715.01Description
This work shall consist of the construction or reconstruction of pipe culverts, storm or sanitary sewers, slotted drain pipe, or slotted vane drain pipe in accordance with 105.03.
MATERIALS
715.02Materials 10
Pipe materials, minimum thickness or strength classification, and protective treatments for pipes except underdrains and drain tile will be determined based on height of cover, required service life, site abrasiveness, and structure pH criteria shown on the plans. Pipe with material thickness, strength classification, or protective coatings in excess of the minimum required by the above noted criteria may be used. When metal pipe is selected, the same base metal and coating shall be used for the structure or a pipe extension.
715.02
Concrete used for anchors, collars, grated box end sections, encasements, and sealing existing pipes shall be class A. Corrugated polyethylene pipe, TypeS has a 20 smooth interior liner with a corrugated outer wall. Type SP pipe is a TypeS pipe with perforations.
Materials shall be in acco rdance with the following:
B Borrow ..................................................................... 904.06* Geotextiles ................................................................... 918.02 Pipe Joint Sealant ........................................................ 907.11 30 Reinforcing Bars .......................................................... 910.01 Rubber Type Gaskets .................................................. 907.13 Straps, Hook Bolts, and Nuts....................................... 908.12
* B borrow consisting of ACBF or GBF shall not be used within 2 ft of the free water level.
The maximum particle size of backfill material for corrugated pipe shall be less than 1/2 the corrugation depth.
Type 1 pipe shall be used for culverts under mainline pavement and public road approaches and shall be in accordance with the following:
Clay Pipe, Extra Strength ............................................ 907.08 Corrugated Aluminum Alloy Pipe and Pipe-Arches ... 908.04 Corrugated Polyethylene Pipe, TypeS ........................ * Corrugated Polypropylene Pipe ................................... * Corrugated Steel Pipe and Pipe-Arches ....................... 908.02 Non-Reinforced Concrete Pipe, Class 3 ...................... 907.01 50 Polymer Precoated Galvanized Corrugated Steel Pipe and Pipe-Arches ............................................ 908.08 Profile Wall Polyethylene Pipe, Closed....................... * Profile Wall Polyethylene Pipe, Ribbed ...................... * Profile Wall PV C Pipe................................................. * Reinforced Concrete Horizontal Elliptical Pipe .......... 907.03 Reinforced Concrete Pipe ............................................ 907.02 Smooth Wall Polyethylene Pipe .................................. * Smooth Wall PVC Pipe ............................................... * Spiral Rib Steel Pipe .................................................... 908.02 60 Structural Plate Pipe and Pipe-Arches ......................... 908.09 * All thermoplastic pipes shall be from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16.
715.02
Type 2 pipe shall be used for storm sewers and shall be in accordance with the following:
Clay Pipe, Extra Strength ............................................ 907.08 Corrugated Polyethylene Pipe, TypeS ........................ * 70 Corrugated Polypropylene Pipe ................................... * Fully Bituminous Coated and Lined Corrugated Steel Pipe and Pipe-Arches ............................................ 908.07 Non-Reinforced Concrete Pipe, Class 3 ...................... 907.01 Polymer Precoated Galvanized Corrugated Steel Pipe and Pipe-Arches Type IA and Type IIA ....... 908.08 Profile Wall Polyethylene Pipe, Closed ...................... * Profile Wall Polyethylene Pipe, Ribbed ...................... * Profile Wall PVC Pipe................................................. * Reinforced Concrete Horizontal Elliptical Pipe .......... 907.03 80 Reinforced Concrete Pipe ............................................ 907.02 Smooth Wall Polyethylene Pipe .................................. * Smooth Wall PVC Pipe ............................................... * * All thermoplastic pipes shall be from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16.
Type 3 pipe shall be used for culverts under all drives and field entrances. All Type 1 pipe materials are acceptable.
Type 4 pipe shall be used for drain tile and longitudinal underdrains and shall be in accordance with the following:
Clay Pipe** ................................................................. 907.08 Corrugated Polyethylene Drainage Tubing ................. * Corrugated Polyethylene Pipe, TypeS** .................... * Corrugated Polyethylene Pipe, Type SP ...................... * Drain Tile** ................................................................ 907.10 Non-Reinforced Concrete Pipe .................................... 907.01 100 Perforated Clay Pipe** ................................................ 907.09 Perforated PVC Semicircular Pipe .............................. * Profile Wall PVC Pipe................................................. * * All thermoplastic pipes shall be from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16. ** These materials shall be used for drain tiles only.
Type 5 pipe shall be used for broken-back pipe runs where coupled or jointed pipe is desirable and shall be in accordance with the following: 110
715.02
Corrugated Aluminum Alloy Pipe and Pipe-Arches ... 908.04 Corrugated Polyethylene Pipe, TypeS ........................ * Corrugated Polypropylene Pipe ................................... * Corrugated Steel Pipe and Pipe-Arches ....................... 908.02 Fully Bituminous Coated and Lined Corrugated Steel Pipe and Pipe-Arches ................................... 908.07 Polymer Precoated Galvanized Corrugated Steel Pipe and Pipe-Arches ............................................ 908.08 Profile Wall Polyethylene Pipe, Closed....................... * 120 Profile Wall Polyethylene Pipe, Ribbed ...................... * Profile Wall PV C Pipe................................................. * Smooth Wall Polyethylene Pipe .................................. * Smooth Wall PVC Pipe ............................................... * Spiral Rib Steel Pipe .................................................... 908.02 * All thermoplastic pipes shall be from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16.
Slotted drain pipe shall be used to drain paved median and concrete gutter areas. 130 Slotted drain pipe shall be in accordance with 908.14.
Slotted vane drain pipe shall be used to drain driveway areas. Slotted vane drain pipe shall be in accordance with 908.14.
End bent drain pipe shall be perforated profile wall PVC pipe, perforated smooth wall PVC pipe, or corrugated polyethylene drainage tubing Type SP from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16. 140
Pipe for underdrain outlets and drain tile outlets shall be PSM PVC pipe, profile wall PVC pipe, smooth wall polyethylene pipe, or smooth wall PVC pipe from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16 and
907.24. Schedule 40 PVC pipe in accordance with 907.24 is also allowable
Grating for box end sections shall be in accordance with 910.22. Threaded inserts for Type II grated box end sections shall have a minimum pull-out capacity of 6,000 150 lb. The 1/2 in. round bolts shall have hex heads, cut washers, and where necessary, shall be furnished with the grating. Th e aggregate leveling be d required for precast units shall be coarse aggregate No. 8 in accordance with 904.03. The hardware cloth used to cover the weep holes may be plastic with 1/4 in. mesh or galvanized steel wire No. 4 mesh with a minimum wire diameter of 1/32 in. It shall be firmly anchored to the outside of the structure and shall be centered on the holes.
715.02
A Type C certification in accordance with 916 shall be provided for the materials in this section unless otherwise specified.
Metal pipe end sections shall be in accordance with 908.06. Precast concrete pipe end sections shall be in accordance with 905.06.
Pipe used for extending roadway drain castings located in a bridge deck shall be in accordance with 907.23, 907.28, or 908.10. Pipe support brackets and all hardware shall be galvanized in acco rdance with ASTM A153, class D or ASTM B695, class 40, type I. A Type C certification in accordance with 916 shall be provided for the pipe brackets. 170
Pipe used as drainage pipe through conc rete masonry as described in 702.16 shall be either profile wall or smooth wall PVC from the QPL of Thermoplastic Pipe and Liner Pipe Sources in accordance with 907.16, or steel in accordance with 908.11.
Pipe and fittings used in an enclosed bridge deck drainage system shall be cast iron soil pipe in accordance with 908.10 or reinforced thermosetting resin pipe in accordance with 907.28. All mounting hardware shall be installed in accordance with 180 the pipe manufacturer’s recommendations. All mounting hardware shall be galvanized in accordance with ASTM B695, class 40, type I. A Type C certification in accordance with 916 shall be provided for the pipe brackets.
CONSTRUCTION REQUIREMENTS
715.03General Requirements
The construction requirements, method of measurement, basis of payment, and pay items described herein shall apply, ex cept for the following, which are described in their respective sections. 190
A pipe order shall be prepared and submitted prior to delivery of pipe to the project site. The order shall include the following:
715.03
conformance with cover and service life criteria
structures.
When riprap is specified, geotextile shall first be placed on the in-situ soil in accordance with 616.11. Riprap shall then be placed in accordance with 616.
715.04Excavation
Unless otherwise directed, the trench cross-sectional dimensions shall be as shown on the plans. The trench bottom shall give full support to the pipe as shown on the plans. Recesses shall be cut to receive any projecting hubs or bells.
Where pipe is to be placed in fill sections , a portion of the fill shall be constructed
prior to installation of the pipe as shown on the plans.
Where rock or boulder formation is encountered at or above the proposed trench
bottom elevation, the trench shall be excavated at least 8 in. below the proposed grade,
backfilled with structure backfill, and compacted in accordance with 211.04.
In case a firm foundation is not encountered at the required grade, the unstable
material shall be removed to a depth that when replaced with suitable material, usually
B borrow, compacted, and properly shaped, it will produce a uniform and stable230
foundation along the entire length of the pipe. A timber mat shall be placed to hold the
pipe to line and grade if necessary.
All trenches shall be kept free from water until any joint filling material has
hardened sufficiently not to be harmed.
715.05Laying Pipe
Each section of pipe shall have a full firm bearing throughout its length, true to
the line and grade given. All pipes which settle or which are not in alignment shall be
taken up and re-laid. Pipe shall not be laid on a frozen trench bottom. Fully bituminous240
coated and lined pipe and pipe-arches shall only be placed when the ambient
temperature is 35°F or above.
Concrete and clay pipe shall be laid with hub upgrade, with the spigot end fully
extended into the adjacent hub, and with all ends fitted together tightly. Concrete pipe
shall not be laid in muck or sulphate soils.
Except for circular concrete pipe, pipe joints designed to accommodate seals or
pipe joints requiring seals shall be sealed with rubber type gaskets, caulking, pipe joint
715.04
739
sealant, elastomeric material, or sealing compound. Circular concrete pipe joints shall250
utilize rubber type gaskets.
If the infiltration of water is a factor, each joint, regardless of the type used, shall
be sealed with a compression type joint sealer in accordance with ASTM C425 or
ASTM C443, whichever is applicable.
Joints and stub-tee connections for thermoplastic pipe shall be in accordance with
the requirements of the respective material specifications for each type of pipe.
Connections of thermoplastic pipe to manholes, catch basins, and inlets shall be260
in accordance with the manufacturer’s recommendations.
Prior to being lowered into the trench, corrugated metal pipe sections shall be
examined closely and so fitted that they will form a true line of pipe when in place.
Sections which do not fit together properly shall not be used.
At the time of acceptance, all pipes shall have been cleaned and be free from silt
and other foreign matter.
Prior to constructing a pipe extension, the existing structure shall be cleaned of all270
foreign materials. Existing anchors, end sections, or headwalls shall be removed as
shown on the plans or as directed. All existing pipes which are damaged by the
removal operation shall be replaced. Removed materials shall be disposed of in
accordance with 202.
715.06Joining Pipe
Band couplers for AASHTO M 36 type I and type II corrugated steel pipe and
pipe-arches shall have corrugations that mesh with the corrugations of the pipe
sections being joined or the annular rerolled ends of those pipe sections. Band couplers
with projections or dimples may be used with pipe having either annular or helical280
corrugations only when corrugated band couplers will not provide a matching
connection to both pipes. Band couplers for AASHTO M 36 type IA and IIA
corrugated steel pipe and pipe-arches shall have corrugations that mesh with the
corrugations of the pipe or shall be gasketed flat bands. Couplers for AASHTO M 36
type IR ribbed steel pipe shall be in accordance with AASHTO M 36 and the
manufacturer’s recommendations.
At the connection of a pipe extension to an existing structure where the joint
system of the pipe extension differs from that in place, or if a satisfactory joint cannot
be obtained between the two structures, a concrete collar shall be constructed. Portions290
of the existing structure shall be removed as shown on the plans, or as necessary, to
ensure proper fit of the extension to the existing pipe. If not shown on the plans, the
collar shall have a width of at least 18 in. and a thickness of at least 6 in. around the
entire joint.
715.06
740
If rigid pipe connections are of lesser strength than that of the main barrel of a
pipe structure, these connections shall be encased with concrete at least 6 in. thick.
Any pipe which is damaged during installation shall be repaired or replaced as
directed.300
Slotted drain pipe or slotted vane drain pipe shall be constructed in 20 ft sections
with shop fabricated elbows. The upgrade end of slotted drain pipe shall be plugged
with a metal cap before backfilling. The upgrade end of slotted vane drain pipe shall
be plugged with class A concrete. Such concrete shall extend 6 in. inside the upgrade
end of the pipe.
715.07Tee and Stub-Tee Connections
At locations shown on the plans, or where directed, a stub-tee connection of the
size specified shall be furnished and placed as a tee connection to corrugated metal310
pipe, corrugated metal pipe-arch, concrete pipe, reinforced concrete pipe, or reinforced
concrete horizontal elliptical pipe.
The stub-tee connection to a corrugated metal pipe, ribbed metal pipe, or
corrugated metal pipe-arch shall be constructed of corrugated or ribbed metal and the
length of the stub shall be no less than that which readily accommodates the connecting
band. It shall be made by shop welding a stub of corrugated or ribbed metal pipe to
the respective corrugated metal pipe or pipe-arch or ribbed metal pipe at the time of
fabrication. Where field conditions warrant, stub-tee or other connections may be field
connected by using shop fabricated saddle connectors. Welds, flame cut edges, and320
damaged spelter coating shall be regalvanized or painted with zinc dust-zinc oxide
paint in accordance with Federal Specification TT-P-641, type II or MIL-P-21035.
Where applicable, damaged bituminous coating shall be repaired with asphalt mastic
in accordance with AASHTO M 243. The pipe connection to the stub shall be made
by means of connecting bands of required size or by means of concrete collars as
directed.
The stub-tee connection to concrete pipe, reinforced concrete pipe, or reinforced
concrete horizontal elliptical pipe may be field constructed or factory constructed. The
concrete used in the stub shall be of the same proportions as that used in the330
construction of such pipe. The length of the concrete stub shall be no less than 6 in.
and no more than 12 in. The pipe connection to the concrete stub shall be made by
means of a cement mortar bead or concrete collar or as directed.
715.08Blank
715.09Backfilling
All pipe trenches shall be backfilled with structure backfill. Structure backfill
shall be placed in accordance with 211. Structure backfill nominal sizes 2 in. and 1 1/2
in. shall not be used as pipe backfill on any pipe with exterior ribs, corrugations, or340
other profile.
715.07
741
If a pipe is to be backfilled using one of the flowable backfill options, design
calculations shall be submitted in accordance with 105.02, either proving the pipe will
not float or detailing the methods to be taken to prevent the pipe from floating during
installation of the flowable backfill. Prior to placing one of the flowable backfill
options for structure backfill, all standing water shall be removed from the trench. If
water cannot be removed from the trench, one of the non-flowable structure backfill
options shall be used to backfill to an elevation 2 ft above the water. The remainder of
the trench shall be backfilled as shown on the plans.350
Where material other than structure backfill is allowed and used for backfilling, it
shall be of such nature that compacts readily. The portion around and for 6 in. above
the top of the pipe shall be free from large stones. The material shall be placed in layers
not exceeding 6 in. loose measurement, and each layer shall be compacted thoroughly
by means of mechanical tamps.
Whenever a fine aggregate or dense graded backfill is placed on top of a coarse
graded backfill, geotextile, in accordance with 918.02(a), Type 2A shall be used
between the different backfill materials.360
Backfill for slotted drain pipe and slotted vane drain pipe shall consist of class A
concrete on both sides of the pipe. During the backfilling and paving operations, the
slot shall be covered to prevent infiltration of material into the pipe.
All pipes, except underdrains, will be visually inspected for acceptance a
minimum of 30 days after the completion of backfill operations. Pipes that cannot be
visually inspected shall be video inspected for acceptance using equipment in
accordance with 718.07. The Engineer will determine the sections of pipe to be video
inspected.370
For pipes that were video inspected, a copy of the video inspection shall be
provided in a format acceptable to the Engineer. The video inspection shall be
provided prior to performing the mandrel testing or if mandrel testing is not required,
prior to acceptance of the pipe.
Type 3 pipes in accordance with 715.02(c) are excluded from the mandrel testing
and video inspection requirements.
For pipe not requiring mandrel testing that is determined to be unacceptable by380
the Engineer, the unacceptable pipe shall be replaced between the nearest pipe joints
or to the nearest structure, or a remediation plan shall be prepared by a professional
engineer and submitted to the Engineer for final determination.
After the visual or video inspection, the Contractor shall check pipe deflection by
performing a mandrel test as directed on pipes manufactured from materials listed in
the following table. The Engineer will determine the runs of pipe installations to be
715.09
742
mandrel tested with a minimum of 10% of the total length of each material to be
inspected.
390
PIPES REQUIRING MANDREL TESTING
Pipe Material Standard Specifications
Corrugated Polyethylene Pipe* 907.17(b)
Corrugated Polypropylene Pipe 907.19
Profile Wall Polyethylene Pipe 907.20
Smooth Wall Polyethylene Pipe 907.21
Profile Wall PVC Pipe* 907.22
Smooth Wall PVC Pipe 907.23
* When used as underdrain pipe, mandrel testing will not be required.
The mandrel shall have a minimum of nine arms or prongs and a diameter that is
95% of the nominal pipe diameter. The Contractor shall provide a proving ring that is
95% of the nominal pipe diameter for each mandrel.
The Contractor shall pull the mandrel through the pipe by hand. If the mandrel
does not pass through the pipe, the Contractor shall measure and report the minimum
diameter of the deficient pipe to the Engineer.
If the minimum diameter of the deficient pipe is between 92.5% and 95.0% of the400
nominal pipe diameter, the Contractor shall provide an evaluation of the deficient pipe
prepared by a professional engineer. The evaluation shall consider the severity of the
deflection and its effects on structural integrity, environmental conditions, and the
design service life of the pipe. A report summarizing the evaluation and including the
professional engineer’s recommendation for acceptance, remediation, or replacement
of the pipe shall be submitted to the Engineer for final determination.
If the minimum diameter of the deficient pipe is equal to or less than 92.5% of the
nominal pipe diameter, the deficient pipe shall either be replaced or a remediation plan
shall be prepared by a professional engineer and submitted to the Engineer for final410
determination.
The deficient pipe shall be replaced if the professional engineer’s remediation
plan recommends replacement of the pipe or if the pipe has been damaged.
Deficient pipe shall at a minimum be replaced between the nearest pipe joints or
to the nearest structure. Replaced or remediated pipe sections shall be mandrel tested
a minimum of 30 days after the completion of backfill operations.
715.10Pipe End Sections, Anchors, Grated Box End Sections, and Safety420
Metal End Sections
Pipe end sections, anchors, grated box end sections, and safety metal end sections
shall be constructed as shown on the plans or as directed.
715.10
743
Straps or hook bolts required for anchors shall be as shown on the plans. Anchor
straps shall be placed at both the upstream and downstream end of each corrugated
aluminum alloy, corrugated steel, structural plate pipe, or pipe-arch with a diameter or
span of 42 in. or greater. Hook bolts and anchor straps shall be placed at both the
upstream and downstream end of each corrugated aluminum alloy, corrugated steel,
structural plate pipe, or pipe-arch with a diameter or span of 84 in. or greater.430
A dimpled connection band shall be used for connecting pipe end sections and
safety metal end sections to ends of corrugated metal pipe whose end corrugations are
not perpendicular to the centerline of the pipe.
Grated box end sections shall be constructed according to the required pipe size
and surface slope of the grated box end section specified at each location. Precast units
shall be cast as a single complete unit, except for the toewall which shall be cast in
place. They shall be set and leveled on a 6 in. thick bed of coarse aggregate. If precast
units are used and the adjoining pipe is to be field connected directly to the precast440
unit, the connection shall be made using a class A concrete collar of 6 in. minimum
longitudinal and radial thickness. Inserts for approved lifting devices may be cast in
the bottom slab of the precast sections. The number and location of lifting devices
needed for handling shall be determined by the fabricator. All reinforcement shall have
a minimum cover of 1 1/2 in. and shall have a minimum lap of 21 in. The Type A
construction joint between the floor and the wall is optional for cast in place units.
715.11Re-Laid Pipe
Where shown on the plans or as directed, existing pipe shall be taken up, re-laid,
and if necessary, extended. Removal of the pipe shall be in accordance with 202.04450
and the operations involved in its relaying shall be in accordance with similar
operations contained herein for laying new pipe.
715.12Pavement Replacement
Where a structure is to be placed under an existing pavement, the pavement
removal and replacement shall be as shown on the plans.
The pavement replacement areas in asphalt pavements shall be filled with HMA
for Structure Installation of the mixture type specified in the pay item in accordance
with 402 except OG mixtures shall be in accordance with 401.05. An MAF in460
accordance with 402.05 will not apply. Mixtures will be accepted in accordance with
402.09. Each course shall be compacted by mechanical equipment in accordance with
409.03(d)
The pavement replacement areas in Portland Cement Concrete pavements shall
be filled with PCCP in accordance with 502 except utilization of the Department
provided spreadsheet is not required for the CMDS.
715.12
744
Partial loads of HMA or PCCP left over from structure installation processes shall
not be incorporated into other work.470
715.13Method of Measurement
The accepted quantities of circular pipe, deformed pipe, slotted drain pipe, slotted
vane drain pipe, end bent drain pipe, sanitary sewer pipe, and pipe extensions will be
measured by the linear foot, complete in place.
The length of pipe to be measured for payment will be based on the net length of
pipe used, which will be obtained by multiplying the nominal length of each pipe
section by the number of sections used. If the pipe connects to manholes, inlets, or
catch basins, the terminal sections will be field measured to the outside face of the480
structure. The length of beveled or skewed terminal sections of circular corrugated or
ribbed metal pipe to be measured for payment will be the average of the top and bottom
centerline lengths for beveled ends or of the sides for skewed ends. Measurement of
deformed pipe will be made along the bottom centerline of the pipe.
Where used other than as a roadway drain extension pipe or as a bridge deck drain
system, cast iron soil pipe will be measured by the pound based on the theoretical
weight shown on the plans.
Roadway drain extension pipe will be measured per each drain extended.490
Pipe used as drainage pipe through concrete masonry or pipe used for bridge deck
drainage system will not be measured for payment.
Reinforcing bars, straps, and hook bolts used in anchors will not be measured for
payment. Concrete used for backfill of slotted drain pipe and slotted vane drain pipe
will not be measured for payment.
Excavation above the trench bottom elevation shown on the plans will not be
measured for payment. Additional excavation below the proposed trench bottom500
elevation required to install the pipe at a lower elevation or to remove rock or
unsuitable material will be measured in accordance with 203.27(b).
Pipe end sections, concrete anchors, and safety metal end sections will be
measured by the number of units of each size installed. The size of the end section,
concrete anchor, and safety metal end section will be considered as the nominal
diameter of the pipe to which they are attached. A concrete anchor attached at one end
of twin pipes will be measured as two concrete anchors. A concrete anchor attached at
one end of triple pipes will be measured as three concrete anchors.
510
Tee, stub-tee, and wye branch connections will be measured along the centerline
of the barrel. An additional 5 lft of the smaller diameter pipe will be included for
making such connection.
715.13
745
Elbow connections will be measured along the centerline of such connection. An
additional 2 lft of pipe of the same diameter as that of the elbow will be included for
each such connection.
If increaser or reducer connections are made, measurement will be made on the
basis of the larger diameter pipe for the full length of the section forming such520
connections.
Structure backfill will be measured in accordance with 211.09. Flowable backfill
will be measured in accordance with 213.08.
Pavement replacement and subbase necessary due to structure placement under
an existing pavement will be measured to the neat lines shown on the plans.
For structures for which the plans show pipes of differing sizes for either smooth,
semi-smooth or corrugated interiors, and either the semi-smooth corrugated interior530
alternate is installed, measurement of structure backfill or flowable backfill will be
based on the neat line dimensions shown on the plans for the smooth interior alternate.
Grated box end sections will be measured per each for the specified type, surface
slope, and pipe size.
Video inspection for pipe will be measured by the linear foot as determined by
the electronic equipment.
Geotextile used for backfill material will not be measured for payment.540
715.14Basis of Payment
The accepted quantities of pipe and pipe extensions will be paid for at the contract
unit price per linear foot for pipe of the type, shape, and size specified, complete in
place. Where used other than as a roadway drain casting extension pipe or as a bridge
deck drain system, cast iron soil pipe will be paid for at the contract unit price per
pound for the diameter specified.
Pipe end sections, concrete anchors, and safety metal end sections will be paid for
at the contract unit price per each for the size specified, complete in place. A concrete550
anchor attached at one end of twin pipes will be paid for as two concrete anchors. A
concrete anchor attached at one end of triple pipes will be paid for as three concrete
anchors.
Roadway drain casting extension pipe will be paid for at the contract unit price
per each.
Pavement replacement necessary due to structure installation under an existing
pavement will be paid for at the contract unit price per ton of HMA for structure
installation of the type specified and per square yard for PCCP for structure560
715.14
746
installation. Subbase will be paid for in accordance with 302.09.
Structure backfill will be paid for in accordance with 211.10. Where used as a
substitute for structure backfill, flowable backfill will be paid for as structure backfill.
When specified for pipe backfill, flowable backfill will be paid for in accordance with
213.09
If a pipe structure is lowered, relocated, or if unsuitable material is encountered
so that additional excavation is necessary over and above that shown on the plans at
the original location, such additional excavation will be paid for at three times the570
contract unit price for the class of excavation involved. If the contract does not include
rock excavation or unclassified excavation, rock removal below the proposed trench
bottom elevation will be paid for at three times the contract unit cost for common
excavation. However, in each of the above cases, such excavation will not be paid for
if the additional amount involved at such structure is 10 cu yds or less.
For structures for which the plans show pipes of differing sizes for smooth, semi-
smooth or corrugated interiors, and either the semi-smooth or the corrugated interior
alternate is installed, payment for pipe backfill will be made based on the neat line
dimensions shown on the plans for the smooth interior alternate.580
Grated box end sections will be paid for at the contract unit price per each for the
specified type, surface slope, and pipe size.
Video inspections for pipe will be paid for at the contract unit price per linear foot
completed.
Payment will be made under:
Pay Item Pay Unit Symbol590
Concrete Anchor, ________ in.................................................. EACH
diameter
Concrete Anchor, Min. Area ____ sq ft .................................... EACH
Grated Box End Section, ____, ____, ________ in. ................. EACH
type slope diameter
Grated Box End Section, ____, ____, Min. Area ____ sq ft ..... EACH
type slope
HMA for Structure Installation, Type ............................ TON
mixture type600
PCCP for Structure Installation ................................................. SYS
Pipe End Section, ________ in.................................................. EACH
diameter
Pipe End Section, Min. Area ____ sq ft .................................... EACH
Pipe Extension, Circular, ________ in., ________ ................... LFT
diameter material
715.14
747
Pipe Extension, Deformed, Min. Area ____ sq ft, ________ .... LFT
material
Pipe, Bridge Deck Drain System ............................................... LS
Pipe, Drainage through Concrete Masonry ............................... LS610
Pipe, End Bent Drain, ________ in. .......................................... LFT
diameter
Pipe, Relaid, ____ in. x ____ in. ............................................... LFT
span rise
Pipe, Relaid, ________ in. ........................................................ LFT
diameter
Pipe, Roadway Drain Casting Extension ................................... EACH
Pipe, Sanitary Sewer, ________ in. ........................................... LFT
diameter
Pipe, Slotted Drain, ________ in., ________ in........................ LFT620
diameter thickness
Pipe, Slotted Vane Drain, ________ in. .................................... LFT
diameter
Pipe, Type ____, Circular, ________ in. ................................... LFT
diameter
Pipe, Type ____, Deformed, Min. Area ____ sq ft ................... LFT
Pipe, Underdrain Outlet, ________ in. ...................................... LFT
diameter
Safety Metal End Section, ____, ________ in. ......................... EACH
slope diameter630
Safety Metal End Section, ____, Min. Area ____ sq ft ............. EACH
slope
Soil Pipe, Cast Iron, _______ in. ............................................... LBS
diameter
Video Inspection for Pipe .......................................................... LFT
The cost of reinforcing bars, straps, and hook bolts used in anchors shall be
included in the cost of the concrete anchor.
The cost of the toe plate anchor and galvanized bolts required for pipe end sections640
and safety metal end sections shall be included in the cost of the pay items.
The cost of pipe support brackets and all hardware used to attach the roadway
drain casting extension pipe to the drain casting and the pipe support bracket to the
structural member and to the drain extension pipe shall be included in the cost of the
pay items.
The cost of the pipe, all necessary fittings, all mounting hardware, design costs,
and all other costs to provide the bridge deck drain system shown on the plans shall be
included in the lump sum cost of the bridge deck drain system.650
715.14
748
The cost of concrete backfill for slotted drain pipe and slotted vane drain pipe
shall be included in the cost of the pay items.
B borrow obtained from planned excavation may be used to backfill culverts. No
deduction will be made from the excavation or borrow quantities.
If existing concrete building foundations, concrete walls, concrete columns, or
concrete steps not visible and not shown on the plans are encountered within the limits
of the trench, the removal of such items, as required, will be paid for in accordance660
with 203.28.
The cost of sawing of pavement, excavation above the trench bottom elevation
shown on plans, backfilling with material other than structure backfill or flowable
backfill, dewatering, shoring, timber mats, class A concrete required for collar
construction or sealing existing pipe, joint materials, replacing pipe which is damaged
during installation or re-laying operations, sanitary sewer testing required by the local
utility, and all other necessary incidentals shall be included in the cost of the pay items
in this section.
670
The cost of removal of pavement, existing pipe, end sections, anchors, or
headwalls, concrete collars, encasements, and the disposal of surplus materials shall
be included in the cost of the pay items.
The cost of concrete, grating, pipe tubing, reinforcing bars, aggregate leveling
bed, hardware cloth, and necessary incidentals, for construction of grated box end
sections will be included in the cost of the grated box end section.
Geotextile required to be placed on top of the structure backfill material will not
be paid for separately. The cost of the geotextile shall be included in the cost of the680
structure backfill.
The cost of providing video inspection equipment, technician, and a copy of the
video inspection shall be included in the cost of video inspection for pipe.
No additional payment will be made for repair, remediation, or replacement of
pipes, backfill, video inspection of the repaired, remediated, or replaced pipe, and all
other work associated with the repair, remediation, or replacement of unacceptable
pipes.
690
The cost of mandrel testing shall be included in the cost of the pipe.
715.14