B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Los Angeles, California Building Permit Cost Calculator

Estimates permit cost in Los Angeles from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Total valuation $0.00 to $100.00
None
see rule
○Total valuation $100.01 to $2,000.00
Flat fee $65.00
$65.00
Total valuation $2,000.01 to $20,000.00
$40.00 plus $1.25 per $100 or fraction thereof of total valuation
see rule
○Total valuation $20,000.01 to $50,000.00
$170.00 base plus $6.00 x 250 = $1,670.00
$1,670.00
○Total valuation $50,000.01 to $100,000.00
$195.00 base plus $5.50 x 250 = $1,570.00
$1,570.00
○Total valuation $100,000.01 to $500,000.00
$395.00 base plus $3.50 x 250 = $1,270.00
$1,270.00
○Total valuation $500,000.01 to $1,000,000.00
$520.00 base plus $3.25 x 250 = $1,332.50
$1,332.50
○Total valuation over $1,000,000.00
$920.00 base plus $2.85 x 250 = $1,632.50
$1,632.50
How this jurisdiction calculates the fee

Building permit fees are calculated from the total valuation of the construction work using Table No. 1-A of the Los Angeles Municipal Code.

Source: published fee schedule · Verified 9/18/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Deck permit fees are calculated from the total valuation of the work using Table No. 1-A of the Los Angeles Municipal Code.

Source: published fee schedule · Verified 8/3/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○General Use Branch Circuits 120V, 1 to 10 branch circuits, each
Flat fee $17.00
$17.00
○Services 0-200A, each
Flat fee $16.00
$16.00
○Panelboards and Switchboards 0-200A, each
Flat fee $16.00
$16.00
○Single-family dwelling and apartment smoke detectors, 1 residential unit
Flat fee $15.00
$15.00
○Miscellaneous Permit
Flat fee $90.00
$90.00
○Minimum permit fee when applying for two or more items, or one item costing more than $55
Flat fee $90.00
$90.00
○Minimum permit fee when applying for one item costing less than $55
Flat fee $55.00
$55.00
○Permit issuing fee
Flat fee $23.00
$23.00
Development Services Center surcharge · add-on
3% of permit sub-total 2, $1.00 minimum — select the permit fee line above to calculate
see rule
System's Surcharge · add-on
6% of permit sub-total 2, $1.00 minimum — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Electrical permit fees are charged per item of work, plus a permit issuing fee and the Development Services Center and systems surcharges.

Source: published fee schedule · Verified 9/18/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Fence permit fees are calculated from the total valuation of the work using Table No. 1-A of the Los Angeles Municipal Code.

Source: published fee schedule · Verified 8/3/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Roofing permit fees are calculated from the total valuation of the work using Table No. 1-A of the Los Angeles Municipal Code.

Source: published fee schedule · Verified 8/3/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

How this jurisdiction calculates the fee

Retaining wall permit fees are calculated from the total valuation of the work using Table No. 1-A of the Los Angeles Municipal Code.

Source: published fee schedule · Verified 8/3/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Each water heater and vent or heat exchanger
Flat fee $28.00
$28.00
○Minimum permit fee when applying for one item costing less than $55
Flat fee $55.00
$55.00
○Minimum permit fee when applying for two or more items, or one item costing more than $55
Flat fee $90.00
$90.00
How this jurisdiction calculates the fee

Plumbing permit fees are charged per item of work, plus a permit issuing fee and the Development Services Center and systems surcharges.

Source: published fee schedule · Verified 9/18/2026

See the full write-up: Los Angeles building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.