205.01Description
This work shall consist of furnishing, installing, inspecting, maintaining, and removing BMPs in accordance with 105. 03, the Department’s Design SWP3, the submitted and accepted SWQCP or an approved written site plan developed by the Contractor.
MATERIALS
205.02Materials
Materials shall be in acco rdance with the following:
Coarse Aggregate, Class F or Higher .......................... 904.03 Fertilizer ...................................................................... 914.03 Filter Sock ................................................................... 914.09(h) Geotextile .................................................................... 918.02 Grass Seed, Temporary ............................................... 914.02 205.01
Manufactured Surface Protection Products ................. 205.04(c) Metal End S ections ...................................................... 908.06 20 Mulch .......................................................................... 914.05(a) Pipe Drains .................................................................. 715.02(d) Plastic Net.................................................................... 914.09(g) Revetment Riprap ........................................................ 904.04* Stakes .......................................................................... 914.09(b) Staples ......................................................................... 914.09(f) Top Soil ....................................................................... 914.01 Water ........................................................................... 914.09(a)
* The minimum depth does not apply.
CONSTRUCTION REQUIREMENTS
205.03General Requirements
For contracts with a Construction St ormwater General Permit, CSGP, a SWQCP shall be developed and submitted to the Engineer for review.
The Contractor shall furnish, install, inspect, maintain, and remove BMPs for land-disturbing activity areas, and develop an SWQCP in accordance with the CSGP. The Contractor’s SWQCP shall be a required contract specific component to the Department’s Design SWP3. The submitted and accepted Contractor’s SWQCP shall 40 interrelate with the Department’s Design SWP3 in order to satisfy the requirements of the CSGP.
The Contractor’s SWQCP shall be developed by a professional engineer who holds a current CPESC certification or approved equivalent. The SWQCP developer shall be familiar with the project site and be able to develop the SWQCP in accordance with the site conditions. In the event of conflict between requirements, pollution control laws, rules, or regulations of other Federal, State or local agencies, the Contractor’s SWQCP shall adhere to the more restrictive laws, rules, or regulations. 50 The SWQCP developer shall issue clarifications, correct errors and omissions, and revise the SWQCP as required. The Contra ctor’s SWQCP shall be signed and sealed by the SWQCP developer, as defined above.
The Contractor shall develop the SW QCP in accordance w ith the CSGP, the IDEM “Indiana Storm Water Quality Manua l”, ITM 803, and all other applicable contract documents.
The Contractor’s SWQCP shall include the processes and procedures of how the 60 Contractor intends to meet the requirements outlined in this section and in accordance with ITM 803.
The Contractor may elect to prepare and submit the SWQCP in multiple phases. The first phase shall show the location, installation, and maintenance of BMPs for the 205.03
existing topography of the project and identify the total number of proposed construction phases for the contract. Additional phases shall be submitted for review prior to land-disturbing activities for those phases and shall show the progression from the existing topography to final grade. Each phase of the SWQCP shall be modified to meet existing field conditions as needed. 70
Any individual phase of the SWQCP shall be submitted to the Engineer for review a minimum of 14 calendar days prior to commencing land-disturbing activities for that phase. Upon receipt, the Engineer will perform a review of the submitted phase of the SWQCP within 14 calendar days for acceptance.
Based on changes in scope, in accordance with 104.02 and 104.03, the Engineer may request a cost breakdown of the stormwater management implementation item.
The Contractor’s SWQCP shall incorporate all narrative information, plan sheets, 80 and implementation information necessary for stormwater management utilized for the project. The SWQCP shall include any revisions to the Department’s Design SWP3 and the plans. The revisions shall comply with all known permit requirements applicable to the construction phase of the project including waterway permits, or a CSGP, and those required by the Contractor in accordance with 107.01 and 205.03(c).
Electronic files of any plan sheets and narratives included as part of the SWQCP submittal shall be provided in PDF format.
On projects requiring an SWQCP, an updated field copy of the SWQCP will be 90 retained in the office of th e Engineer or at a mutually agreed upon location. Any accepted revisions shall be annotated in the field copy of the SWQCP and initialed and dated by the SWQM and the Engineer.
A copy of the Contractor’s offsite operations permits for items such as offsite stockpiles, borrow sites, waste sites, or storage areas shall be submitted to the Engineer prior to any land-disturbing activities at those sites.
Revisions to the SWQCP shall be submitted and signed and sealed by the SWQCP developer, for items that are hydraulically sized or calculated such as sediment basins 100 or other similar measures. The SWQM may submit revisions for items that are not hydraulically sized or calculated. Adjustments to the BMPs shall be subject to the Engineer’s acceptance.
If a governmental agency or a local governmental authority finds a violation of NPDES or other surface waterway permits provided in the contract documents, if any BMPs are incomplete, or the Contractor’s SWQCP is incomplete, full responsibility shall be borne by the Contractor to make the necessary corrections. In addition, if an assessment, damage judgment or finding, agreed order, fine, or any other expense for a violation of the contract requirements is leveled against the Department, the 110 Contractor shall reimburse the State for that amount within 30 days. The Contractor 205.03
agrees to indemnify and hold harmless the Department and will reimburse the Department for any assessments, damage judgments or finding, fine, penalty, or other expense relating to this portion of the contract. The Department may withhold the amount owed from the Contractor’s subsequent pay estimates. Delays caused by stop work orders from regulatory agencies, suspension of work orders from the Department, or any other delays caused by inadequate submittals or implementation will be considered Non-Excusable Delays in accordance with 108.08(c).
On contracts with a CSGP or waterway permits, the Contractor shall designate one person as the contract SWQM. The name of the SWQM shall be furnished to the Engineer at, or prior to, the pre-construction conference. If the designated individual is replaced during the contract, the replacem ent shall be designated, and notification given to the Engineer within 24 h.
On contracts requiring waterway permits and not requiring a CSGP, the individual shall have successfully completed the Department’s Constr uction Stormwater Training course and hold a current training verification document for that course. 130
On contracts requiring a CSGP, the individual shall have successfully completed the Department's Construction Stormwater Training course and hold a current certification as a CESSWI, or a CISEC, or a CPESC, or an approved equivalent.
The SWQM shall hold the pre-disturbance meeting, in accordance with 205.03(d). The SWQM shall attend at least one meeting with the Contractor, relevant Subcontractors, and the Engineer per calendar month in any month in which weekly 140 and post-event inspections are being completed and work is ongoing. The requirement to attend these meetings may be waived entirely or in part upon written approval from the Engineer.
The SWQM shall be responsible for ensuring that the Contractor’s SWQCP has been submitted for review prior to implementation. Implementation of stormwater features shall include installation, inspection, maintenance, and removal of all BMPs. The SWQM shall also be in responsible charge of inspecting the implementation of the Contractor’s SWQCP or the contract site plan. The SWQM shall be in responsible charge of the weekly and post-event inspections. Anyone performing inspections 150 under the responsible charge of the SWQM shall, at a minimum, meet the training requirements of a Waterways SWQM.
The SWQM shall accompany personnel fr om IDEM or othe r regulatory or governmental agencies during site visits by those agencies.
205.03
On contracts requiring an SWQCP, a pre-disturbance meeting shall be held on- site prior to beginning land-disturbing activities. The meeting invitees shall include the SWQM, the Contractor, the SWQCP Deve loper, appropriate Department field 160 staff, the District Stormwater Specialist, and all relevant subcontractors for the work being performed. The pre-disturbance meeti ng shall be held not more than 30 days prior to the start of land-disturbing activities. The following shall be reviewed:
phasing and sequencing.
If requested in writing, pre-disturbanc e meeting requirements may be waived in part or in full subject to the approval by the Engineer. No land-disturbing activity shall begin until this meeting has occurred or until written approval to waive the meeting has been received.
Incoming and outgoing drainage areas impacting a work location shall have 180 temporary BMPs installed as soon as practicable and prior to land-disturbing activities at those locations. Pipe end sections and anchors shall be installed when the structure is installed. If the pipe end sections or anchors cannot be placed at the same time, temporary riprap splashpads shall be placed at the outlets of the pipes until end sections or anchors can be installed.
Adjustments of the BMPs shall be made to satisfy field conditions and shall be subject to the Engineer’s approval. Adjustments made to meet field conditions shall be made as soon as practicable, shall be ma intained as necessary, and shall be noted in the SWQCP. 190
The Contractor shall provide a stable construction entrance at the points where construction traffic will enter onto an existing road. Where there is insufficient space for a stable construction entrance, other measures shall be taken to prevent the tracking of sediment onto the pavement. These temporary entrances shall be the responsibility of the Contractor to completely install, inspect, maintain, and remove.
A copy of the current manufacturer’s installation and maintenance recommendations shall be provided prior to installation of manufactured BMPs. Shipping, handling, storage, and installation of manufactured BMPs shall be in 200 accordance with the manufacturers’ recommendations or as directed. In the event of conflict between the Department’s sp ecifications and the manufacturer’s
205.03
199
recommendations, the Contractor shall adhere to the more restrictive regulation or as
directed.
Within the SWQCP, the Contractor shall provide a written plan for the collection,
storage, and disposal of concrete wastewater that is adequate for the size of the
concrete pour, the environmental conditions of the job site, and in accordance with
CSGP 3.3(a). An emergency concrete washout container shall be available, be part of
the material handling and spill prevention plan, and available on-site during concrete210
pours. Straw bale washout pits will not be allowed. Concrete washout wastewater may
either be recycled back into the truck, washed out into an adequately sized and lined
roll off container or lined in-ground pit, an approved manufactured product, or taken
back to the batch plant. Lining shall consist of a minimum of one sheet of 10 mil
plastic, be continuous with no over lapping, and shall be free of leaks.
Concrete washout capacity shall not be exceeded. Concrete wastewater shall not
be allowed to leak onto the ground, run into storm drains, or into any body of water.
Where concrete wastewater leaks onto the ground, all contaminated soils shall be
excavated and disposed of in accordance with 202, except that all costs associated with220
excavation and disposal shall be the responsibility of the Contractor.
The installation of BMPs shall include those necessary or required by permits at
off-site locations such as borrow and disposal areas, field office sites, batch plants,
locations where the Contractor’s vehicles enter and leave public roads, and other
locations where work pertaining to the contract is occurring. The Contractor’s SWQM
shall be responsible for the installation, inspection, maintenance, and removal of these
measures.
The Contractor shall employ dust control measures in accordance with 107.08(b).230
On contracts requiring a CSGP, directions to the updated field copy of the
SWQCP, a copy of the NOI, and a copy of the NOS shall be posted and maintained so
they are legible and visible at an agreed upon and publicly accessible location for the
contract. In lieu of posting the NOI and NOS, a copy of the Construction Stormwater
Posting Project Information form, CSPPI, shall also meet the posting requirements.
On contracts requiring waterway permits the Contractor shall follow the posting
requirements of those permits.
240
Inspection shall be required on all work areas associated with a CSGP. This shall
include drainage areas within contract limits leading to BMPs, areas of land-
disturbance, and areas with impacts or potential impacts to protected resources. For
contracts that have multiple work sites, inspections shall only be required for areas
operating under a CSGP or a waterway permit.
205.03
200
On contracts requiring a CSGP inspections shall be performed at a minimum of
once per calendar week, 24 hours prior to a qualifying rain event, or by the end of the
next work day following every 1/2 in. or greater rain event. Rainfall shall be recorded250
using an on-site rain gauge and a log documenting rainfall total or a weather station
representative of the project location and as approved by the Engineer. For specific
areas of the project which are permanently stabilized with vegetative cover at 70%
density and no active erosion is present, inspections for that area can be reduced to
once per month if approved by the Engineer in writing. A single inspection performed
after a rain event shall satisfy the requirement for both the rain event and the weekly
inspection. No more than three inspections shall be required in a calendar week.
Inspections for these contracts shall stop once all disturbed areas are permanently
stabilized, all temporary measures have been removed, and the NOT has been
obtained.260
Inspection reports for CSGP contracts shall be submitted by the SWQM within
24 h of the day of the inspection. The inspection reports for CSGP contracts shall be
documented and submitted electronically using the current version of the
Department’s stormwater inspection management report which is available on the
Department’s website. A paper inspection form shall only be used in the event that the
electronic inspection form is out of service or as directed. Inspections shall begin when
the installation of BMPs start, when land disturbing activities begin, or if potential
impacts to protected resources will occur, whichever is earliest.
270
Permanent BMPs shall be incorporated into the work at the earliest practicable
time.
205.04Temporary Surface Stabilization
Non-vegetated areas shall be temporarily stabilized if the area remains inactive
for more than seven days. The area will be considered inactive when no meaningful
work toward accomplishing a pay item has been performed at a site of land-disturbing
activity. Stabilization methods shall be in accordance with the SWQCP, or as directed.
280
Temporary seeding shall be placed on disturbed areas that are expected to be
inactive for more than seven days, or as agreed to by the Contractor and the Engineer.
Seed shall be placed either by drilling in, spraying in a water mixture, or by use of a
mechanical method which places the seed in direct contact with the soil. Where
inaccessible to mechanical equipment, or where the area to be seeded is small, a hand
operated cyclone seeder or other approved equipment may be used. Seed shall not be
covered more than 1/2 in. Seed shall be distributed utilizing approved methods which
allow for even distribution of the seed. If as a result of a rain event, the prepared seed
bed becomes rutted, crusted or eroded, or depressions exist, the soil shall be reworked290
until it is smooth. Reworked areas shall be re-seeded. All seeded areas shall be
mulched within 24 h after seeding.
205.04
201
Temporary seed shall be used for surface stabilization and temporary ground
cover. Temporary cover mixtures shall be placed and be subject to seasonal limitations
as defined herein. This mixture is not intended to be used as a permanent seed mixture.
This mixture shall not be used to satisfy the requirements of the warranty bond. The
mix shall be spray mulched where the slope is steeper than 3:1. From June 16 through
August 31, mulching alone shall be used to stabilize the soil.
300
Spring mix shall be used from January 1 through June 15. This mixture shall be
applied at the rate of 150 lb/ac. The mix shall consist of oats.
Fall mix shall be used from September 1 through December 31. This mixture shall
be applied at the rate of 150 lb/ac. This mix shall consist of winter wheat.
Unless otherwise specified in the SWQCP or the contract site plan, fertilizer shall
be spread uniformly over the area to be seeded and shall be applied at 1/2 the rate310
shown in 621.05(a). Fertilizer shall only be applied during the active growing season
March through November.
Mulch shall be applied uniformly in a continuous blanket at the rate of 2.5 t/ac. If
areas are seeded, mulch shall be placed within 24 h after seeding. The percent of
moisture in the mulch shall be determined in accordance with 621.14(c). Mulch shall
be placed in accordance with one of the following types or as directed.
On a slope flatter than 3:1, or where specified, Type A shall be used. On a slope320
of 3:1 or steeper but flatter than 2:1, or where specified, Type B or Type C may be
used. On a slope of 2:1 or steeper, or where specified, a manufactured surface
protection product, in accordance with 205.04(c), shall be used.
Mulch shall be punched into the soil so that it is partially covered. The punching
operation shall be performed parallel to the contour of the slope. The tools used for
punching purposes shall be disks that are notched and have a minimum diameter of 16
in. The disks shall be flat or uncupped. Disks shall be placed a minimum of 8 in. apart.
Shaft or axle sections of disks shall not exceed 8 ft in length.330
The disk for punching shall be constructed so that weight may be added or
hydraulic force may be used to push puncher into the ground. An even distribution of
mulch shall be incorporated into the soil.
The mulch shall be held in place by means of commercially produced water borne
mulch binder product. The product shall be manufactured and used in accordance with
all applicable State and Federal regulations and shall be applied in accordance with
205.04
202
the manufacturer’s written instructions. A copy of the written instructions shall be340
supplied to the Engineer prior to the seeding work. The product shall include a
coverage indicator to facilitate visual inspection for evenness of application. If the
mulch fails to stay in place, the Contractor shall repair all damaged areas.
The mulch shall be held in place with a polymeric plastic net. The plastic net shall
be unrolled such that it lays out flat, evenly, and smoothly, without stretching the
material. The plastic net shall be held in place by means of staples. The staples shall
be driven at a 90° angle to the plane of the soil slope. Staples shall be spaced not more
than 4 ft apart with rows alternately spaced. The plastic net shall be secured along the350
top and bottom of the soil slope with staples spaced not more than 1 ft on center. The
ends and edges of the plastic net shall be overlapped approximately 4 in. and stapled.
Overlaps running parallel to the slope shall be stapled 1 ft on center and overlaps
running perpendicular to the slope shall be stapled at least 3 ft on center. The plastic
net shall be placed with the length running from top of slope to toe of slope, or the
plastic net shall be placed with the length running horizontally or parallel to the
contour.
Prior to placing a manufactured surface protection product, the area to be covered360
shall be free of all rocks or clods of over 1 1/2 in. in diameter, and all sticks or other
foreign material, which prevent the close contact of the blanket with the seed bed.
After the area has been properly shaped, fertilized, and seeded, the manufactured
surface protection product shall be laid out flat, evenly, and smoothly, without
stretching the material.
Manufactured surface protection products may be used for covering an area that
has not been seeded. Geotextile soil cover shall not be used to cover seeded areas.
370
An excelsior blanket may be used as mulch for seeding where seeding is specified
or where erosion control blanket is specified. Excelsior blankets shall be placed within
24 h after seeding operations have been completed. Excelsior blankets shall be
installed in accordance with the manufacturer’s recommendations.
A straw blanket may be used as mulch for seeding where mulched seeding is
specified or where erosion control blanket is specified. Straw blankets shall be placed
within 24 h after seeding. The straw blanket shall be unrolled over the designated area380
so that the plastic mesh is on top and the straw fibers are snugly and uniformly in
contact with the soil surface. The rolls shall be butted together and stapled in place.
The staples shall be driven through the blanket at a 90° angle to the plane of the ground
surface. Each staple shall anchor the plastic mesh. The staples shall be spaced in
accordance with the manufacturer’s recommendations.
205.04
203
For placement on a slope, the straw blankets shall be placed with the length
running from the top of slope to the toe of slope and shall extend a minimum of 3 ft
over the crown of the slope. The blanket shall be stapled in accordance with the
manufacturer’s recommendations.390
For placement in ditch lines, the straw blanket shall be unrolled parallel to the
centerline of the ditch. The blanket shall be placed so that there are no longitudinal
seams within 24 in. of the bottom centerline of the ditch. In a ditch line, the blanket
shall be stapled in accordance with the manufacturer’s recommendations with a
minimum of six staples across the upstream end of each roll.
The Contractor shall use degradable RECPs including netting, open weave textile,
and erosion control blankets.400
Seed shall be applied in accordance with 621 unless soil infilling is required.
If soil infilling is required, RECP shall be first installed and then seed applied and
brushed or raked 1/4 to 3/4 in. of topsoil into voids in the RECP filling the full product
thickness. Staples of at least 6 in. in length shall be used to secure the RECP. The
RECP shall be unrolled parallel to the primary direction of flow and placed in direct
contact with the soil surface. The RECP shall not bridge over surface inconsistencies.
Edges of adjacent RECP shall be overlapped by 2 to 4 in. Staples shall be placed to
prevent seam separation in accordance with the manufacturer’s recommendations.410
Disturbed soil shall be covered with geotextile. The covering shall be placed over
the exposed soil in a shingle like fashion with a 2 ft minimum overlap covering all
loose or disturbed soil. The geotextile, if new, shall be in accordance with 918.02. The
geotextile used for soil covering need not be new but shall not have holes or unrepaired
rips or tears. All repairs shall be made in accordance with the manufacturer’s
recommendation.
205.05Concentrated Flow Protection420
Check dams and modified check dams shall be constructed as shown on the plans.
Geotextile for check dams shall be in accordance with 616 unless otherwise specified.
Temporary revetment riprap shall be in accordance with 616. No. 5 and No. 8 filter
stone shall be in accordance with 904.
Traversable check dams shall be composed of 8 in. minimum diameter socks filled
with straw, ground wood chips, shredded bark, or other approved material for site430
specific conditions. Rolls and socks may be stacked in a triangle pattern as shown on
205.05
204
the plans. Check dams shall be staked as shown on the plans or as specified by the
manufacturer.
Grading for diversion interceptors shall be in accordance with 203 with the
exception that compaction requirements will not apply. The Contractor shall identify
the construction areas which shall utilize diversion Type A or Type B. Slope drains
shall be provided at the low points of the diversion interceptor. Perimeter diversion,
Type C shall be installed prior to earth moving activities and shall be immediately440
stabilized. Type A or Type B shall be stabilized if anticipated to be left in place for
more than seven calendar days.
Sediment traps shall be constructed with revetment riprap, filter stone and
geotextile.
Embankment construction shall be in accordance with 203. Temporary revetment
riprap used for overflow protection shall be in accordance with 904, unless otherwise450
specified in the SWQCP. Sediment basins shall be constructed as shown on the plans,
or as specified in the SWQCP. Sediment basins shall be designed to provide a
minimum storage volume to contain the runoff from a 10 year 24 h storm event. When
required, water shall be withdrawn from the top of the water column. Basin slopes
shall be stabilized upon achieving design grades. Outfalls shall be stabilized within 24
h of installation of the basin outlet.
Slope drain pipes shall be lengthened as required due to the construction of the
embankment.460
Designated vegetative filter strips shall not be disturbed. Rills that form shall be
repaired. Fertilizer shall be applied as specified in the SWQCP.
Splashpads shall be constructed using revetment riprap on geotextile, or other
approved material for site specific conditions and shall be sized to prevent erosion or
scour.
470
All inlets shall have sediment control measures installed when the drainage area
contributing to the inlet is affected by land-disturbing activity, adjacent to hauling
operations, adjacent to disturbed areas, or as directed. A copy of the current
manufacturer’s installation and maintenance recommendations shall be provided prior
to installation of manufactured inlet protection in accordance with 205.03(e). All inlet
205.05
205
protection devices shall provide a means of emergency overflow. Geotextile wrapped
under or over a grate shall not be used.
205.06Perimeter and Resource Protection480
Shipping, handling and storage shall be in accordance with the manufacturer’s
recommendations. Silt fence material shall be in accordance with 918.02(d). The silt
fence material will be rejected if it has defects, tears, punctures, flaws, deterioration,
or damage incurred during manufacture, transportation, storage, or installation. Each
roll shall be labeled or tagged to provide product identification.
Joints shall be made from the ends of each section of fence wrapped around a
wood stake and joined together or other method recommended by the manufacturer.490
Copies of all current manufacturer manuals shall be provided prior to installation. Silt
fence shall not be used in conveyance channels, areas prone to flooding, or areas of
concentrated flow.
Filter sock shall be designed for filtration or diversion depending on its intended
use. Filter sock shall be installed, secured and overlapped in accordance with the
standard drawings. The manufacturer’s specifications for installation may be
substituted with the approval by the Engineer. Filter sock shall be in accordance with
914.09(h).500
Filter berms shall be constructed of filter sock, or a combination of riprap or No.
5 and No. 8 filter stone.
Protected resource fence shall be a commercially available material marketed as
snow fencing, have a minimum height of 4 ft and be made of high density
polyethylene. All protected resource fence shall be orange in color. Protected resource
fence shall be installed using T-posts spaced no more than 10 ft apart and secured with510
plastic fence ties. Pull posts and corner posts will not be required. T-posts shall be
buried to 1/3 of their height.
Within areas prone to flooding, or concentrated flow “Do Not Disturb” signs in
accordance with 622.20 may be accepted in lieu of fencing, if requested and accepted
in writing prior to installation. If “Do Not Disturb” signs are used in lieu of fencing,
they shall be spaced at a distance of 25 ft apart to delineate the entire length of concern.
At a minimum, two signs shall be used.
520
205.07Maintenance
BMPs shall be inspected in accordance with 205.03(g). If conditions do not allow
205.07
206
the Contractor access to the location of the BMPs using normal equipment and
maintenance, the Contractor may submit to the Engineer an acceptable written
alternate schedule, within 48 h, to bring the BMPs back into compliance.
Accumulated sediment shall be removed once it reaches 1/2 of the height of the
filter sock when used for perimeter protection and 1/3 the height when used for inlet
protection. The filter sock shall be inspected to ensure that it is holding its shape and530
allowing adequate flow. Eroded and damaged areas shall be repaired.
If the fence fabric tears, starts to decompose, or becomes ineffective, the affected
portion shall be replaced. Deposited sediment shall be removed once it reaches 1/3 the
height of the fence at its lowest point. Once the contributing drainage area has been
stabilized, the Contractor shall remove the fence and sediment deposits, grade the site
to blend with the surrounding area, and stabilize the graded area.
Accumulated sediment shall be removed once it reaches 1/4 of the height of the
filter berm. The filter berm shall be inspected to ensure that it is holding its shape and
allowing adequate flow. Eroded and damaged areas shall be repaired.
Accumulated sediment shall be removed once identified and after each storm
event. Flushing with water will not be allowed. The sediment shall not be allowed to
re-enter the paved area or storm drains. Manufactured inlet protection shall be
maintained in accordance with the manufacturer’s recommendations.
550
Sediment shall be removed once it reaches 1/2 the height of the check dam.
Sediment shall be removed and disposed of in accordance with 201.03 and 203.08.
The Contractor shall rebuild or repair each damaged check dam to maintain the design
height, cross-section, and control function.
Following each rain event, the Contractor shall repair slope erosion and piping
holes as required. Sediment shall be removed once it has accumulated to 1/2 design
volume. The Contractor shall replace the coarse aggregate filter stone if the sediment560
pool does not drain within 72 h following a rain event.
Sediment shall be removed once it has accumulated to 1/2 the design volume. The
filter stone around the riser pipe shall be replaced if the sediment pool does not drain
within 72 h following a rain event.
205.07
207
The containment system shall be inspected for leaks, spills, and tears, and shall
be repaired or replaced as necessary. The Contractor shall ensure that each570
containment system maintains adequate capacity and has the appropriate lining.
Solidified waste concrete shall be disposed of in accordance with 202.
Protected resource fence shall be maintained in an upright position with no tears
or missing sections.
Protected resource signs and posts shall be maintained in an upright and legible
condition.580
Sediment shall not be allowed to be discharged or tracked onto roadways that are
open to traffic. If sedimentation has occurred on a roadway open to traffic, the debris
shall be removed immediately, or as directed, in a manner that is in accordance with
all applicable statutes and regulations. Clearing of sediment shall not include the
utilization of mechanical methods that will result in mobilization of dust off the project
site or flushing the area with water unless the flushed water is directed to an
appropriate sediment control measure. Cleared sediment shall be redistributed or
disposed of in a manner that is in accordance with all applicable statutes and590
regulations.
205.08Stormwater Deficiencies
Immediate deficiencies include:
contract stormwater and waterway permits and regulations.
600
acceptance of a submitted SWQCP or prior to the pre-
disturbance meeting, if not waived by written permission.
resource.
CSGP.
610
Corrective actions for immediate deficiencies shall be completed as directed by
the Engineer or no later than 24 h after notification, including weekends or holidays.
205.08
208
BMP deficiencies include:
plans or the accepted SWQCP.
Corrective actions for BMP deficiencies shall be completed within 48 h of
notification or as directed. Corrective action for failure to a hold a pre-disturbance
meeting shall consist of holding the meeting on-site after earth disturbing activities
have begun or BMPs have been installed.
For unresolved deficiencies, the Engineer may suspend work on the contract
except for that work necessary to correct the deficiencies, for traffic maintenance, and
for the protection of life and property until the deficiencies are corrected. Delays
caused by these deficiencies will be considered non-excusable delays in accordance630
with 108.08(c).
If immediate deficiencies are not remedied within 24 h after written notification,
the Contractor may be assessed quality adjustments. If BMP deficiencies are not
remedied within 48 h after written notification, the Contractor may be assessed quality
adjustments. When an alternate schedule is accepted by the Engineer, in accordance
with 205.07, and that schedule is not met, the Contractor may be assessed quality
adjustments.
640
In accordance with 109.05.1(f), the Contractor may be assessed quality
adjustments of $200 for each BMP deficiency per calendar day, or part thereof, that
the deficiency remains uncorrected after the initial notification period. No BMP
deficiency quality adjustments will accrue without prior written notification from the
Engineer of the deficiency.
In accordance with 109.05.1(f), the Contractor may be assessed quality
adjustments of $200 for each immediate deficiency per calendar day, or part thereof,
that the deficiency remains uncorrected.
650
In accordance with 107.16 and 109.05.1(f), the Contractor will be assessed quality
adjustments of $500 for each illicit discharge.
Permit postings will be considered deficient and subject to quality adjustments if
they do not meet the requirements of the permitting agency or the requirements listed
in 205.03(f).
Each contiguous 100 ft section, or portion thereof, of silt fence will be considered
deficient and subject to quality adjustments if the fence material has a cut or tear
205.08
209
exceeding 1 ft in length, or a seam has separated, or the retained sediment exceeds 1/2660
of the height of the fence, or the fence is not installed as shown on the standard
drawings.
Each contiguous 50 ft section, or portion thereof, of filter sock will be considered
deficient and subject to quality adjustments if it is not installed and maintained in
accordance with the standard drawings and the manufacturer’s recommendations.
Each check dam, sediment basin, or sediment trap will be considered deficient
and subject to quality adjustments if stormwater circumvents the measure, or the
retained sediment exceeds 1/2 of the design volume, or they are not installed in670
accordance with the accepted SWQCP, as shown on the plans, or the contract site plan.
Inlet protection devices will be considered deficient and subject to quality
adjustments if stormwater circumvents the measure, or they are not installed and
maintained in accordance with the manufacturer’s recommendations, or they do not
provide a means of emergency overflow lower than the adjacent roadway, or the
accumulated sediment exceeds 1/2 of the capacity of the device.
Manufactured BMPs will be considered deficient and subject to quality
adjustments if stormwater circumvents the measure, or they are not installed and680
maintained in accordance with the manufacturer’s recommendations.
Other BMPs will be considered deficient and subject to quality adjustments if they
are not installed in accordance with the accepted SWQCP, as shown on the plans, the
contract site plan, or they are not maintained adequately to perform their intended
function.
For any specific deficiency, quality adjustments will cease accruing when that
specific deficiency is corrected. Site inspection quality adjustments will cease accruing
when the next acceptable inspection is performed.690
205.09Removal
BMPs shall be removed as soon as an area becomes stable. All BMPs shall be
removed prior to application for the NOT. The Contractor shall remove and dispose
of all excess silt accumulations, dress the area, and reestablish vegetation to all bare
areas in accordance with the contract requirements. Use or disposal of the BMPs shall
be as specified in the SWQCP.
205.10Method of Measurement
Temporary silt fence and traversable check dams will be measured by the linear700
foot.
Protected resource fence will be measured by the linear foot, installed and
removed. Measurement will be made along the top of the fence from outside to outside
of end posts for each continuous run of fence.
205.10
210
Protected resource signs, temporary sediment basins, standard metal end sections,
and temporary inlet protection will be measured by the number of complete units
installed.
710
Temporary revetment riprap check dams, temporary revetment riprap, temporary
sediment traps, splashpads, temporary filter stone, temporary mulch, No. 2 stone for
stable construction entrances, and fertilizer will be measured by the ton.
Temporary mulch stabilization, manufactured surface protection products, and
temporary geotextile will be measured by the square yard.
Temporary seeding will be measured by the pound.
Removal of sediment will be measured by the cubic yard.720
Temporary slope drains will be measured by the linear foot. Measurement will be
made for the maximum footage in place at one time, per drain location regardless of
the number of times the material is moved.
Temporary filter berms and filter sock will be measured by the linear foot
complete in place. Overlapping sections of filter sock will not be measured for
payment.
Revetment riprap and filter stone used in sediment basins will be measured by the730
ton.
Excavation for detention ponds, temporary sediment traps and temporary
sediment basins will be measured as common excavation in accordance with 203.27.
Diversion interceptors Type A and Type B, and interceptor ditches will not be
measured for payment. Diversion interceptors Type C will be measured by the linear
foot.
Mobilization and demobilization for surface stabilization will be measured by740
each trip as provided in the submitted and accepted SWQCP.
Weekly inspections will be measured by the number of specified weekly
inspections conducted after the contract completion date.
SWQCP preparation and stormwater management implementation will not be
measured for payment.
BMPs used at the off-site locations in accordance with 205.03 and concrete
washouts will not be measured for payment.750
205.10
211
205.11Basis of Payment
The accepted quantities of diversion interceptors Type C, protected resource
fence, silt fence, and traversable check dams will be paid for at the established unit
price per linear foot.
Protected resource signs, temporary sediment basins, standard metal end sections,
and temporary inlet protection will be paid for at the established unit price per each
unit installed.
760
Temporary revetment riprap check dams, temporary revetment riprap, temporary
sediment traps, splashpads, temporary filter stone, temporary mulch, No. 2 stone for
stable construction entrances, and fertilizer will be paid for at the established unit price
per ton.
Temporary mulch stabilization, manufactured surface protection products, and
temporary geotextile will be paid for at the established unit price per square yard.
Temporary seeding will be paid for at the established unit price per pound.
770
Removal of sediment will be paid for at the established unit price per cubic yard.
Temporary slope drains, temporary filter berms, and filter sock will be paid for at
the established unit price per linear foot. No additional payment will be made for any
required overlapping sections of filter sock.
Revetment riprap and filter stone used in sediment basins will be paid for at the
established unit price per ton.
The accepted quantities of excavation for detention ponds, temporary sediment780
traps, and temporary sediment basins will be paid for as common excavation in
accordance with 203.28.
Mobilization and demobilization for surface stabilization will be paid for at the
established unit price per each and will be made for the initial movement to the project
site, and for each occurrence as specified in the submitted and accepted SWQCP, or
as directed.
Weekly inspections will be paid for at the established unit price per each for
inspections conducted after the contract completion date. No payment will be made790
for inspections during the time when liquidated damages, in accordance 108.09, are
assessed.
The Department will include the pay item Stormwater Management Budget, with
an established dollar amount, in the proposal to pay for BMP work. This established
amount is the Department’s estimate of the total cost of the BMP work required to be
performed for the contract. The established amount shown in the proposal is included
205.11
212
in the total bid amount. The Department will pay for those items installed and listed
with established prices for the quantities installed as specified in the submitted and
accepted SWQCP. If the BMP work exceeds the Department’s estimated amount, the800
additional BMPs shall be explained and submitted as a revision to the SWQCP. The
additional work will be reviewed for acceptance in accordance with 104.03 except that
the additional BMP work will be paid for at the pre-determined established prices
shown.
The Department will pay to replace BMPs that have failed due to differing site
conditions or significant changes in the character of work in accordance with 104.02,
if those BMPs have been installed and maintained in accordance with the accepted
SWQCP, as shown on the plans, or the contract site plan.
810
The Department will pay to replace BMPs that have failed after exceeding the
lifespan of the BMP, as specified in the manufacturer’s guidelines, if those BMPs were
installed and maintained in accordance with the accepted SWQCP, as shown on the
plans, or the contract site plan. Payment will be at the established prices shown in
and may occur no more than once per year
The item SWQCP Preparation will be paid for based on the highest total number
of construction phases for the contract. The highest total number of phases will be
based on either the number of phases established within the original contract
documents or the number of phases proposed in the SWQCP. The initial submitted820
and accepted SWQCP shall list the number of construction phases. Payments on the
item will be made after a SWQCP phase has been reviewed and accepted. The payment
of the SWQCP Preparation lump sum item will be calculated as follows:
SWQCP payment = P sa /Pt
where:
Psa = Total number of submitted and accepted phases of the SWQCP.
Pt = Total number of construction phases established for the contract.830
After the contract site plan or the initial phase of the SWQCP has been submitted
and accepted, 25% of the Stormwater Management Implementation contract bid price
will be paid. The balance will be paid as the plan is implemented over the life of the
contract. Stormwater Management Implementation shall include any costs beyond the
established prices associated with the inspection, installation, maintenance, and
removal including mobilization and demobilization of all temporary BMPs.
Items shown with an established price will be paid for at the prices shown. If any
of the following items are shown in the schedule of pay items, the bid item and price840
will prevail over the established prices shown.
205.11
213
Payment will be made under:
Pay Item Pay Unit
Symbol
Price
Established
Diversion Interceptor Type C ............................... LFT ................. $27.00
Fertilizer ............................................................... TON ................ $800.00
Filter Sock ............................................................ LFT ................. $6.50
Manufactured Surface Protection Product ............ SYS ................. $1.75
Mobilization and Demobilization850
for Surface Stabilization.................................. EACH ............. $800.00
No. 2 Stone ........................................................... TON ................ $50.00
Protected Resource Fence..................................... LFT ................. $2.50
Protected Resource Sign ....................................... EACH ............. $96.00
Sediment, Remove................................................ CYS................. $26.50
Splashpad ............................................................. TON ................ $70.00
Standard Metal End Section ................................. EACH ............. $400.00
Stormwater Management Budget ......................... DOL
Stormwater Management Implementation ........... LS
SWQCP Preparation ............................................. LS860
Temporary Check Dam, Revetment Riprap ......... TON ................ $75.00
Temporary Check Dam, Traversable.................... LFT ................. $20.00
Temporary Filter Berm ......................................... LFT ................. $20.00
Temporary Filter Stone......................................... TON ................ $54.00
Temporary Geotextile........................................... SYS ................. $3.50
Temporary Inlet Protection................................... EACH ............. $130.00
Temporary Mulch Stabilization ............................ SYS ................. $0.40
Temporary Mulch ................................................. TON ................ $510.00
Temporary Revetment Riprap .............................. TON ................ $70.00
Temporary Sediment Basin .................................. EACH ............. $3,800.00870
Temporary Sediment Trap .................................... TON ................ $51.00
Temporary Seed ................................................... LBS ................. $3.30
Temporary Silt Fence ........................................... LFT ................. $2.75
Temporary Slope Drain ........................................ LFT ................. $25.00
Weekly Inspection ................................................ EACH ............. $510.00
The cost for revisions or amendments to permits required due to the Contractor’s
means and methods shall be included in the cost of SWQCP Preparation.
The cost for any future revisions to the SWQCP due to the Contractor’s means880
and methods shall be included in the cost of SWQCP Preparation.
The costs for trenching, backfilling, posts, fencing, and all necessary incidentals
shall be included in the cost of temporary silt fence.
The costs for protected resource fence shall include all materials, placement,
removal, maintenance, and all necessary incidentals.
205.11
214
The costs for protected resource signs shall include all materials, placement,
removal, maintenance, and all necessary incidentals.890
The cost for stakes, trenching, backfilling, posts, and all necessary incidentals
shall be included in the cost of temporary check dams, traversable.
The payment for temporary sediment basin shall include all costs involved with
construction of the basin except for excavation, revetment riprap, and filter stone.
The payment for temporary sediment trap shall include all costs involved with
construction of the trap except for excavation.
900
Temporary entrances utilized by the Contractor for borrow and waste areas will
not be paid for directly.
The costs for diversion interceptor Type A and Type B and interceptor ditches
shall be included in the cost of other earth moving items.
The cost for anchors and all incidentals necessary to perform the work shall be
included in the cost of temporary slope drains.
The costs of materials, installation, inspection, maintenance, and removal of910
BMPs at off-site locations designated in 205.03 will not be measured for payment.
The payment for BMPs specified herein shall include materials, installation,
maintenance, removal and proper disposal.
The costs associated with sediment removal due to BMP maintenance shall be
included in the cost of sediment removal.
The costs associated with the replacement of temporary filter stone due to BMP
maintenance will be paid for as temporary filter stone.920
The costs of constructing, maintaining, and removal of the construction entrance,
other than those constructed by the Contractor for borrow and waste sites, shall be
included in No. 2 stone. No direct payment will be made for construction entrances
for borrow and waste sites.
The costs associated with concrete washout will not be paid for directly but shall
be included in the costs of other concrete pay items.
All costs associated with the weekly and pre- and post-event inspections,930
including inspections required by regulatory agencies, and all other inspections
conducted prior to the contract completion date, shall be included in the cost of
Stormwater Management Implementation.
205.11