723.01Description
This work shall consist of constructing a reinforced concrete three-sided arch- topped structure or structure extension with headwalls and wingwalls, a reinforced concrete three-sided flat-topped structure or structure extension with headwalls and wingwalls, or a reinforced concrete true ar ch shape structure or structure extension with spandrel walls and wingwalls in accordance with 105.03. The reinforced concrete three-sided structure, structure extension, headwalls, wingwalls, footings, and spandrel walls may be precast or cast-in-place. 10
The Contractor may be allowed to substitute a box structure in accordance with 714 which shall be subject to a revision of the waterway permits and shall be as approved by the Engineer.
MATERIALS
723.02Materials
Materials shall be in acco rdance with the following:
Chemical Anchor System ............................................ 901.05 Coarse Aggregates, Class A or Higher, Size No. 91 ... 904.03 Epoxy Coated Reinfo rcing Bars .................................. 910.01(b)9 Geotextile .................................................................... 918.02 Hydrated Lime ............................................................. 913.04(a) Joint Membrane for Precast Reinforced Concrete Box and Three-Sided Structure Sections .................. 907.07 723.01
Masonry Ceme nt ......................................................... 901.01(c) 30 Mortar Sand ................................................................. 904.02(e) Natural Sand ................................................................ 904.02(a) Non-Epoxy PCC Sealer ............................................... 909.10 Portland Ceme nt .......................................................... 901.01(b) Precast Reinforced Concrete Headwalls, Wingwalls, Footings, and Spandrel Walls ............ 907.06 Precast Reinforced Concrete Structure Sections ......... 907.05 Preformed Flexible Joint Sealant ................................. 907.11(a) Reinforcing Bars .......................................................... 910.01 Riprap .......................................................................... 904 40 WWR, Smooth a nd Deformed..................................... 910.01
Cast-in-place concrete for a reinforced co ncrete three-sided structure, or splices between an existing culvert structure and a precast reinforced concrete three-sided structure extension shall be class A or higher in accordance with 707.04(c). It shall have a 28-day minimum concrete compressive strength of 5,000 psi. Cast-in-place concrete for headwalls, wingwalls, or spa ndrel walls shall be class A or higher in accordance with 707.04(c). It shall have a 28-day minimum concrete compressive strength of 4,000 psi. 50
When the Contractor elects to provide a cast-in-place structure, acceptance of the structure will be based on tests for relative yield, air content, slump, water/cementitious ratio, and compressive strength. Relative yield and air content shall be in accordance with 702.05. The slump and concrete temperature shall be in accordance with 707.04(c). The amount of time from the introduction of mixing water to the cement and aggregates to the completion of the discharge of the concrete shall not exceed 90 minutes. The water/cementitious ratio shall be in accordance with
707.04(d). The 28-day compressive strength shall be equal to or greater than the
specified concrete compressive strength an d otherwise shall be in accordance with 60
(c)3. The Contractor shall provide the necessary 6 in. diameter by 12 in
cylinder molds for the Department’s use.
For plastic concrete sampling, acceptance testing procedures and casting cylinders will be in accordance with 505.01. Except for footings, concrete flexural strength or results from beam breaks will not be accepted in lieu of concrete compression cylinder test results.
Cast-in-place concrete used to seal existi ng culverts shall be class A. Cast-in-place concrete for footings and base slabs shall be class B. 70
Unless otherwise specified herein, reinforcement may consist of either reinforcing bars or WWR. If specified to be coated, WW R shall be coated with either galvanized coating or epoxy coating. Reinforcing bars shall be coated with epoxy coating. For WWR, material with minimum yield strength of 65 ksi shall be used. 723.02
Reinforcement in headwalls and pedestals shall consist of reinforcing bars and shall be epoxy coated. Reinforcement in spandrel walls shall be coated. If the structure is specified as requiring coated reinforc ement, reinforcement, including support devices, in that structure shall be coated. In lieu of coating, the support device may be 80 manufactured of a non-corrosive material.
Headwalls, wingwalls, and spandrel walls shall be connected to the outside structure sections. Wingwalls shall be connected to the spandrel walls if the structure is a true arch shape structure. Precast headwalls, precast wingwalls, and precast spandrel walls shall be connected with bolted steel plates.
CONSTRUCTION REQUIREMENTS
723.03General Requirements 90
Excavation and disposal shall be in accordance with the applicable requirements of 206. Waterproofing of the designated areas shall be in accordance with 702.23. All underground drains encountered during excavation for the structure shall be perpetuated as dictated by field conditions. Drainage openings through masonry shall be in accordance with 702.16. Handling of three-sided structures shall be in accordance with 907.05. Handling of wingwalls and spandrel walls shall be in accordance with 907.06.
For precast three-sided structures, the ma nufacturer’s representative shall provide technical instruction and on-site technical assistance to the Contractor during the 100 erection of the members.
The three-sided structure, headwalls, wingwalls, and footings shall be designed and constructed in accordance with the dimensions shown on the contract plans. Construction joints shall not be used with in the cross-section of precast three-sided structures unless shown on the contract plans.
723.04Design Requirements
A three-sided structure shall be designed for HL-93 loading in accordance with AASHTO LRFD Bridge Design Specifications. 110
The three-sided structure, headwalls, wingwalls, footings, and spandrel walls shall be designed in accordance with the soil parameters shown in the contract documents.
Headwalls, wingwalls, and spandrel walls shall be designed based on a minimum equivalent fluid pressure of 40 lb/cu ft. If flowable backfill is to be used, the Contractor shall consider the effects of hydrostatic pressure on the structure. Weep holes shall be provided in all wingwalls. Horizontal pressures shall be increased for sloping backfill surfaces and live load surcharge. Head wall connections, wingwall footings, and 120 spandrel walls shall be checked for sliding and for overturning. 723.03
A headwall with guardrail mounted on top, the anchorage of the headwall or spandrel wall to the structure section, or a moment slab with bridge railing, shall be designed for the bridge railing test level shown on the plans.
Continuity shall be established between the structure footing and the wingwall footing.
For three-sided arch-topped or true arch shape structure sections, the concrete cover over the outside circumferential reinforcement shall be a minimum of 2 in. The cover over the inside circumferential reinforcement shall be a minimum of 1 1/2 in. The clear distance of the end circumferential reinforcement shall not be less than 1 in. and no more than 2 in. from the ends of the structure section. The ends of the longitudinal distribution reinforcement shall be no more than 3 in. from the ends of the structure section.
For flat-topped structure sections, the cover dimension over the top mat of reinforcement shall be a minimum of 2 in. The cover over the lower mat of 140 reinforcement in the structure top shall be a minimum of 1 1/2 in. The cover in the legs shall be a minimum of 2 in. The clear distance of the end circumferential reinforcement shall not be less than 1 in. and no more than 2 in. from the ends of the structure section. The ends of the longitudinal distribution reinforcement shall be no more than 2 in. from the ends of the structure section.
Cover for headwall, wingwall, spandrel wall, and pedestal reinforcement shall be a minimum of 2 in. Cover for footing and base slab reinforcement shall be 3 in. for the top and sides and 4 in. for the bottom.
Reinforcement splicing and spacing sh all be in accordance with the AASHTO LRFD Bridge Design Specifications except as indicated herein. Tension splices in circumferential reinforcement shall be made by means of lapping. Where reinforcing bars are used for longitudinal distribution reinforcement, the reinforcing bars shall have a center to center spacing not to exceed 12 in. in flat-topped structure sections or 16 in. in arch-topped or true arch shape structure sections.
Where reinforcing bars are used in wingwalls, the maximum spacing for wingwall reinforcing bars shall be 18 in. for horizontal bars and 12 in. for vertical bars. 160
Exterior corner reinforcement for flat-topped structure sections shall be fully developed beyond the point where it is no longer required to resist flexure.
Working drawings shall be submitted in accordance with 105.02 for:
723.04
three-sided structure,
structure extension,
The working drawings shall include notes indicating design assumptions, applicable design codes, and material re quirements, all details, dimensions, and quantities necessary to construct the structure, headwalls, wingwalls, or spandrel walls and shall include, but not be limited to, the following information:
details, locations and details of lifting devices or inserts, locations and details of pre- or post-installed anchorages, concrete clear cover, size and spacing of reinforcing bars or WWR, and reinforcing bar bending diagrams. An analysis of the precast segment modeled as a simple span and designed in accordance with AASHTO LRFD Bridge Design Specifications Section 5.7.3. This analysis sh all demonstrate that the precast 190 segment is designed to withstand the forces of erection. Details for providing horizontal restraint of the structure legs during installation until after the completion of backfill placement shall be included unless the analysis indicates such details are not needed.
reinforcing bar sizes, reinforcing bar bending diagrams, lengths, spacings, and anchorag e details. Headwall elevation and section views shall be provided. 200
dimensions, elevations, reinforcement sizes, bending diagrams, lengths, spacings, and anchorage details. Wingwall plan, elevation, and section views shall be provided.
elevations, reinforcement sizes, bending diagrams, lengths,
spacings, and anchorage details. Spandrel wall elevation and
section views shall be provided.210
dimensions, elevations, reinforcing bar sizes, reinforcing bar
bending diagrams, lengths, and spacings indicated. Footing
723.04
799
plan and section views shall be provided. If a pile footing is
required, the pile layout shall be shown. The actual soil bearing
pressure shall be shown on the footing detail sheets.
if required.220
wingwalls.
structure.
be submitted with the working drawings where the structure
span length measured along the roadway centerline is greater230
than 20 ft, except where the height of cover is greater than 8 ft
and exceeds the perpendicular span length. The structure shall
load rate greater than 1.0 for the loading described herein or as
shown on plans. The load rating methodology shall be in
accordance with the AASHTO Manual of Bridge Evaluation
using the LRFR methodology.
723.05Manufacture
The structure sections, headwalls, wingwalls, footings and spandrel walls shall be
free of fractures. Headwalls, wingwalls, and spandrel walls shall be given a finish in240
accordance with 702.21.
The structure units shall not be stored in an upright position until the designated
handling and storage compressive strength, as shown on the working drawings, has
been achieved.
723.06Rejection
Structure sections, wingwalls, footings, or spandrel walls will be rejected due to
the following conditions.
250
single end crack which does not exceed one-half the thickness of the
section or wall,
not in accordance with this specification,
satisfactory joint.
723.06
800
723.07Repairs
Structure sections, headwalls, wingwalls, footings, or spandrel walls shall be
repaired, when necessary, due to imperfections in manufacture, handling damage, or
construction. Repairs will be acceptable if it is determined that the repairs are sound,
properly finished and cured, and if the repaired structure section headwall, wingwall,
footing, or spandrel wall is in accordance with the requirements herein.
723.08Trench Compaction270
The soils in the bottom of the excavation shall be compacted to 95% of the
maximum dry density in accordance with 203.23. If 95% of the maximum dry density
cannot be obtained in the bottom of the excavation or in other areas, the Office of
Geotechnical Services shall be contacted for additional recommendations. If during
construction, soft soils are encountered at depths that make removal impractical, the
Office of Geotechnical Services shall be contacted for additional recommendations.
723.09Footings
All footings shall be given a smooth float finish. Footing concrete shall reach a
compressive strength of 2,000 psi or flexural strength in accordance with 702.24(c)280
prior to placement of the structure sections or wingwalls. The surface shall not vary
more than 1/4 in. in 10 ft when tested with 10 ft straightedge.
An 8 in. layer of coarse aggregate No. 8 in accordance with 301 shall be placed
under the full width of the footing. Precast footings shall be made into a continuous
strip footing using closure pours between the precast units. Closure pours shall be as
detailed in the working drawings and shall be designed to accommodate the design
loads.
723.10Pedestals290
Where a reinforced concrete pedestal is required between the base of the structure
leg and the top of the footing to provide the required rise and low structure elevation
as shown on the contract plans, the Contractor shall have the option of providing a
structure with extended legs or constructing the pedestals.
723.11Placement of Structure Sections and Wingwalls
For three-sided arch-topped structures and three-sided flat-topped structures, the
structure sections shall be set on masonite or steel shims. Each wingwall that is not
precast as one unit with the footing shall be set on masonite or steel shims. A minimum
gap of 1/2 in. shall be provided between the footing and the bottom of each section or300
wingwall. Once the wingwalls or structure sections are placed, the space underneath
the wingwall or structure leg section to the top of the keyway sides shall be filled with
prepackaged grout in accordance with ASTM C1107, or conventional or self-
consolidating fine grout in accordance with ASTM C476, except as modified herein.
If conventional fine grout is used, it shall be troweled into the keyway and mounded
on one side of the leg or wingwall. The mound of conventional fine grout shall be
vibrated until it passes through to the other side of the leg or wingwall. After
723.07
801
completing this process on one side, if the conventional fine grout has not passed
through to the other side, the process shall be repeated on the other side. Conventional
or self-consolidating fine grout shall be from a prepackaged source or composed of310
one of the following mixtures:
mortar sand.
mortar sand.
with No. 23 natural sand or mortar sand.320
The maximum water/cement ratio shall be 0.446 for both conventional and self-
consolidating fine grout. An air-entraining agent from the QPL of PCC Admixtures
and Admixture Systems may be used. A Type F or Type G chemical admixture from
the QPL of PCC Admixtures and Admixture Systems shall be used in self-
consolidating fine grout to achieve the slump flow and visual stability index
requirements. Filling procedure B of ASTM C1611 will be used for measuring slump
flow. Appendix X1 of ASTM C1611 will be used for determining the visual stability
index value.
330
Acceptance of conventional fine grout will be based on an air content of 12%
±4%. Acceptance of self-consolidating fine grout will be based on tests for air content,
slump flow, and visual stability index. Air content shall be 12% ±4%. Slump flow
shall be 27 in. ±3 in. Visual stability index value shall not exceed 1. A Type C
certification in accordance with 916 shall be provided for prepackaged grout.
True arch shape structures may have grout leveling pads poured in the footing
keyways to ensure the correct seating of the true arch sections. Leveling pads shall be
approximately 2 in. thick and 16 in. long to ensure that each true arch section is resting
on approximately 8 in. of pad at each joint. The leveling pads shall be poured within340
1/8 in. of the required elevation. No loads shall be placed on the grout leveling pads
within 72 h of their placement. Masonite shims may also be used as leveling pads.
Concrete blocks of 1 1/2 in. thickness, hardwood wedges, and steel or plastic shims
shall be placed to retain the true arch sections in their proper positions until grout can
be placed in the keyway. Grout shall be consolidated in the keyway to ensure that the
entire area around the true arch section is completely filled. The grout used to construct
the leveling pads and to fill the keyways shall be in accordance with this section. Grout
shall not be placed if the air temperature is expected to be below 35°F for a period of
72 h following grout placement.
350
723.12Extension of Existing Structure
All applicable requirements of this specification shall apply to the extension of an
existing three-sided arch-topped structure with headwalls and wingwalls, a three-sided
flat-topped structure with headwalls and wingwalls, or a true arch shape structure with
723.12
802
spandrel walls and wingwalls. Such portions of the existing structure designated for
removal shall be removed. All portions of the existing structure which are to remain
in place and are damaged shall be repaired or replaced as directed. Those portions left
in place which are wholly or partially filled with debris shall be cleaned out. Material
removed shall be disposed of in accordance with the applicable requirements of
202.02.360
Before removing concrete from an existing structure with wingwalls, the
Contractor shall saw around the perimeter of the removal area on the interior and
exterior of the existing structure a depth of 1 in. All existing reinforcement in the top
slab and sidewalls exposed after concrete removal shall be cleaned and straightened in
preparation for lapping with reinforcement from adjacent new work. Where existing
reinforcement has deteriorated or been damaged during the removal operation, holes
shall be drilled into the face of the existing structure to provide embedment for
replacement reinforcing bars. The holes shall be of the diameter and depth required by
the chemical anchor system manufacturer. The holes shall be cleaned prior to placing370
the chemical anchor system and the reinforcing bars.
No concrete shall be removed from an existing structure that has a headwall but
no wingwalls. Reinforcing bars to tie the existing structure to the new structure section
shall be installed by drilling holes into the face of the existing structure to provide
embedment for reinforcing bars. The diameter and depth of the holes shall be in
accordance with the recommendations of the manufacturer of the chemical anchor
system. The holes shall be cleaned prior to placing the chemical anchor system and
the reinforcing bars.
380
An existing structure shall be extended by means of one of the following methods.
A cast-in-place concrete splice shall be constructed as a transition between the
existing structure and the precast structure extension. The splice reinforcement in the
precast structure extension section that will abut the existing structure shall be exposed
18 in. on the tongue end of the precast structure extension section. It shall be lapped
18 in. with either exposed existing structure reinforcement, in the case of an existing
structure with wingwalls, or newly installed reinforcing bars in the existing structure,
in the case of an existing structure with a headwall only as shown on the plans. Existing390
exposed structure reinforcement from an existing structure with wingwalls shall be cut
off 1 in. from the face of the new precast extension.
If the existing tongue or groove joint end is acceptable and matches the mating
joint on the new precast reinforced concrete structure extension section, the new
extension may be installed using the mating joint of the existing structure. No cutting
of the structure or splicing of reinforcement is then required. The joint between the
new precast structure extension and the existing structure shall be sealed as directed
below.
400
723.12
803
The reinforcement for the structure extension shall be lapped with the exposed
reinforcement of the existing structure as shown on the plans.
723.13Blank
723.14Precast Reinforced Concrete Three-Sided Structure Section Joints
Joints between precast reinforced concrete structure sections for three-sided arch-410
topped structures and true arch shape structures, and for flat-topped structures with
cover of 3 ft or more, may be either butt joints or keyway joints.
All butt joints shall be sealed with preformed flexible joint sealant as shown on
the plans. The sealant shall be applied once the concrete surface temperature is above
40°F or above the minimum application temperature recommended by the joint sealant
manufacturer. The concrete surfaces shall be clean and dry prior to application of the
joint sealant. Heat may be applied to the concrete surfaces until they are in accordance
with the temperature and dryness requirements.420
Joints in true arch shape and flat-topped structures shall be sealed with 1 1/2 in.
diameter preformed flexible joint sealant.
The sections of flat-topped structures with less than 3 ft of cover shall be produced
with a minimum 4 in. depth by 1 1/2 in. width keyway joint. Non-shrink grout in
accordance with 707.09 shall be placed in the keyway joint.
After sealing with preformed flexible joint sealant or non-shrink grout as directed
above, and assembly of three-sided structure sections, all butt and keyway joints
between structure sections shall be covered with a joint membrane in accordance with
907.07and centered on the joint
The exterior surface of the concrete sections shall be clean and dry before the joint
membrane is applied. The outside surfaces of the top slab and both walls of every joint
shall be completely covered for the entire length of each joint. Where joining two
sections of joint membrane material, or where two ends meet, a 3 in. overlap shall be
provided. The overlapping strip shall be firmly pressed onto the end of the underlying440
strip to seal the joint. Joints between structure sections and wingwalls, between
wingwalls and spandrel walls, and between structure sections and headwalls or
spandrel walls shall also be covered with a joint membrane.
The joint membrane shall be maintained in its installed location centered on the
joint. It shall not be damaged during the backfilling operation.
723.14
804
723.15Backfilling
Structure backfill shall be placed and compacted in accordance with 211.
Structure backfill shall be placed and compacted on each side of the structure to the450
fill line shown on the plans. During the backfill operation, the difference in elevations
of the fill on each side of the structure shall not exceed 24 in.
Unless otherwise specified by the manufacturer on the working drawings, once
the level of structure backfill reaches the top of the structure, two lifts shall be placed
and hand compacted over the structure without traversing the structure with heavy
equipment. Compaction with heavy equipment will not be allowed until a minimum
of two lifts have been placed, hand compacted, and accepted.
The operation of equipment over the structure shall be in accordance with the460
structure manufacturer’s recommendations.
723.16Scour Protection
When riprap is specified, geotextile shall first be placed on the in-situ soil in
accordance with 616.11. Riprap shall then be placed in accordance with 616.
For concrete base slabs, concrete shall be placed in accordance with 702.
723.17Method of Measurement
Precast reinforced concrete three-sided flat-topped structures or structure470
extensions, precast reinforced concrete three-sided arch-topped structures or structure
extensions, precast reinforced concrete true arch structures or structure extensions,
cast-in-place reinforced concrete three-sided flat-topped structures or structure
extensions, cast-in-place reinforced concrete three-sided arch-topped structures or
structure extensions, and cast-in-place reinforced concrete true arch structures or
structure extensions will not be measured. The accepted quantities for payment will
be the quantities shown on the plans.
Structure backfill will be measured in accordance with 211.09. Flowable backfill
will be measured in accordance with 213.08. Geotextile and riprap will be measured480
in accordance with 616.12. Field drilled holes will be measured in accordance with
702.27
Plain or coated reinforcement or WWR used in precast reinforced concrete three-
sided flat-topped structures or structure extensions, precast reinforced concrete three-
sided arch-topped structures or structure extensions, precast reinforced concrete true
arch structures or structure extensions, precast headwalls, precast wingwalls, cast-in-
place reinforced concrete three-sided flat-topped structures or structure extensions,
cast-in-place reinforced concrete three-sided arch-topped structures or structure
extensions, cast-in-place reinforced concrete true arch structures or structure490
extensions, cast-in-place headwalls, or cast-in-place wingwalls will not be measured
for payment.
723.15
805
If the Contractor elects to provide a box structure in lieu of the three-sided
structure shown on the plans, it will be measured in accordance with 714.11.
723.18Basis of Payment
The accepted quantities of precast reinforced concrete three-sided flat-topped
structures or structure extensions, precast reinforced concrete three-sided arch-topped
structures or structure extensions, precast reinforced concrete true arch structures or500
structure extensions, cast-in-place reinforced concrete three-sided flat-topped
structures or structure extensions, cast-in-place reinforced concrete three-sided arch-
topped structures or structure extensions, and cast-in-place reinforced concrete true
arch structures or structure extensions, of the size specified will be paid for at the
contract unit price per linear foot.
Structure backfill will be paid for in accordance with 211.10. Flowable backfill
will be paid for in accordance with 213.09. Geotextile and riprap will be paid for in
accordance with 616.13. Field drilled holes will be paid for in accordance with 702.28.
510
If the Contractor elects to provide a box structure in lieu of the three-sided
structure shown on the plans, it will be paid for in accordance with 714.12. The
Department will not incur additional cost for allowing the Contractor to substitute a
box structure for the three-sided structure shown on the plans.
Payment will be made under:
Pay Item Pay Unit Symbol
Structure Extension, Coated Reinforced Concrete,520
Three-Sided Sections, ____ in. x ____ in. .......................... LFT
span rise
Structure Extension, Reinforced Concrete,
Three-Sided Sections, ____ in. x ____ in. .......................... LFT
span rise
Structure, Coated Reinforced Concrete,
Three-Sided Sections, ____ in. x ____ in. .......................... LFT
span rise
Structure, Reinforced Concrete,
Three-Sided Sections, ____ in. x ____ in. .......................... LFT530
span rise
The cost of all design, coring, testing, pedestals or extended legs, excavation,
repairs, plugging core and handling holes, mortar, grout, sealer, preformed flexible
joint sealant, joint membrane, cylinder molds, and necessary incidentals shall be
included in the cost of the structure or structure extension.
The cost of spandrel walls, concrete base slab, footings, and aggregate base under
footings shall be included in the cost of the structure or structure extension.
540
723.18
806
The cost of precast concrete headwalls, precast concrete wingwalls, cast-in-place
headwalls, or cast-in-place wingwalls shall be included in the cost of the structure or
structure extension.
The cost of plain or coated reinforcement or WWR used in precast reinforced
concrete three-sided structures, precast reinforced concrete three-sided structure
extensions, precast headwalls, precast wingwalls, cast-in-place reinforced concrete
three-sided structures, cast-in-place reinforced concrete three-sided structure
extensions, cast-in-place headwalls, or cast-in-place wingwalls shall be included in the
cost of the structure or structure extension.550
The cost of concrete used in a cast-in-place splice shall be included in the cost of
the structure extension.
The cost of footings for wingwalls and aggregate base under the wingwall
footings shall be included in the cost of the structure or structure extension.
The quantities for payment shall remain as shown on the plans whether the
Contractor installs the three-sided arch-topped structure or structure extension, the
three-sided flat-topped structure or structure extension, or the true arch shape structure560
or structure extension.
No additional payment will be made for carrying an underground drain through a
structure or structure extension. However, no deduction will be made for the volume
of concrete occupied by the drain pipe in a cast-in-place structure or structure
extension.
No additional payment will be made for the repair or replacement of existing
concrete damaged by Contractor operations.
REINFORCED CONCRETE THREE-SIDED STRUCTURES in other states
Get an email when 723 changes
Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.