Section 158 — Watering for Dust Control
Description
158.01This work consists of providing and applying water for the control of dust caused by the work and public travel.
Material
158.02Conform to the following Subsection: Water for construction 725.01(c)
Construction Requirements
158.03General. Provide an adequate water supply and apply water uniformly across the traveled way as necessary to control dust. Uniformly apply water using pressure -type distributors, pipelines equipped with spray systems, or hoses with nozzles. Apply water at the locations, rates, and frequencies as necessary to control the dust, or as ordered.
(a)Project dust control for public benefit. Control dust within the construction limits as necessary including nights, weekends, and periods of non- work when the project is open to public traffic. When the project is not open to public traffic, control dust in areas of the project that have adjacent residences or businesses. Control dust on approved, active detours established for the project.
(b)Other dust control. Control dust on active haul roads, in pits and staging areas, and on the project during periods not covered in Subsection 158.03(a) .
158.04Acceptance. Water will be evaluated under Subsection 106.02. Providing and applying water will be evaluated under Subsections 106.02 and 106.04.
Measurement
158.05Measure the Section 158 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable: When measuring water for dust control by volume or mass, measure in the hauling vehicle or by metering. Do not measure water for dust control applied according to Subsection 158.03(b) .
Payment
158.06The accepted quantities will be paid at the contract price per unit of measurement for the Section 158 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05 . DIVISION 200