Payment Line
Defined in the New YorkDOT standard specifications. This is the agency’s own text, with the section it comes from.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
Defines the line from which the work quantity will be measured. Whenever payment lines are indicated, quantities representing work completed will be measured from these lines only. No other lines or locations will be used to measure quantities. Plans. The official contract drawings and applicable standard sheets, which show the location, character, dimensions and details of the work to performed. Precast/Prestressed Concrete Construction Manual (PCCM). The Precast/Prestressed Concrete Construction Manual published by the Office of Structures. The Precast/Prestressed Concrete Construction Manual is a mandatory supplement to the contract documents for contracts which include a wide variety of precast and prestressed concrete units. Professional Engineer. A Professional Engineer licensed or otherwise authorized to practice engineering under Article 145 and registered or otherwise authorized under Article 130 of the New York
Section 101 — Abbreviations and Definitions of Terms →