212.01Description

This work shall consist of excavating selected road material from within the construction limits and stockpiling it on the right-of-way at designated locations. It also includes any subsequent removal of the material from the stockpile, if to be used in the work.

212.02Materials

Any material to be excavated and stockpiled will be specifically named and 10 described in the special provisions and may include rock, top soil, material in accordance with 211.02, or any other material selected, any of which may be excavated as common excavation.

After the selected material is stockpiled it shall be known as stockpiled selected material and if any of this material is required to be removed from the stockpile and used in the work, its removal and its incorporation into the work shall be known as salvaged stockpiled selected material.

212.03Construction Requirements 20

Selected material shall be excavated fr om specified areas and stockpiled on the right-of-way at designated locations. The depth of excavation shall be as directed.

If the material is required to be taken from the stockpile and utilized in the work, the material so utilized shall be placed in accordance with these specifications as they apply to the nature of the material and the use to which it is put.

212.04Method of Measurement

Stockpiled selected material will be measured in the stockpiles by means of cross- sections by the cubic yard, computed by the average end area method. The volume 30 measured as salvaged stockpiled selected material will be the difference in cubic yards between that of the existing stockpile and that remaining after the material has been 212.01

removed from the stockpile and used. Both stockpiles will be measured by means of cross-sections. The volume will be computed by the average end area method.

If stockpiled selected material is obtained from within the excavation pay limits of new construction, the volume of the material will be deducted from the pay quantities for excavation as shown on the original cross-sections.

212.05Basis of Payment 40

The accepted quantities of stockpiled selected material and salvaged stockpiled selected material will be paid for at the contract unit price per cubic yard, complete in place.

Payment will be made under:

Pay Item Pay Unit Symbol

Stockpiled Selected Material ..................................................... CYS Stockpiled Selected Material, Salvaged .................................... CYS 50

The cost of excavation, hauling, removing material from the stockpile, placing materials, and necessary incidentals shall be included in the cost of the pay items.

Referenced in this section

Get an email when 212 changes

Indiana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Indiana Standard Specifications, 2024 Edition. Pages 254–0 of 1,248. View official source ↗

Ask about this section

Scoped to Indiana 2024 INDOT Standard Specifications, Section 212 — STOCKPILED SELECTED MATERIALS. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.