Incidental Construction (600-699)

676Payment will be made under:

IN · 2024 Standard SpecificationsBook pages 686687View official source ↗

under:

Pay Item Pay Unit Symbol Structural Member, C oncrete, ____, ____ ................................. LFT type size Reinforcing bars, WWR, prestressing strands, elastomeric bearing pads, modifications to bearing pads, bearing beams required for box beams, bearing assemblies required for I-beams, bulb-T beams, U-beams, box beams, bearing plates, 560 threaded reinforcing bars, threaded inserts in fascia beams, hex bolts, sealer on the outside face and bottom flange of fascia beams and on the tops of all beams, working drawings and design calculations, and necessary incidentals shall be included in the cost of the pay items of this section.

The cost of tensioning rods and steel plates shall be included in the cost of the pay items of this section. The cost for providing all molds, cylinder identification tags, facilities, labor, testing, testing apparatuses, required trial ba tches, materials, and all other incidentals 570 necessary to prepare and cure the test speci mens and ensure that the concrete meets the requirements of this specification shall be included in the cost of the pay items in this section. No payment will be made for removing and replacing prestressing strands due to excessive wire breakage, or replacing precast concrete or precast prestressed concrete structural members damaged during handling, storing, transporting, or erecting. The cost of railing shall be included in the cost of the pay items of this section if such railing is not specified as a pay item. 580

The cost of all materials, including galvanizing, labor, and equipment for furnishing and installing steel intermediate diaphragms shall be included in the cost of structural member, concrete of the type and size specified. The cost of time and temperature recording devices and their monitoring shall be included in the cost of the structural members.

The cost of a field office or of providing the field office items listed herein shall be included in the cost of the pay items of this section. 590 707.12 677

Source: Indiana Standard Specifications, 2024 Edition. Pages 686687 of 1,248.