B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
PricingLog in

STRUCTURE

Defined in the standard specifications of 2 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.

Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.

Alaska · DOT&PF

Bridge, culvert, catch basin, drop inlet, retaining wall, cribbing, manhole, endwall, building, sewer, service pipe, underdrain, foundation drain, or other similar feature that may be encountered in t he work.

Section 101 — DEFINITIONS AND TERMS
New Mexico · NMDOT

Substantial Completion. The day following the last charged day and when all the follo wing items are met: 1. All Critical Path activities on the Project have been completed and deemed Acceptable; 2. The Project is complete such that it can be safely and effectively used by the public; 3. The Contractor has requested a determination of Substantial Completion from the ADE - Construction; and 4. The ADE – Construction has made a determination that the Project i s

Section 101 — Abbreviations, Symbols, T erms, and Definitions
← All defined terms|Browse state DOT specifications →