown on the plans.
STEEL STRUCTURES in other states
Get an email when 711 changes
Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.