Incidental Construction (600-699)

675When required, structural members shall be secured to the pier or bent with dowel

IN · 2024 Standard SpecificationsBook pages 156158View official source ↗

675 When required, structural members shall be secured to the pier or bent with dowel rods. Holes for dowels shall be filled with mortar at fixed ends and with crack or joint filler at expansion ends. Longitudinal keyway joints shall be cleaned. A coat of cement mortar shall be scrubbed on the surface. The joint shall be filled with a non-shrinking grout composed of 1 part portland cement, 2 parts No. 23 fine aggregate, and an approved non-shrinking additive or a non-shrink, non-metallic cementation grout in 510 accordance with ASTM C1107. All bolts or dr ains shown on the plans as necessary or desirable to be placed in the concrete sh all be placed by the methods and at the locations shown on the plans. Necessary tie rods, tie bolts, and hardware for tying structural members together shall be furnished. Dowel holes shall not be grouted nor concrete or the forming thereof, be placed in floor slabs, diaphragms, or shear keys prior to receipt of complete documentation of the acceptability of the structural members and bearing pads, including the satisfactory laboratory reports and certifica tions in accordance with 915.04(f). Neither the structural members, nor the bearings will be considered incorporated into the work, 520 and neither will be paid for until this documentation is accomplished satisfactorily. Railing, when required, shall be of the type shown on the plans. The component parts shall be in accordance with 706, unless otherwise indicated on the plans. Other precast concrete or precast prestressed concrete structural members shall be placed in the structure in accordance wi th the plans and the specifications or special provisions indicated for the type of structure being built. Cranes or other heavy erection equipment may be operated on the precast concrete or precast prestressed concrete structural members only if approved in writing and if 530 a proposed operating procedure is submitted showing loading, dist ribution of loads, resulting stresses, and that the design of the structural members is satisfactory to handle these loads. However, such approval shall not relieve the Contractor of any damage from this operation.

707.10 Blank

707.11 Method of Measurement

Precast concrete or precast prestressed concrete structural members will be measured by the linear foot. Railing will be measured in accordance with 706.07 if 540 specified as a pay item. Structural steel for intermediate diaphragms will not be measured.

707.12 Basis of Payment

The accepted quantities of precast concrete or precast prestressed concrete structural members will be paid for at the contract unit price per linear foot for structural member, concrete, of the type and size specified. Railing will be paid for in accordance with 706.08 when specified as a pay item. 550 707.12 676 Payment will be made under: Pay Item Pay Unit Symbol Structural Member, C oncrete, ____, ____ ................................. LFT type size Reinforcing bars, WWR, prestressing strands, elastomeric bearing pads, modifications to bearing pads, bearing beams required for box beams, bearing assemblies required for I-beams, bulb-T beams, U-beams, box beams, bearing plates, 560 threaded reinforcing bars, threaded inserts in fascia beams, hex bolts, sealer on the outside face and bottom flange of fascia beams and on the tops of all beams, working drawings and design calcula tions, and necessary incidental s shall be included in the cost of the pay items of this section. The cost of tensioning rods and steel plates shall be included in the cost of the pay items of this section. The cost for providing all molds, cylinder identification tags, facilities, labor, testing, testing apparatuses, required trial ba tches, materials, and all other incidentals 570 necessary to prepare and cure the test speci mens and ensure that the concrete meets the requirements of this specification shall be included in the cost of the pay items in this section. No payment will be made for removing and replacing prestressing strands due to excessive wire breakage, or replacing precast concrete or precast prestressed concrete structural members damaged during handling, storing, transporting, or erecting. The cost of railing shall be included in the cost of the pay items of this section if such railing is not specified as a pay item. 580 The cost of all materials, including galvanizing, labor, and equipment for furnishing and installing steel intermediate diaphragms shall be included in the cost of structural member, concrete of the type and size specified. The cost of time and temperature recording devices and their monitoring shall be included in the cost of the structural members. The cost of a field office or of providing the field office items listed herein shall be included in the cost of the pay items of this section. 590 707.12