696 The cuts shall be straight enough that a 1/8 in. plate passes between the parts on any designated straightline cut.
711.30 Blank
711.31 Peening Welds by Means of Ultrasonic Impact Treatment, UIT 440
This work shall consist of removing existing paint, repairing existing cracked welds, peening existing and repaired welds, and painting in accordance with 105.03. Personnel performing NDT shall meet the qualifications specified in 729.04(b). Proof of certification shall be submitted to the Engineer at least two weeks prior to commencing work. UIT shall be performed in accordance with the QCP, which shall be prepared and submitted in accordance with ITM 803. The QCP shall include the Contractor’s experience performing UIT within the last five years, and certification by the 450 manufacturer of the UIT equipment that the personnel performing the work have received sufficient training on the opera tion of the equipment within the past 18 months. The QCP shall be submitted to the Engineer at least two weeks prior to commencing work. All welding shall be in accordance with the applicable section of the Bridge Welding Code. All welding shall be performe d by AWS certified welders. Weld repair shall be in accordance with Bridge Welding Code, Section 5.7. Paint removal shall be in accordance with 619.08(a) and 619.08(i). Painting shall 460 be in accordance with 619.09 and 619.10. Prior to beginning the peening process, all welds shall be in spected in accordance with 729.04(a). The results of the inspec tion shall be submitted in accordance with 729.04(c). Welds needing repair shall be ground and repaired in accordance with the Bridge Welding Code. Peening using ultrasonic impact treatment methods shall be applied to all repaired welds in addition to the welds shown on the plans. UIT shall be performed along the toe of the weld to cause the center of the treatment groove to be at the weld toe. UIT shall be performed to result in a uniform 470 groove with a bright, metallic surface. All non-uniform areas shall be retreated. 711.32 Welds Welding of steel shall be done only as shown on the plans or as specified and only with specific approval. Welding may be performed to remedy minor defects, if approved. No temporary or permanent welds, if not shown on the plans or otherwise specified, shall be made without specific written authorization. (a) AWS Requirements Welding of steel bridges and bridge co mponents shall be performed in accordance 480 with AASHTO/AWS D1.5 Bridge Welding Code, hereinafter referred to as the Bridge 711.30 697 Welding Code. Welders, welding operators, and tack welders shall be qualified in accordance with Bridge Welding Code, Clause 7, Part B. When welding steel structural or steel no n-structural tubing or steel structural supports for highway signs, luminaires, or traffic signals, it shall be performed in accordance with AWS D1.1 Stru ctural Welding Code – Steel, hereinafter referred to as AWS D1.1. Welders, welding operators, and tack welders shall be qualified in accordance with AWS D1.1, Clause 6, Part C.
711.33 Stud Shear Connectors Stud shear connectors shall be in accord ance with 711.32 and as shown on the 580
plans.
711.34 Annealing and Stress Relieving
Structural members which are indicated in the contract to be annealed or normalized shall have finished machini ng, boring, and straightening performed subsequent to heat treatment. Normalizing and full annealing shall be in accordance with ASTM A941. The temperatures shall be maintained uniformly throughout the furnace during the heating and cooling so that the temperatures at two points on the member differ by no more than 100°F at any one time. A record of each furnace charge shall id entify the pieces in the charge and show the temperatures and schedule actually used. Proper instruments, including recording pyrometers, shall be provided for determining the temperature of members in the furnace. The records of the tr eatment operation shall be available and meet approval. Members, such as bridge shoes, pedestals, or other parts which are built up by welding sections of plate together shall be stress relieved in accordance with the procedure of the AWS when required by the plans or as otherwise specified. 711.35 Eyebars Pin holes may be flame cut at least 2 in. smaller in diameter than the finished pin 600 diameter. All eyebars to be placed side by side in the structure shall be securely fastened together in the order that they are placed on the pin and bored at both ends while clamped. Eyebars shall be packed an d match marked for shipment and erection. All identifying marks shall be stamped with steel stencils on the edge of one head of each member after fabrication is completed to be visible when the bars are nested in place on the structure. The eyebars shall be straight and free from twists, and the pin holes shall be located accurate ly on the centerline of the ba r. The inclination of any bar to the plane of the truss shall not exceed 1/16 in. in 1 ft. The edges of eyebars that lie between th e transverse centerline of their pin holes 610 shall be cut simultaneously with two mechanically operated torches abreast of each other, guided by a substantial template to prevent distortion of the plates.
711.36 Facing of Bearing Surfaces The top and bottom surfaces of steel slabs, base plates, and cap plates of columns
and pedestals shall be planed or the plates h eat-straightened. Parts in contact with them shall be faced. Sole plates of beams and girders shall have full contact with flanges. Sole plates and masonry plates shall be planed or heat straightened. 620 711.36 Cast pedestals shall be planed on surfaces to be in contact with steel and shall have surfaces to be in contact with masonry, rough finished. Surfaces of bronze bearing plates intende d for sliding contact shall be finished. The surface finish of bearing plates, base plates, and other bearing surfaces intended to contact each other or with conc rete shall meet the following ANSI surface roughness requirements as defined in ANSI B 46.1: Bridge rollers and rockers ........................................... ANSI 250 Heavy plates in contact with shoes to be welded ......... ANSI 1000 Milled ends of compression members, milled or ground ends of stiffeners and fillers ..................... ANSI 500 Pins and pin holes ........................................................ ANSI 125 Sliding bearings ........................................................... ANSI 125 Steel slabs .................................................................... ANSI 2000
711.37 Pins and Rollers Pins and rollers shall be turned to the dimensions shown on the working drawings 640
and shall be straight, smooth, and free from flaws. Pins and rollers more than 9 in. in diameter shall be forged. Pins and rollers 9 in. or less in diameter may be forged or cold finished carbon steel shafting. In pins la rger than 9 in. in diameter, a hole no less than 2 in. in diameter shall be bored full length along the axis after the forging has been allowed to cool to a temperature below the critical range under suitable conditions to prevent damage by cooling too rapid.
711.38 Boring Pin Holes
Pin holes shall be bored true to the specified diameter, smooth and straight, at right angles with the axis of the member, and parallel with each other unless otherwise 650 required. The final surface shall be produced by a finishing cut. The distance outside to outside of end holes in tension members, and inside to inside of end holes in compression members, shall not vary from that specified more than 1/32 in. Boring of holes in built-up members shall be done after the bolting is completed. 711.39 Pin Clearances The diameter of the pin hole shall not exceed the pin by more than 1/50 in. for pins 5 in. or less in diameter, or 1/32 in. for larger pins.
711.40 Threads for Bolts and Pins 660
Threads for all bolts and pins for structural steel construction shall be in accordance with the Un ited Standard Series UNC-ANSI B 1.1, Class 2A for external threads and Class 2B for internal threads, except that pin ends having a diameter of 1 3/8 in. or more shall be threaded six threads per 1 in. 711.37 701 711.41 Pilot and Driving Nuts Two pilot nuts and two driving nuts for each size of pin shall be furnished, unless otherwise specified.
711.42 Finishing Cast Steel 670
The surface shall be finished as show n on the detail plans. Surfaces marked “finish” shall be made to the exact size and shape, all tool marks shall be removed. If marked “rough finish”, the tool marks need not be removed. There shall be no irregularities greater than 1/32 in. in height on rough finished surfaces.
711.43 Finished Members The several pieces forming a built-up member shall fit together closely and accurately, and the finished member shall be true to line and free from twists, bends,
and open joints. Cover plates on trusses, beams, and girders shall be so nearly straight that variations do not exceed 1/16 in. in 5 ft, with a maxi mum variation not to exceed 3/16 in. at the center of the plates. 711.44 Shop Assembling The field connections of main members of trusses, arches, continuous beam spans, bents, tower faces, plate girders, and rigid frames shall be assembled in the shop with milled ends of compression members in full bearing and then shall have their sub-size holes reamed to specified si ze while the connections are assembled. Assembly shall be full truss or girder assembly unless progressive beam or girder assembly, full chord 690 assembly, progressive chord assembly, or special complete structure assembly is shown on the plans or otherwise specified. Each assembly including camber, alignment, accuracy of holes, and fit of milled joints will be approved before reaming is commenced. A camber diagram shall be furnished by the fabricator showing the camber at each panel point of each truss, arch rib, continuous beam line, plate girder, or rigid frame. When the shop assembly is full truss or girder assembly or special complete structure assembly, the camber diagram shall show the camber measured in assembly. When any of the other methods of shop assembly are used, the camber diagram shall show 700 calculated camber.
711.48 Shop Cleaning and Storage of Weathering Steel
The fabricator shall protect bare steel sections and sub-assemblies so as not to damage or stain them. The use of paints, crayons, or other materials used for identification purposes shall be avoided on bare steel sections. Storage shall be such to enable free drainage to avoid moisture pockets. A sound uniform surface for the formation of a protective oxide coating on all 780 surfaces shall be prepared as follows.
711.49 Furnishing Bolts
Sufficient field bolts shall be furnished to complete the entire structure. 800
711.50 Weighing of Members If it is specified that part of the material is to be paid for by actual weight, finished work shall be weighed in the presence of the inspector, if practicable. Satisfactory
scales shall be supplied and all work involved in handling and weighing the various parts shall be performed. 711.50
711.51 Full Size Tests
When full size tests of fabricated struct ural members or eyebars are required by the contract, the plans or specifications shall state the number and nature of the tests, the results to be attained, and the measurements of strength, deformation, or other 810 performance that are to be made. Suitable facilities, material, supervision, and labor necessary for making and recording the tests shall be provided. The cost of testing, including equipment, handling, supervision, labor, and incidentals for making the tests shall be included in the contract price for structural steel, unless otherwise specified.
711.52 Acceptance Acceptance of any material or finished member shall not preclude its rejection if
found to be defective, either during fabrication or erection. Rejected material shall be replaced and poor workmanship corrected promptly.
711.53 Shipping
Structural members shall be loaded on trucks or cars in such manner that they can be transported to and unloaded at their destination without being excessively stressed, deformed, or otherwise damaged. If required, pins, nuts, bolts, and other small details shall be boxed or crated and the weight of each piece or box marked on it in plain figures. Written permission shall be obtained prior to shipping plate girders with the webs horizontal. 830 Splice plates shall not extend beyond the ends of beams or girders after bolting for shipment. Member lengths shall be subject to the provisions of the current edition of the Oversize-Overweight Vehicular Permit Handbook. The Contractor shall be responsible for obtaining all required transportation permits. 840 ERECTION
711.54 General Requirements
The erection methods shall be those prescribed for the several parts which constitute the finished structure and shall be in accordance with the requirements set forth herein. Workmanship and finish shall be first-class and all work done in a substantial and workmanlike manner in accord ance with these specifications and in reasonable close conformance with the lines, grades, dimensions, and details shown on the plans, or as directed. 850 No erection shall be performed without the approval by the Engineer. Before 711.51 705 starting erection, information shall be fully provided concerning the erection methods and the amount and character of the equipment proposed to be used, which shall be subject to approval. Approval shall not be considered as relieving the Contractor of its responsibility for the safety of its methods or equipment or from carrying out the work in full accordance with th e plans and specifications.
711.55 Delivery of Materials
If the contract is for erection only, the materials used in the finished structure will be provided at the place designated and loaded or unloaded as specified. Material 860 required to be unloaded, shall be unloaded promptly on delivery to the place designated. The Contractor shall be responsible for demurrage charges. 711.56 Handling and Storing Material to be stored shall be placed on skids above the ground. It shall be kept clean and properly drained. Girders and be ams shall be placed upright and shored. Long members, such as columns and chords, shall be supported on skids placed near enough together to prevent injury from deflection. If the contract is for erection only, the material shall be checked against the shipping lists and all shortages or injuries discovered shall promptly be reported in wr iting. The Contractor shall be responsible 870 for the loss or damage of material after receipt.
711.57 Falsework The falsework shall be properly designed and substantially constructed and maintained for the loads which come upon it. Plans for falsework or for changes in an existing structure necessary for maintaining tr affic shall be prepared and submitted for
approval. Approval of these plans shall not be considered as relieving the Contractor of any re sponsibility.
711.58 Bearings and Anchorages 880
Masonry bearing plates shall not be pl aced upon bridge seat bearing areas which are improperly finished, deformed, or irregular. Bearing plates shall be set level in exact position and shall have a full and even bearing on the masonry. The holes shall be drilled and the anchor bolts, except where the bolts or anchor plates are built into the masonry, shall be set. The bolts shall be set accurately and fixed with portland cement grout completely filling the holes. The location of the anchor bolts in relation to the slotted holes in the expansion shoes shall correspond with the temperature at th e time of the erection. The nuts on anchor bolts at the expansion ends of spans shall be adjusted to enable the free movement of the span. 890
711.59 Field Straightening Material If it is necessary to straighten beams, pl ate girders, plates, angles, and other shapes
in the field, it shall be done in accordance with the applicable requirements of 711.11. Before straightening a carrying member, a proposed method of straightening shall be submitted in writing. Approval shall be received prior to commencing the work. 711.59
711.60 Field Assembly of Steel
Parts assembled in the field shall be as sembled accurately as shown on the plans. 900 Matchmarks shall be followed. The materials shall be handled carefully so that no part is bent, broken, or otherwise damaged. Ha mmering which would damage or distort the members shall not be performed. Bearing surfaces and surfaces to be in permanent contact shall be cleaned thoroughly before assembling. Unless erected by the cantilever method, truss spans shall be erected on blocking so placed to give the trusses the required camber. Truss spans shall be completely bolted on the blocking except for stringers and bottom lateral connections which shall be bolted after the span is swung. In emergencies or special cases and with specific approval, truss spans may be swung with main joints fully filled with bolts and drift 910 pins. Structural steel shall be erected using sufficient full size drift pins to enable placement of bolts without damage thereto and to facilitate setting splices to grade. At the time of erection, no less than 50% of the holes in all connections shall be filled with bolts. The bolts shall not be tightened more than snug tight at this stage. Any drifting required shall only be for drawing the parts into position but not sufficient to enlarge the holes or distort the metal. Unfair holes shall be reamed or 920 drilled. All field splices are optional, except as shown on the plans. Splice elevations have been calculated to include structural steel dead load only, with falsework removed. The tops of beam or girder splice plates shal l be adjusted to the splice elevations shown on the plans before bolting field splices. Splices shall be set to grade with the steel unsupported by falsework and prior to final bolting. After bolting is complete, these elevations will be checked. Adjustment shall be made as directed if steel eleva tions are not within allowable tolerances. 930
711.61 Misfits The correction of minor misfits involving harmless amounts of reaming, cutting,
and chipping will be considered a legitimate part of the erection. However, any error in the shop fabrication or deformation resulting from handling and transportation which prevents the proper assembling and fitting up of parts by the moderate use of drift pins or by a moderate amount of reaming and slight chipping or cutting shall be reported immediately and approval of the method of correction shall be obtained. The correction shall be made in the pres ence of the inspector. If the contract 940 provides for complete fabrication and erection, the Contractor shall be responsible for all misfits, errors, and injuries and sh all make the necessary corrections and replacements. If the contract is for erecti on only, the inspector, with the cooperation 711.60 707 of the Contractor, shall keep a correct reco rd of labor and materials used. Within 30 days, an itemized bill shall be presented for approval.
711.62 Pin Connections Pilot and driving nuts shall be used in driving pins. They shall be furnished without charge. Pins shall be driven so that the members take full bearing on them. Pin nuts shall be screwed up tight and the thre ads burred at the face of the nut with a 950
pointed tool.
711.63 Blank
711.64 Diaphragm Connections Diaphragm connections other than those shown on the plans may be allowed. If
other connections are proposed, details shall be submitted for approval. The Contractor shall assume full responsibility for layout of all diaphragm connections and for the accuracy of all fitted parts. Connections will not be allowed which require welding to the web, except at supports. 960
711.65 Bolted Connections Using High Strength Bolts
711.66 Bolted Connections Using Other Than High Strength Bolts Bolts for these connections shall be in accordance with 910.02(h).
711.67 Final Clean-Up
Final clean-up shall be conducted in accordance with 104.07.
711.68 Structural Steel Cutting, Rive t and Bolt Removal, and Drilled Bolt
Holes in Repair Projects Field cutting of structural steel shall be done as shown on the plans or as directed. Rivets or bolts connecting steel at locations shown on the plans or as directed shall be removed. This work shall be done in a manner that does not damage the surrounding steel. If necessary, such work shall be done by drilling. Bolt holes shall be drilled as directed in the field. A bolt hole is a hole required for one bolt drilled through any number and thicknesses of metal plates. 711.69 Jacking and Supporting Beams When jacking and supporting a beam is required on a bridge repair project, the proposed method for jacking and supporti ng shall be submitted for approval. This 1130 work shall not be performed until a method is approved.
711.70 Field Cleaning and Storage of Weathering Steel
Cleaning of structural steel specified to be left unpainted shall be in accordance with 619.08(a), or 619.08(c), or as determined by the Engineer, depending on the severity of the soilage. Foreign matter which adheres to the steel after it has been blasted and which inhibits formation of the oxide film shall be removed as soon as practical. The use of acids to remove scale and stains will not be allowed. Storage shall be such to enable free drainage to avoid moisture pockets. 1140
711.71 Painting
After erection is complete, the structure shall be painted unless otherwise provided. Painting shall be in accordance w ith the applicable requirements of 619. 711.71 712 711.72 Method of Measurement Structural steel shapes, fabricated steel , steel castings, iron castings, bolts, pins, rollers, rockers, anchor bolts, and threaded rods will be measured by the pound. If the Schedule of Pay Items includes a lump sum item for structural steel, all materials listed above shall be included in the pay item. No measurement will be made. 1150 Stud shear connectors placed on new structural steel will not be measured. Stud shear connectors placed on existing structural steel will be measured by the number installed. Bronze plates will be measured by the pound. Pay weight will be based on a theoretical density of 536 lb/cu ft. Volume will be computed based on finished dimensions. No deductions will be made for drilled holes. Field cutting of structural steel will be measured by the square inch as determined 1160 by the multiplication of the length times the depth of the cut. Removal of rivets and removal of bolts will be measured by the number of each removed. Drilled holes for bolts on repair work will be measured by the number of drilled holes. Jacking and supporting structural members will not be measured for payment. Peening will be measured by the linear inch of peened weld. The length of weld peened will be measured once per weld regardless of the number of passes necessary to complete the work as specified. 1170 Repair welds will be measured by the linear inch of repaired weld.
711.73 Basis of Payment
The accepted quantities of structural steel shapes, fabricated steel, steel castings, iron castings, bolts, pins, rollers, rockers, anchor bolts, and threaded rods will be paid for at a contract lump sum price if the Schedule of Pay Items includes a lump sum pay item for structural steel. Changes from the estimated quantities shall be in accordance with 711.73(a). If the Schedule of Pay Items does not in clude a lump sum pay item for structural 1180 steel, the accepted quantities of structural steel will be paid for at the contract unit price per pound for structural steel. Such pay item will include all work listed above, complete in place. Payment will be in accordance with 711.73(b). Stud shear connectors placed on existing structural steel will be paid for at the contract unit price per each, complete in place and accepted. The accepted quantities of bronze plates will be paid for at the contract unit price per pound. The accepted quantities of field structural steel cutting will be paid for at the contract unit price per square inch for structural steel, field cut. The accepted 1190 quantities of rivet removal, bolt removal, and drilled holes will be paid for at the 711.72 713 contract unit price per each for rivet, re move; per each for bolt, remove; and per each for drilled hole. Jacking and supporting structural members, if specified as a pay item, will be paid for at the contract lump sum price for jacking and supporting the types of structural members shown in the Schedule of Pay Items. The accepted quantities of peened weld will be paid for at the contract unit price per inch. The accepted quantities of repaired weld will be paid for at the contract unit 1200 price per inch. Bolts, including anchor bolts and threaded rods, will be paid for as the full weight computed on the basis of 490 lb/cu ft, including nuts and washers, for the actual number of bolts in the structure. If welding is shown on the plans, the weights of the structural steel parts will be computed as described above. The weight of castings will be computed on the basis of 490 lb/cu ft for cast steel, 1210 and 450 lb/cu ft for cast iron, based on the net volume of the finished castings as shown on the plans, including fillets at angles. No deductions will be made for holes required to be drilled in castings or for rounding the corners of castings. (a) Lump Sum Basis An estimated weight of structural steel will be shown on the plans. Such weight will be computed by the same method as th at used when computing the estimated weight when paid for on a unit price per pound basis from semi-detailed plans. This weight will include all structural steel and miscellaneous metals unless otherwise included in specific pay items. 1220 The weight of structural steel shown on the plans is approximate only. For a lump sum pay unit, the Contractor shall determine the weight on which the bid is based. If there is a discrepancy between the plan weight and the actual weight, no decrease or increase in the payment for the work will be made on account of such discrepancy. If a change in the plans is made which will affect the weight of material to be furnished, payment for the addition or reduction of structural steel quantities required 1230 as a result of such change in plans will be made at a unit price per pound obtained by dividing the lump sum amount for structural steel by the total estimated weight of structural steel shown on the plans. Such unit price may be adjusted in consideration of the fabricating and connection cost. Changes in the plans involving classifications of structural steel may increase the pay quantities. Such additional quantities will be paid for on comparison of evidence of invoice prices. 711.73 714 (b) Unit Weight Basis The weight of materials will be shown in the bill of materials on the plans when this information is included in such plans, or as computed from the fabricator’s 1240 approved working drawings when this information is not included in the plans. In either case, such weight shall include all changes ordered. For rolled sections, the gross weight of the steel will be considered. The weight will be figured on the basis of 490 lb/cu ft. Th e weight of each piece will be the weight of the smallest regular shape from which the detail piece can be cut, not deducting cuts or holes. When so shown on the contract plans or on the approved working drawings, the weight of groups of two or more pieces sh all be the weight of the smallest regular shape from which the given group of detail pieces may be cut by properly arranging the cuts. 1250 Payment will be made under: Pay Item Pay Unit Symbol Bolt, Remove ............................................................................. EACH Bronze Plates ............................................................................. LBS Drilled Hole ............................................................................... EACH Jacking and Supporting ________ ............................................ LS structural member type 1260 Peening Weld, UIT .................................................................... INCH Repair Weld ............................................................................... INCH Rivet, Remove ........................................................................... EACH Structural Steel .......................................................................... LS LBS Structural Steel , Field Cut ......................................................... SIN Stud Shear Connectors .............................................................. EACH The cost of paint removal, painting, non-destructive testing, equipment, labor, materials, access, permits, and necessary inci dentals shall be included in the cost of 1270 peening weld, UIT. The cost of drilling holes for anchor bolts, elastomeric bearings, bridge bearing pads, fabrication, painting, erecting falsework, welding material, Charpy V-Notch toughness tests, and necessary incidentals shall be included in the cost of the pay items in this section. The cost of stud shear connectors placed on new structural steel will be included in the cost of structural steel. No increase in pay weight will be considered if diaphragm connections other than those shown on the plans are approved and used. 711.73 715 Shims between beams and top shoes of the thicknesses necessary to adjust the steel to planned elevations shall be furnis hed using either the plan datum or another datum as established. No adjustment will be made to the pay quantities as long as the total weight of shims required does not exceed that planned. No shim shall be less than 1/8 in. in thickness. No allowance in weight will be made for work which is done at the option of the 1290 Contractor. No payment will be made for material used at the convenience of the Contractor in excess of the quantities shown on the plans.