210.01Description

This work shall consist of trimming and cleaning the otherwise completed highway between right-of-way lines for its entire contract length.

210.02Construction Requirements

At the time of acceptance, the following conditions shall prevail for the entire contract length and also for the full right-of-way width except as hereinafter provided. 208.08

Debris and rubbish shall be removed and disposed of in accordance with 201.03.

Remaining loose stones and broken mas onry meeting the aggregate requirements for hand laid or grouted riprap shall be stored in neat piles on the right-of-way as directed.

Weeds, brush, and stumps shall be cut close to the ground. Disposal shall be in accordance with 201.03 and 203.08.

Cut and fill slopes made or disturbed shall be left reasonably smooth and uniform. 20 Loose and overhanging rock shall be removed.

Floors, roadways, railings, bottom chords, shoes, and seats of bridges shall be cleaned of rubbish, sand, stone, gravel, and dirt. Waterways shall be left unobstructed. Culverts and other drainage structures shall be left clean for their entire length.

If the contract is for construction of a new pavement or for grading and structures only on a right-of-way acquired for divided highway construction, one roadway of which has been constructed and on wh ich the Department has assumed normal maintenance, the provisions of this specification shall not apply to the maintained 30 portion except to those areas of such which are disturbed by the operations.

If the contract is for construction of a portion of a divided highway on a right-of- way on which no previous construction has been done or on a divided highway right-of-way on which a previous grading-only contract has been completed, then the provisions of this specification shall apply to the entire right-of-way for the full contract length.

Unless otherwise set out in the special provisions for a contract which includes work for patching, widening, resurfacing, surface treating, undersealing, or for a 40 combination of these, or for a contract through which traffic is being maintained during construction, these requirements will apply only to that portion of the right-of-way disturbed by the operations.

210.03Method of Measurement

Final trimming and cleaning will not be measured for payment unless otherwise provided.

210.04Basis of Payment

Final trimming and cleaning will not be paid for directly. The cost thereof shall 50 be included in the cost of other pay items.

210.04

Get an email when 210 changes

Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Indiana Standard Specifications, 2024 Edition. Pages 246–0 of 1,248. View official source ↗

Ask about this section

Scoped to Indiana 2024 INDOT Standard Specifications, Section 210 — FINAL TRIMMING AND CLEANING. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.